Driveway Repair
Aberdeen - AB15
Enquiry from: Ugochukwu U
Start Date: Immediate
I need a drainage installed on my driveway
Over 7 reviews & an average rating of 4.7/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Aberdeen - AB15
Enquiry from: Ugochukwu U
Start Date: Immediate
I need a drainage installed on my driveway
Aberdeen - AB24
Enquiry from: Stewart C
Start Date: Immediate
Looking to have a 20mm hole in granite wall increased to 40-50mm to allow waste pipe to be inserted. Approx 18 inches thick external wall and 3m high on gable end.
Aberdeen - AB16
Enquiry from: Jim B
Start Date: Immediate
Garden wall has cracked need some of it pulled down and rebuilt
Aberdeen - AB24
Enquiry from: Stewart C
Start Date: Immediate
Looking to have a 20mm hole in granite wall increased to 40-50mm to allow waste pipe to be inserted. Approx 18 inches thick external wall and 3m high on gable end.
Aberdeen - AB24
Enquiry from: Marion W
Start Date: 1 to 3 months
there is noise from the neighbours through the party wall between 2 terraced houses. are you the property owner: relative of owner property type: terrace how many rooms are you looking to have sounds...
Aberdeen - AB12
Enquiry from: Ulkar B
Start Date: Immediate
Hello. I need to put wall in food shop to split it into 2 sections (temporary) to create storage room. Width of wall is about 6000mm and height approximately 3000mm. Would need either double door or w...
Aberdeen - AB11
Enquiry from: Chahat G
Start Date: Immediate
Roof needs to be repaired. Wall Holes need to be filled.
Aberdeen - AB23
Enquiry from: Valerie C
Start Date: Immediate
need roof checked and loft insulated what service do you require for your roof: repair, insulate
Aberdeen - AB23
Enquiry from: Valerie C
Start Date: Immediate
we really need loft insulation and also need roof checked. are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 do you currently have loft ...
Aberdeen - AB21
Enquiry from: Scott R
Start Date: Immediate
Converting free standing garages into living accommodation 80sq mtr planning permission applied for & has been granted. Architects drawings & photos available to quote on. Thank you
Aberdeen - AB11
Enquiry from: CHAHAT G
Start Date: Immediate
We have bought a shop but it needs to be refurnished, painted and the walls are cracked. So we need someone who can do all these jobs
Aberdeen - AB23
Enquiry from: Fanni T
Start Date: Immediate
Good afternoon, We are looking to get a office loft insulated. Currently, there is some insulation on some parts of the loft, but other parts are missing, including the missing netting as well.
Aberdeen - AB11
Enquiry from: Andreas F
Start Date: Immediate
I would like to discuss about soundproofing solutions to reduce echoing in our office.
Aberdeen - AB21
Enquiry from: William P
Start Date: Immediate
Interior roof insulation
Aberdeen - AB21
Enquiry from: William P
Start Date: Immediate
Advice on loft insulation
Aberdeen - AB16
Enquiry from: Catriona C
Start Date: Immediate
Hello, we stay in a timber cladding end terraced house. Some of the wooden timber surrounding the patio door at the rear has rotten and needs replacing.
Aberdeen - AB16
Enquiry from: Maggie C
Start Date: Immediate
Cavity wall insulation . 1 bedroom bungalow
Aberdeen - AB12
Enquiry from: Nitin K
Start Date: Immediate
I need quotes for external wall insulation work.
Aberdeen - AB12
Enquiry from: Vytautas R
Start Date: Immediate
Wall insulation
Aberdeen - AB15
Enquiry from: Evelyn M
Start Date: Immediate
Boiler has been moved and space needs to be boarded and plastered
How much do Builders cost? Prices for Builders in 2026 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceBeing the most used room in a house, it’s little surprise kitchen extension are usually one of the most popular requests in the UK. They do not only open up a frequently used space in your home, but also goes a long way to add value to your property. However, to know the value that’ll added you must first determine the cost of building such an extension before moving forward. Generally, a typical kitchen extension will cost within the range of £20,000 to about £50,000 plus VAT, based on the size of your project as well as your location.
