Large Commercial Solar Panels in Tain

Get Large Commercial Solar Panels Prices in Tain

Home > Solar Panels Projects > Commercial solar pv 51kw+ system > Tain

Large Commercial Solar Panels in Tain

Large solar constructions are offered for businesses, colleges and also farms, aiding to reduce electrical energy bills by hundreds of extra pounds every year and also earning an income with Federal government incentives.

 

Big organisations spend a whole lot more yearly on electrical power bills, which is why these bigger installments have actually been particularly created to assist cut that expenditure.Unlike solar panels for your home, these huge scale solar installations featured loads of panels. They are generally positioned on the roof covering or ground, dealing with south or southwest. This guarantees they obtain daylight in all times throughout the year and generate more power.

 

Solar panels work by producing an electric charge. Two layers of semiconducting product accumulate the sunlight's natural rays and also convert the power right into useful electrical for lighting and also appliances. The solar panels are linked to the National Grid making certain a fixed earnings and also various other wonderful advantages.

 

Advantages of solar PV for commercial property, colleges as well as farms. Electrical energy prices are boosting year-in year-out and many people are checking out photovoltaic panels as one of the most practical means to help them cut their spending and make a fixed income.

Average Commercial solar pv 51kw+ system cost in Tain

The cost of large solar panel installations can vary greatly/ Costs fluctuate based on the materials, number of panels, installation position and the business selected.

 

Average price per Commercial solar pv 51kw+ system job in 2025

Avg. price low

Avg. price low
£44,000

Avg. price

Avg. price
£55,000

Avg. price high

Avg. price high
£66,000

£66500

£49875

£33250

£16625

£0

Prices based on actual Commercial solar pv 51kw+ system costs for Tain, as reported by local LeadsDoWork members.

Commercial solar pv 51kw+ system installation cost in Tain 2025

Labour cost £32,500
Material cost £18,750
Waste removal £3,750
Time frame: 1-6 months

Commercial solar pv 51kw+ system searches in June 2025

Commercial solar pv 51kw+ system Projects in Tain in May 2025

324

Requests for quotations in Tain in May 2025

0

Requests for Commercial solar pv 51kw+ system quotations in Tain in May 2025. 0% change from April 2025.

0

Requests for Commercial solar pv 51kw+ system quotations in Highland in May 2025. 0% change from April 2025.

Source: Numbers calculated based on the search volumes in major search engines

Commercial solar pv 51kw+ system searches in cities and towns near Tain May 2025

Tain

Tain is an imperial burgh and parish in the County of Ross, in the Highlands of Scotland. The name stems from the nearby River Tain, the name of which originates from an Indo-European origin significance 'flow'. The Gaelic name, Baile Dubhthaich, implies 'Duthac's community', after a regional saint also known as Duthus. Tain was given its first imperial charter in 1066, making it Scotland's oldest royal burgh, celebrated in 1966 with the opening of the Rose Garden by Queen Elizabeth, the Queen Mother. The 1066 charter, given by King Malcolm III, confirmed Tain as a haven, where individuals can declare the security of the church, as well as an immunity, in which homeowner merchants and also investors were exempt from specific taxes. These brought about the development of the town. Little is known of earlier history although the community owed much of its importance to Duthac. He was an early Christian number, possibly 8th or 9th century, whose temple had become so important by 1066 that it led to the imperial charter. The messed up church near the mouth of the river was stated to have been built on the site of his birth. Duthac came to be a main saint in 1419 and also by the late Middle Ages his shrine was a vital places of trip in Scotland. King James IV came at the very least yearly throughout his reign to attain both spiritual and political aims. A leading landowning household of the location, the Clan Munro, provided political as well as religious figures to the community, including the skeptic Rev John Munro of Tain (passed away ca. 1630). The early Duthac Chapel was the centre of a haven. Fugitives were by practice given sanctuary in several square miles marked by boundary stones. During the First War of Scottish Independence, Robert the Bruce sent his spouse and child to the shelter for safety. The shelter was violated as well as they were captured by forces devoted to William II, Earl of Ross that handed them over to Edward I of England The ladies were required to England as well as kept detainee for several years.

Looking for Commercial solar pv 51kw+ system in Tain?

Get free quotes from local solar panel installers

Get free quotes

Local & reliable solar panel installers near me

Tell us about your commercial solar pv 51kw+ system project

Answer a few quick questions, so we can match you with local solar panel installers who can help.

Find up to 4 solar panel installers in Tain

Get free, no-obligation local commercial solar pv 51kw+ system quotes from 4 verified solar panel installers working in Tain.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

how long does it take to install commercial solar panels?

After making the very important business decision to go solar, you may also want to know just how long it’ll take to complete the installation process and start generating electricity. After all, generating electricity is the main reason you made the switch to solar system. In this post, we’re going to provide you with in depth details on how long it takes to install solar panels as well as the factors that may affect that time.

