Insulation | Loft / Roof
Galston - KA4
Enquiry from: John D
Start Date: Immediate
Loft Rafters
-->
Over 14 reviews & an average rating of 4.8/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Galston - KA4
Enquiry from: John D
Start Date: Immediate
Loft Rafters
Galston - KA4
Enquiry from: Robert Z
Start Date: Immediate
Home Owner Call to Appoint
Galston - KA4
Enquiry from: Kevin P
Start Date: Immediate
Converting garage to living room, boxing in boiler and reversing door movement. Walls already insulated/double insulated/fire-proofed (according to builders( this is new build house)).
Galston - KA4
Enquiry from: H
Start Date: Immediate
Loft insulation was removed by cleaners due to smoke damage. Need quote for supply and fitting of replacement loft insulation.
Ayr - KA8
Enquiry from: John M
Start Date: Immediate
Wall, either breeze block or composite, roughly 15ft long by 6 ft high with topping brick.
Irvine - KA12
Enquiry from: MISS T
Start Date: Immediate
Fitted wardrobes in bedroom
Irvine - KA12
Enquiry from: Aileen B
Start Date: Immediate
Loft insulation supplied and fitted.
Irvine - KA12
Enquiry from: Aileen B
Start Date: Immediate
supply and fit loft insulation are you the property owner: owner of the property property type: other age of property: 1930-70 are you interested in cavity wall insulation: no how many bedrooms do you...
Prestwick - KA9
Enquiry from: Val J
Start Date: Immediate
I need a layer of wall insulation for garage. Could someone give estimate. Thanks Val
Cumnock - KA18
Enquiry from: Derek L
Start Date: Immediate
Roof trusses for house extension
Kilmarnock - KA2
Enquiry from: Greta A
Start Date: Less than one month
bricks repointing and slabs made safe are you the property owner: owner of the property what type of work do you need to have done: brick work, garden work do you have the materials you need in order ...
Ayr - KA7
Enquiry from: Colin L
Start Date: Immediate
customer in ayr areas is looking to do a couple of projects at the moment, and would like quotes for building maintenance.confirmed interest via email at 03/03/2023 09:41.please call to arrange appoin...
Ayr - KA6
Enquiry from: Stacey N
Start Date: Immediate
loft conversion at add a bedroom to my home. are you the property owner: owner of the property property type: semi detached what are you looking to convert the space into: bedroom/s are you looking to...
Irvine - KA11
Enquiry from: Jean M
Start Date: Immediate
We would like our poly- carbonated conservatory roof insulated - I assume with replacement panels also need some info if there are various types.
Ayr - KA6
Enquiry from: Ian V
Start Date: Immediate
repair of hole in wall to next door (semi). the hole is located under the floor in the living room and is big enough for someone to crawl through. it was discovered during recent rennovation work. are...
Kilmarnock - KA1
Enquiry from: Louise C
Start Date: Immediate
Possible loft/ basement conversion
Stevenston - KA20
Enquiry from: Mary M
Start Date: Immediate
on behalf of my daughter.she has loud fan like vibrating niose in small space ceiling of loft.that travels down her bedrm wall.only happens when windy are you the property owner: relative of owner pro...
Kilmarnock - KA1
Enquiry from: Alan M
Start Date: Immediate
sloped ramp at garage door are you the property owner: owner of the property property type: other do you require the bricks to be supplied too: no property type: semi detached how much work would you...
Cumnock - KA18
Enquiry from: Margaret Q
Start Date: Immediate
Extend current kitchen out in to garden area
Kilmarnock - KA1
Enquiry from: George T
Start Date: Immediate
customer made an enquiry for building maintenance and confirmed on the quotatis site they would like quotes from a builder.mr lives in the kilmarnock area and would like a call to discuss options.see ...
How much do Builders cost? Prices for Builders in 2025 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceWith the title of this blog, do not be deceived into thinking the purpose is to encourage you to install an external insulation by yourself. Even as a competent DIYer, it’s not advisable to buy a couple of materials and start slapping it into the wall hoping for the best outcome. External insulation is by no means a DIY job and without the proper training and experience, it can easily turn out disastrous resulting in loss of time, effort and money in such a valuable project. This blog, however, will give you a great insight on how the installation process works and help maximize knowledge ensuring you do not spend more than necessary.
