Building work | Bricklaying
Swindon - SN1
Enquiry from: Julian K
Start Date: Immediate
Garden Brick layering work
Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of your home.
This solid wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they will require extra insulation. Normally, this is achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.
In contrast to many ideas, a bricklayer really does more than laying of blocks. There's even more to being a bricklayer than you can probably consider. A single bricklaying projects requires a vast selection of abilities. Allow's take a look at these skills!
This is not just an visual decision, as matching existing brickwork could be a requirement of planning permission or building regulations in your area. We will provide as much as four Bricklayers pros in your area, that will use quotes for the work you desire done. You'll obtain a home visit from specialists in Swindon that'll aid you to select the best Bricklayers for your home prior to performing the installment. Enter your postal code to begin browsing now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Swindon in May 2025
Requests for Bricklayers quotations in Swindon in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in Wiltshire in May 2025. 0% change from April 2025.
The huge town of Swindon can be located to the southwest of England in the county of Wiltshire, having populace of 209,000. Swindon is just 81 miles from London, wedged somewhere between Bristol and Reading. The town is still growing, with population soaring 16.2% since 2001 alone and a expected 39% boost by 2026. Be sure of picking the best prices for your project by comparing quotes from reputable tradesmen.
Swindon - SN1
Enquiry from: Julian K
Start Date: Immediate
Garden Brick layering work
Swindon - SN1
Enquiry from: Chris F
Start Date: Immediate
hi there. i have a garden wall which has partially collapsed due to undermining caused by tree roots. i am seeking quotes to rebuild the collapsed part of the wall, as well as to perform some general ...
Swindon - SN3
Enquiry from: Frank M
Start Date: Immediate
Complete new front wall required.Old wall to be demolished.
Swindon - SN2
Enquiry from: Jacquie C
Start Date: 1 to 3 months
two rooms painted soon and a garage conversion within the next six months are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: bri...
Swindon - SN2
Enquiry from: Clare M
Start Date: Immediate
I'm looking to replace my front wall and adjoining side walls at the front of my house. Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be...
Swindon - SN4
Enquiry from: Paul H
Start Date: Immediate
Home Owner Tudor brick wall to be removed and rebuilt with a more durable quality brick Wall 17.3m of which 10.60 is 4 course and the rest 3 course Please call to appoint *
Chippenham - SN15
Enquiry from: Craig N
Start Date: Immediate
new build of 5 new houses - brickwork, blockwork, lintels etc, everything from ffl up to and including wall plate. need 2/3 gangs to start c 15 february 2023. we will provide lintels, bricks, blocks, ...
Chippenham - SN15
Enquiry from: S
Start Date: Immediate
Take out a present UPVC window and door and replace with a brick wall and window and a new door.
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Swindon.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today