Wall Rendering
Hornchurch - RM11
Enquiry from: Ken C
Start Date: Immediate
Rendering loose approximately 1 metre square. needs rerenderin
Over 420 reviews & an average rating of 4.3/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Hornchurch - RM11
Enquiry from: Ken C
Start Date: Immediate
Rendering loose approximately 1 metre square. needs rerenderin
Benfleet - SS7
Enquiry from: Debbie N
Start Date: Immediate
Fitted wardrobe and maybe a small fold down desk top in a small bedroom
London - SE2
Enquiry from: Edyta R
Start Date: Immediate
Bricklayer to build a front garden brick wall required. Wall is 'L' shaped, in total around 8-9m long by 1m heigh, single skin with 8 single brick columns. The quote to include labour and bonding mate
Chislehurst - BR7
Enquiry from: Barry W
Start Date: Immediate
Some external render repairs then to discuss options for external insulation
Rainham - RM13
Enquiry from: Frasina P
Start Date: Immediate
I would like to do loft isolation of my property (address removed)
Romford - RM3
Enquiry from: Bridget O
Start Date: Immediate
2 stud walls to split the living room and one to seal of the kitchen
Benfleet - SS7
Enquiry from: Brian B
Start Date: Immediate
Bungalow all prepared roof ready for insulation to take place. 50 foot x 30 foot approx a s a p. please
Orpington - BR5
Enquiry from: Hyosil H
Start Date: Immediate
We have a few patches where we parked our electric car has been crumbled. Also some places where foxes walked before it has set weeds are growing
Romford - RM5
Enquiry from: Anhar A
Start Date: Immediate
Driveway wall with gates
Dagenham - RM8
Enquiry from: Karima J
Start Date: Immediate
Loft conversion 2 bedroom and one bathroom
Ilford - IG1
Enquiry from: Eva S
Start Date: Immediate
Small bedroom and bathroom remove of mould, renovation and decorated
Basildon - SS14
Enquiry from: Austine E
Start Date: Immediate
Need to add plasterboard to my garden shed now office and laminated flooring with painting
London - E6
Enquiry from: Purie B
Start Date: Immediate
Need to put stairs to loft
Gravesend - DA12
Enquiry from: John O
Start Date: Immediate
Do a driveway and repair back patio
Hornchurch - RM11
Enquiry from: John C
Start Date: Immediate
Wish to insulate my garage walls as well as its ceiling with a bedroom over it
Gravesend - DA12
Enquiry from: Maria G
Start Date: 1 to 3 months
Submit your free quote for rated tradespeople
Gillingham - ME8
Enquiry from: Mary F
Start Date: Immediate
Insulation in loft is 100mm, needs to be increased to max as per UK standard
Romford - RM7
Enquiry from: Diksha P
Start Date: Immediate
Are you the home owner of that property? - -. are you replacing an existing porch or is this a new build? - -. what material do you require, upvc? - -. what colour do you want it to be? - -. i assume
Dartford - DA2
Enquiry from: Alan B
Start Date: Immediate
Add a first floor and roof to a chalet bungalow and a single story rear extension
Tilbury - RM18
Enquiry from: BARRY B
Start Date: Immediate
Repair or relay existing driveway to the front of thee house
How much do Builders cost? Prices for Builders in 2026 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceThe holy grail of home extensions is basically the need for additional space for living as well as leisure. However, before commencing your home extension project, you’d probably want to know just how big your new building can be. In this article, you’ll find the answer to this question which is also frequently asked by many other home or property owners in the UK.
Besides your budget, there are two other major influencing factors that can determine just how much extra room that can be added. These factors include whether you wish to carry out the extension project under Permitted Development rights which is usually for a smaller project or you’d prefer to opt for a larger project which is covered by Planning Permission.
Apart from the limitations in the size of an extension under Permitted Development, the extensions are also a lot more affordable and consumes less time when compared to the extensions under planning permission. So what exactly is the size limit for an extension under Permitted Development and the ones under Planning Permission?