External Insulation Installation
lRender Test
• This is done to ensure the existing render is good enough for insulation support.
• If positive, the insulation can be applied directly onto it.
• If negative, ensure removal of the old render before fitting the insulation.
lPipework Adjustment & Removal
• Remove all pipework prior to insulation fitting
• Install temporary downpipes to ensure water is not wasted and everything continue to function normally during the insulation fitting process.
lWindow Protection
• Protect the window with a protective layer or film.
lStarter Track Fitting
• Determine level you want the insulation to start (height).
• Fit the aluminium start track or carrier tray at the identified level.
lInsulation Boards Fitting
• Apply a layer of adhesive to the board and glue them to the wall in a staggered pattern.
• Cut to fit round all obstructions and windows.
• File off the edge of the board where necessary using a rasp upon successful fitting of the boards
lMechanical Fixing Inclusion
• Hammer around 10 fixings per square metre into the board.
• This is to secure the insulation boards.
lBeading Fitting
• Add corner beads and stop beads to ensure the insulation is secure and to prevent it from making contact with other materials.
lReinforcing Mesh & Render Addition
• Apply two layers of strengthening properties and between the two layers of render, include a fibre glass mesh.
lPrimer Application
• Paint on the primer
lFinal Render Application
• Choose your most preferred texture and colour as this will be the last coating of the installation process.
lPipework Re-installation
• Re-install all detached pipework at the start of the installation process.
It can be very hurtful when you’re looking to get a house and then identifies one that’s almost perfect, but that one thing that’s lacking is significant enough to prevent you from making an offer. For instance, you may like neighbourhood, the lot’s size, the number of bedroom and lots more. However, the only thing that’s holding you from making an offer is the outdated kitchen. This is the point where you wonder whether a mortgage can include the cost of renovation. In this article, we’re going to give you a good insight into this and more. Let’s have a look!
One of the major things your lender will put into consideration when you apply for a mortgage is the price of the property in question. For instance, so you’ve found your “almost perfect home for let’s say £400,000 and the cost of your intended renovation work runs up to about £150,000. In this event, you’re definitely going to find lenders who wouldn’t be too keen to let go of their cash. And that’s mainly due to the fact that lenders are only able to afford you, at best, 95 percent of the purchasing price. In other words, if you really want the house, you’ll have to finance it yourself no matter how much potential you think the house possesses.
This, however, does not mean that you can’t find some mortgage lenders who’ll allow for building costs. They exist, but this will mostly take place when the work is complete and the property is revalued. You may also be lucky enough to get a purchase plus improvements mortgage which allows you to renovate now and pay off the renovations over time at a better interest rate than other loan types.
If you’re about to start your house extension project and wondering how long it’ll take to complete, you’re not alone! This is one of the most common questions that’s asked by homeowners in the UK and across the globe. However, there’s no single precise answer for this as there are multiple factors that’ll affect the length of time it’ll take to complete your home extension. These factors include the size of the construction work as well as whether you’re planning to live in the house after completion or otherwise.
For a single extension, the length of time it’ll take to complete the home extension is normally up to 3 months. So let’s break this down:
As you would have expected, the first step to be taken is the preparation of the site. You start by digging out the footing and preparing the foundation which should take about 2 weeks. This is then followed by the damp course installation as well as the fitting of any drains needed around the extension which will also take a further 2 weeks.
The 5th week will be for the construction of the external walls as well as putting the blockwork in place for the provision of the cavity wall insulation. A further 2 weeks after this, will be dedicated to the installation of the roof structure and the internal walls.
It’s at this junction that you’ll call on your weather proof installer to fit in your uPVC windows and doors. Once done, the gas fitters and electricians will have to be on site to connect power to your new extension building. Subsequently, this will be followed by internal wall plastering as well as breaking through your main house. Once the plaster is dried, decorations completed and all the required furniture and units installed, the extension is ready for use.
