Insulation | Cavity Wall
Hawick, Newcastleton - TD9
Enquiry from: Samantha W
Start Date: Immediate
Kitchen and bathroom external walls insulated.
-->
Over 8 reviews & an average rating of 4.7/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Hawick, Newcastleton - TD9
Enquiry from: Samantha W
Start Date: Immediate
Kitchen and bathroom external walls insulated.
Hawick, Newcastleton - TD9
Enquiry from: Sharon W
Start Date: Immediate
Garden r*** x 8ft - 10ft x 7ft. Need a concrete base which I'm in the process of getting.
Melrose - TD6
Enquiry from: Paul B
Start Date: Immediate
Ewi , bungalow requiring ewi
Jedburgh - TD8
Enquiry from: Peter B
Start Date: Immediate
We need to improve the insulation of a large stone built house with cement render finish
Hawick, Newcastleton - TD9
Enquiry from: Hamilton M
Start Date: Immediate
re-rendering of side of building
Kelso - TD5
Enquiry from: Margaret M
Start Date: Immediate
Wall insulation for my park home
Melrose - TD6
Enquiry from: Paul B
Start Date: Immediate
Looking for ewi I live in a dorran constructed bungalow, looking for external insulation
Jedburgh - TD8
Enquiry from: Jenny V
Start Date: Immediate
customer in jedburgh area has requested that we arrange quotes for their building maintenance project.they are considering various options and would like to discuss with a builder directly.please call...
Kelso - TD5
Enquiry from: Sally H
Start Date: Immediate
loft insulation for small 2 story end terraced house are you the property owner: owner of the property property type: terrace how many bedrooms do you have: 1-2 do you currently have loft insulation...
Jedburgh - TD8
Enquiry from: Malcolm T
Start Date: Immediate
loft insulation 270 mm thick for a bungalow lounge ceiling 40 feet x 13 feet easy access are you the property owner: owner of the property property type: detached do you currently have loft insulatio...
Melrose - TD6
Enquiry from: Paul S
Start Date: Immediate
External wall insulation and render
Melrose - TD6
Enquiry from: Paul S
Start Date: Immediate
external wall insulation and render are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 bedrooms property age: 1930-70 please call to app...
Melrose - TD6
Enquiry from: Paul S
Start Date: Immediate
external wall insulation and render are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 bedrooms property age: 1930-70 please call to app...
Jedburgh - TD8
Enquiry from: Peter B
Start Date: Immediate
I wish to improve the insulation in the loft areas and possibly the walls. This is an old stone built walls with lath and plaster.
Kelso - TD5
Enquiry from: Sandra W
Start Date: Less than one month
ms requested quotes for building maintenance from a builder around kelso. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below ...
Hawick, Newcastleton - TD9
Enquiry from: Frances N
Start Date: Immediate
loft insulation in a bungalow are you the property owner: owner of the property how many bedrooms do you have: 3-4 do you currently have loft insulationn: no age of property: 1970-2000 are you intere...
Hawick, Newcastleton - TD9
Enquiry from: Frances N
Start Date: Immediate
ms requested quotes for cavity wall insulation from a builder around hawick, newcastleton. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the i...
Kelso - TD5
Enquiry from: Scot K
Start Date: Immediate
Loft Insulation for a pitched roof on 2 bedroom home
Melrose - TD6
Enquiry from: Piers W
Start Date: Immediate
blown cellulose insulation behind lathe & plaster wall in bedroom.
Kelso - TD5
Enquiry from: Tom C
Start Date: Immediate
customer in kelso area has requested that we arrange quotes for their cavity wall insulation project.mr are considering various options and would like to discuss with a builder directly.please call to...
How much do Builders cost? Prices for Builders in 2025 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceDid you try rendering a wall but it doesn’t turn out the way you would have hoped for? Or perhaps you’ve been watching your wall render gradually deteriorate over time. Regard of your purpose, learning how to repair render cracks on wall is usually a great skill to have with your home maintenance in mind. However, whenever these crack are too large or difficult, we’d recommend you call in a reliable professional who can guarantee the best results for help. In this guide, we’re going to take you through the wall render repairing process. Let’s have a look!
No matter how solid a building material is, over time it’ll yield to the elements. When it comes to wall rendering it may be a case of too much sunshine or a costly mistake in the application process, but in truth, it cracks just because it cracks.