For a single storey extension, the maximum size that can be constructed without having to submit an application for Planning Permission includes:
• An extension should have a maximum length of 6m, if you reside in a terraced home or a semi-detached property.
• Extensions for detached properties can have a maximum length of 8m.
• The extension built must not go beyond half your garden’s area.
• The extension should have a maximum height of 4 metres, but in the event whereby the extension is situated within 2 metres of the boundary of your property, it should not exceed a height of 3 metres.
• The extension should not be higher than the highest part of the existing house’s roof.
This depends on the amount of insulation already present in your property. However, adding insulation has been proven to improve the energy efficiency of your home and decrease your heating bills, this is more obvious in older properties or where single glazing is still in situ.
The main reason that people use cladding or rendering on their property is the aesthetic benefit. These materials can really boost the appearance of a home. Cladding and rendering can also increase the thermal performance of a property. Speak to a specialist to find out whether your property will benefit.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
There are many different types of extension. For example, you could install an orangery, flat or pitched roof extension, over-structure extension, single or double storey extension or a glass box extension. Which one of these is most suitable will depend on your existing property.
The periods at which noisy work is permitted do vary across the nation because the Control of Pollution Act 1974 provided Local Authorities with the authority to regulate noise from construction sites and similar areas. At the same time as these do differ across unalike councils, the average hours throughout which noisy work is tolerable is usually between 8 am and 6 pm from Monday to Friday. This is usually based on the impression of ‘noisy work’ being carried out, so labours could start earlier to prepare things for the day but then not start carrying out their work until 8 am.
On Saturday’s builders are usually allowed to work between 8 am and 1 pm, but this can differ to some extent with different councils. It does mean that workers can start at the identical time as the rest of the week, but they are generally required to finish a lot prior. On Sundays and Bank Holidays there is not as much of detailed direction on hours, but most councils say that there should be no noisy work taking place. Although these are decent strategies, it is worth examining your Local Authority website as they can change slightly. Noisy work is commonly described as ‘noise audible at the site boundary’ and it may be the case that workers are there outside these hours but are setting up before carrying out noisy work.
Local Authorities also recognise that now and then it is unescapable to work separately to these hours, such as work on railway tracks that must be done when trains are not running. Though, local councils do have the authority to serve an announcement on individuals carrying out building or demolition works and tell them how the work should be carried out to evade a possible lawful noise irritation.
How Much Does A Loft Room Cost
In the event whereby you happen to run out of space in your home and extending sideways or moving out isn’t even a considerable option, the next best solution is to look upwards - the loft. The loft can be converted into a room that can used to satisfy varying purposes, be it a storage room, bedroom, home office, spare bathroom and more. There are a number of loft conversion styles you can go for including a room in loft conversion, dormer style conversion, mansard conversion, or a hip-to-gable conversion. Regardless of your choice, each of the types will not only give you new rooms to enjoy but also add value to your home. However, before getting started, it’s crucial to have an idea of the loft conversion cost to help you prepare a budget and begin planning. Here, you’ll discover the most likely loft room cost for each conversion style you opt for.
• Room In Loft Conversion
This is only suitable for some specific home, but it’s however the most affordable option of the lots. This loft conversion style will cost within the range of £15,000 to £20,000 (prices can be higher in regions where tradesmen are higher in demand such as London and the south east).
• Dormer Loft Conversion
These are relatively simple and straightforward to include in your home. The cost ranges between £31,000 to £58,000 depending on the conversion’s size and other factors.
• Hip To Gable Loft Conversion
This style of loft conversion is more complex than the aforementioned ones, hence they’re usually more costly to complete. The price ranges between £42,000 to £65,000.
• Mansard Loft Conversion
This style of loft conversion is the most complex of the lot and includes a complete overhaul of your loft. The price ranges between £45,000 to £70,000.
• Bungalow Loft Conversion
Any of the main styles above can be done to a bungalow if the planning requirements are fully complied with and if the property is suitable. The price ranges between £30,000 to £70,000.
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Tilbury.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today