In reality, a single accurate cost of a kitchen extension will vary depending on a lot of influencing factors, one of which is the type of the extension. Let’s take a look!
✓ Rear extension. You may want to consider this type, if you do not have sufficient space for a side return. This will extend your kitchen into your garden which implies that you’re going to give up some green space to make this a reality. The average price to have this done in London will be about £30,000 or more including VAT, and about £20,000 plus VAT or more in other areas.
✓ Side return extension. This, normally, isn’t a huge add to your property, but will create a lot of space for your kitchen while also be a lot reasonable in terms of cost. This type will extend your home into an alleyway at the side of your property if any is available there. On average, the cost of the side return extension should be about £50,000 plus VAT in London and a lot less in the other regions.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Presenting with its unique sets of components, the price for every house renovation project varies considerably. Though giving a proper price for the house renovation is not possible, you can generally expect to pay anything between £40,000 and £75,000 for renovating a three-bedroom house.
You must list out all the changes needed since renovation comes with several potential costs. This makes it easier for you to calculate the renovation costs and start planning your budget accordingly.
Let us take a look at some of the crucial factors that affect the cost of renovating a house
• Property size
• Property’s condition and age
• Complexity oof the job
• Structural work
• Building extension work
• The quality of materials, fixtures and finishing
• Decoration
• Location
When it comes to renovating a three-bedroom house, the average cost is around £ 57,000. A new gas supply will cost you around £1,500, depending on the route of the supply. There may other additional costs involved if you are looking to do any work to extend the gas supply line.
The cost of rewiring a house is in the region of £5,750. That price will also be dependent on the complexity of the electrical systems in your house and the size. If you are looking at installing a new set of windows, it can cost you up to £6,000, with the average cost being about £4,250. Replastering walls will add another £2500 to the total budget. A new kitchen will set you back around £7,000, on average including the cost of design, materials and installation. Most renovations will need a new bathroom. Installing a new bathroom will cost you around £4,250.
It’s a fact that a garage conversion can go a long way to add a resale value to a home or property. Therefore, in the event whereby your home already has parking facilities in place you can put into consideration converting your garage into a habitable space which will add to the sales price of the house by adding an extra room or increasing the floor space. So exactly how much does a garage conversion add to your home’s resale value?
Garage conversions can be seen as a cost effective means of adding more space to your house. However, not only does it add space, but can also add up to 20 percent to the value of your home. It’s also a way of adding an extra living space to your home that’s not under strict planning complication unlike the alternatives. Generally, if your garage happens to be connected to your house, the cost of converting it to another room should between £10,000 to £20,000. As a home owner, converting your garage into an extra room can help increase the value of your home by up to £45,000. And if you’re to comply with the set rules under permitted development rights, you may not even require to submit a planning application.
In the event whereby your garage is detached from your house or perhaps you live in a flat ( or maisonette) or a listed building , you’ll need to apply to the local authority before commencing your project. It’s always wise to check if there aren’t any planning conditions attached to your home or property.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
No matter how big or small a building is, it can only be as good as it’s foundation - and that’s a fact! It all starts from the footing and when it isn’t deep enough, unlike badly installed gutters or gapped hardwood flooring, can make the whole building collapse to the ground. Just like any code recommendations, the depth of the footings of your porch is a parameter that must be complied with and adjusted to suit your local code requirements.
As a rule of thumb, you should always dig below the frost line when excavating your footings. At this depth level, the moisture present in the soil will be frozen. Ultimately, this will help the ground to act as a barrier to insulate the soil below the footing from freezing during the cold months. As a result, in regions where the weather is almost always very cold the depth of your footings is expected to be at least 48 inches. But in areas featuring a warm climate, you may be allowed to install your footings on grade.
In addition, it’s compulsory that your footings must be installed at a minimum depth of 12 inches below unsettled soil. However, if you’re constructing the structure into a steep hill’s side or by the side of a retaining wall, it’s required that you maintain the least distance to grade both vertically and laterally. In the event whereby you need to achieve a good lateral barrier, you’ll need to have your foundation dug a lot deeper compared to if it’s on a flat surface. For a more accurate and updated information, you can consult your local building inspection department to get familiar with the requirements in your area.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Aberdeen.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today