 

The entire process of solar panels installation and getting them approved isn’t an overnight process. You’ll have to wait for periods for each step of the process whereby one must be completed before moving to the next. The time required to complete each step can, however, vary largely depending on your location, the type of solar panels you opt for, the solar company you hire as well as the number of people that’ll be making the installation. Here are the steps to a solar system installation and the estimated time each are expected to take:

  • Site assessment. Once you chosen your solar company, the first step would be to have a solar professional from the company to visit the site to examine the roof and other features so as to make sure that they’re able to support a solar system. From the initial contact to scheduling the site visit, this step can take up to 1 to 2 weeks
  • Local permitting. This involves getting the right permits from your local authorities. This can take up to 3 to 6 or more weeks.
  • Solar system design. This may take up to a week or two depending on whether or not you need design approval and also where the parts are coming from
  • Installation. This step can take a week or two depending on the size af your solar panel and roof.
  • Inspection. This step can take up to a week depending on where you reside and how quickly the inspector can visit.
  • Utility connection. Depending on your utility company, this step can take up to 2 weeks.
How do you find an installer for commercial solar panels?

Commercial solar panels installation companies are everywhere. However, it’ll be a great mistake to think finding one nearby for your project would be the least of your worries, as both cost and reliability comes into question. This is even more worrisome when you’re fully aware that your solar system potentials can only be fully maximized depending on how well it’s installed and how good your installer is. If you’re also facing the same challenge, then you’ve come to the right place. In this article, we’ll share with you some tips on how to choose a nearby professional and reliable commercial solar panel installer who’ll ensure you get immense value for every penny spent. Let’s take a look!

  • Ask for recommendations. Personal recommendations is always the best way to go, when looking for a commercial solar panel installer or any other tradesperson for that matter. Installation of a commercial solar system is a major undertaking which comes with a lot of costs, so if you’re going to do it the least you can do is ensure you do it right. Carry out your research, ask friends and family, neighbours and loved ones if the know of any reliable commercial solar panel installer in the local area. If they have one they’ve used, you can request for the cost, quality of the job done, the duration of the project and any other detail you feel you should know.
  • Internet. In modern times, you’ll hardly find a progressive-minded business without an online presence. As a result, finding a service on the internet is as simple as it gets. A simple Google search have been helping people find their desired service providers with relative ease for so long. Or use the Quotatis directory to find a commercial solar installer. To get the right commercial solar panel installer online, it’s advisable to check their reviews as well as testimonials before moving forward.
Are there are grants for commercial solar panels?

One of the things that has been on the UK government’s agenda for some time now is to promote the use of renewable energy sources. In fact, the Renewable Energy Directive put out by the EU instructs all member countries to achieve a 20 percent renewable target before the year 2020. The UK’s commitment to this objective has been made quite glaring with a number of funding options that has been put in place to help business owners looking to solar panels on their properties. This commitment was also showcased by a reduction in the cost of solar panels, so new investors have little to worry about. Although there aren’t any grants in the conventional sense, but there are opportunities for solar panel funding in the UK. At present, the only scheme open to new applications is the SEG - Smart Export Guarantee which came into effect on 1st January, 2020.

 

In general, there are four notable incentives in the UK for solar panels which includes the aforementioned Smart Export Guarantee, Reduced VAT on Energy Saving Products, Feed-in Tariff ( no longer open to new applications ), as well as the Renewable Heat Incentive ( RHI - applies only to solar water heating ).

 

Being the only one still open to new applications, we’ll provide you with some insights on SEG. The Smart Export Guarantee allows small scale low-carbon electricity generators to receive payments for surplus energy they’re able to export back to the grid. Although, this is not a direct government scheme, all licensed suppliers are necessitated to offer an export tariff to their customers. Those suppliers with more than 150,000 customers are obligated to offer a tariff, while the suppliers with fewer customers can partake on a voluntary basis.

do you need planning for solar panels commercial building/?

Just like other major house improvement projects, some specific requirements must be met to allow for the installation of solar panels on commercial buildings. The main reason why these standards and regulations were established is to minimize the risk of the solar system becoming an issue or potential hazard in the unforeseeable future. So if you’re thinking about buying and fitting new solar panels, you’ll probably want to know whether or not you’ll require to submit a planning permission application for approval before you can proceed.

 

Fortunately, the installation of solar panels on commercial buildings may be “permitted development which mean you won’t have to apply to the Local Planning Authority for planning permission. There are, however, some important limits and conditions which must be put into consideration in order to benefit from these permitted development rights. Some of the limitations include:

  • The solar panels must be installed on a wall or pitched roof that should project at a maximum of 200mm from the surface of the wall or roof slope.
  • Equipment placed on a roof should not be within one metre of the external edge of that roof.
  • Equipment mounted on a wall must not be within one metre of a junction of that wall with another wall or with the roof of the building
  • If the equipment is on the roof of a building, the capacity for generation of electricity across the entire site must not be more than 1 megawatt.
  • In the situation whereby the panels are installed on a flat roof, the highest part of the equipment should not exceed one metre above the highest part of the roof.

 

In general, obtaining a planning permission is very important and as such, you must discuss your position with your chosen installation company before you proceed.

Placholder Image

Other Top Projects in Tain

Customer Reviews

Overall rating:


Tain Commercial solar pv 51kw+ system installers are rated 4.2 out of 5 based on 2 reviews of 6 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Commercial solar pv 51kw+ system projects that have been connected with Commercial solar pv 51kw+ system pros to help them. All Commercial solar pv 51kw+ system contractors All Tain Commercial solar pv 51kw+ system contractors

Are you a solar panel installer in Tain?

We can help you get more commercial solar pv 51kw+ system work with our qualified job leads and boost your business.

Join today