Aside from the cold weather not being the most pleasant condition to work in, the winter weather can also cause a lot of problems for construction workers and even more so when you’re working with render. Poor weather conditions can generally cause a lot of harms on the final finish of a render. Below are some of the reasons why you should not consider rendering in a bad weather.
✓ Lime bloom. Render can be impacted by lime bloom as they are subjected to damp conditions and low temperatures while curing. This is due to the fact that cement are intolerant to slower drying conditions especially immediately affect its application.
✓ Top coats can be compromised. Coating are likely to get washed off before they’re even afforded the chance to set if drying conditions are low.
However, because its cold out there doesn’t necessarily imply that work must stop. It’s very possible to render during the winter months but to avoid potential pitfalls, we’ve got some tip that can be of great help. Let’s have a look!
✓ Check the weather forecast. Determine the drying and curing time and watch the forecast for the temperature dropping at night.
✓ Select the most suitable render. There are renders that are suitable for application in low temperatures to about 5℃ or even as low as 1℃. These types of render are fast setting which makes them perfect for the cold condition.
✓ Watch out for frost. Frost and render are enemies. Therefore, it won’t be wise to work with frosted materials, on frosted subtrates or apply below the recommended temperature that’s written on the product’s datasheet.
✓ Protect the finish. Make use of artificial enclosures around the scaffolding to battle adverse weather conditions.
The periods at which noisy work is permitted do vary across the nation because the Control of Pollution Act 1974 provided Local Authorities with the authority to regulate noise from construction sites and similar areas. At the same time as these do differ across unalike councils, the average hours throughout which noisy work is tolerable is usually between 8 am and 6 pm from Monday to Friday. This is usually based on the impression of ‘noisy work’ being carried out, so labours could start earlier to prepare things for the day but then not start carrying out their work until 8 am.
On Saturday’s builders are usually allowed to work between 8 am and 1 pm, but this can differ to some extent with different councils. It does mean that workers can start at the identical time as the rest of the week, but they are generally required to finish a lot prior. On Sundays and Bank Holidays there is not as much of detailed direction on hours, but most councils say that there should be no noisy work taking place. Although these are decent strategies, it is worth examining your Local Authority website as they can change slightly. Noisy work is commonly described as ‘noise audible at the site boundary’ and it may be the case that workers are there outside these hours but are setting up before carrying out noisy work.
Local Authorities also recognise that now and then it is unescapable to work separately to these hours, such as work on railway tracks that must be done when trains are not running. Though, local councils do have the authority to serve an announcement on individuals carrying out building or demolition works and tell them how the work should be carried out to evade a possible lawful noise irritation.
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
It shouldn’t do. Most companies will do all the interior work first, and the last job to do will be creating the opening from the house to the conversion. A reputable company will make sure they cause as little disruption as possible during this time.
Rendering a house comes with a plethora of benefits. Not only is it able to brighten up houses that looks tired especially those with damaged brickwork or having discoloured render, but its also the final step of external wall insulation.
If you own a 3 bed house, you’ll probably want to know just how much it’ll cost to have it rendered. If yes, then you’ve come to the right place! In this article, we aim to look at the cost of rendering a house using the standard 3 bed house as an example. Firstly, it should be stated that there are numerous factors that affects the price of a rendering a house which includes the rendering type, the size of the house, the ease of access, the prep work required, whether or not scaffolding will be needed as well as your location and the quality of the contractor your hire. Out of all these factors, the most significant variables are probably the type of rendering you go for and the size of the house.
There are three types of render and the one you opt for will play a key role in the price of your 3 bed house. In this article, we’re basing our cost estimate for a 3 bed house (3 bed detached) on the size ranging from 110 per square metre to 160 per square metre. Now let’s look at the cost per square metre of each rendering type.
✓ The silicone or acrylic thin coat render is usually the most expensive option of the lot due to the fact that they’re the newest and also the best type of render. This rendering type usually costs within the range of £45 to about £75 per square metre.
✓ The monocouche modern through coloured rendering type are able to offer a decorative and waterproof finish for walls. They usually costs within the range of £35 to about £70 per square metre.
✓ Sand and cement render type is the traditional type which has been applied for several years. This rendering type usually costs within the range of £20 to about £45 per square metre.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Galston.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today