In order to repair render cracks, you’d have to start with a removal of damaged or cracked render. You’ll have to remove all the render or just a small section depending on the area you’re working on. If you’re able to clean all of the existing render as well as the paint over it all (both old and new), then removing a small section would work better as it makes it look neat and redone. Upon the removal of the existing render, the next important step would be to remove all loose material as well. Once done, you can then leave for up to 2 days to allow any trapped moisture to come out. Unfortunately, if the rains you’d have to wait till that dries too before you proceed.
Once dried, you can buy a pre-prepared render mix which already contains cement, lime and sand. Mix a 20kg bag with 4 litres of water (or check the product instructions and follow strictly), the mix to a fine consistency. Render is quick to dry, so you’d want to apply within 30 minutes of mixing. Make use of a trowel to apply the render on the affected spots and blend with the surrounding area.
External Wall Insulation (EWI) is the act of insulating a home by fitting insulation to the exterior parts of the building which in turn improves thermal performance, cuts energy consumption ( savings on energy bill) and also adds to the home’s visual appeal. The systems are built in multiple layers, with the insulation board offering a plethora of options with each being suitable to varying projects and their needs. Installing an external wall insulation comes with a variety of benefits, let’s have a look!
• Thermal Performance Improvement
With EWI, the thermal inertia of the walls are greatly enhanced while also restricting the loss of heat. Ultimately, this lowers heating costs, enhances the comfort of indoor thermal and also reduces CO2 pollution.
• Eliminates Noise Pollution
When the noise levels are high, it can have a bad impact on our overall well being. A great way to reduce the disturbances from the outside like traffic noise is by fitting an External Wall Installation system.
• More Comfortable Living Space
Do you know the damp in homes can contribute to respiratory problems? A properly insulated home will greatly limit the impact of condensation by combating the damp issues. As a result, you can always expect your house to be cosy and comfy irrespective of the season. A cooler summer and warmer spring is guaranteed with EWI.
• Enhances The Property’s Visual Appeal
Looking for an excuse to rejuvenate your home’s aesthetic appeal? Well, you can as well try out adding an EWI system. There are a plethora of unique colours and styles you can pick from to beautify your home effortlessly.
• Adds Value To Property
An insulated home will generally cost more than an uninsulated one at the time of resale. Potential home buyers are more interested in the acquisition of a home with an EWI system due to its various benefits - and a higher demand can only imply a higher price!
The periods at which noisy work is permitted do vary across the nation because the Control of Pollution Act 1974 provided Local Authorities with the authority to regulate noise from construction sites and similar areas. At the same time as these do differ across unalike councils, the average hours throughout which noisy work is tolerable is usually between 8 am and 6 pm from Monday to Friday. This is usually based on the impression of ‘noisy work’ being carried out, so labours could start earlier to prepare things for the day but then not start carrying out their work until 8 am.
On Saturday’s builders are usually allowed to work between 8 am and 1 pm, but this can differ to some extent with different councils. It does mean that workers can start at the identical time as the rest of the week, but they are generally required to finish a lot prior. On Sundays and Bank Holidays there is not as much of detailed direction on hours, but most councils say that there should be no noisy work taking place. Although these are decent strategies, it is worth examining your Local Authority website as they can change slightly. Noisy work is commonly described as ‘noise audible at the site boundary’ and it may be the case that workers are there outside these hours but are setting up before carrying out noisy work.
Local Authorities also recognise that now and then it is unescapable to work separately to these hours, such as work on railway tracks that must be done when trains are not running. Though, local councils do have the authority to serve an announcement on individuals carrying out building or demolition works and tell them how the work should be carried out to evade a possible lawful noise irritation.
A lot of an uninsulated property’s heat is lost through the roof and that’s even more alarming, when you realize this figure is up to a quarter of the total heat of the house. Hence, the tremendous importance of preventing this heat loss through loft insulation which will go a long way to help you against spending unnecessary thousands of pounds on heating bill as well as energy loss.
Loft insulation is an effective method to achieve the desired result, however the question is, how exactly does it work? Well, it’s time to find out!
Using either a fireplace or central heating to heat up your home, a large quantity of that heat would be lost through the roof of your home. Generally, heat rises and when it does, there’s simply no way to prevent it - it’s just science. Escaping by both the conduction and convection methods via your roof, the heat escaping through your ceiling, into the loft space and out into the open air outside can only be significantly reduced by laying loft insulation.
Generally, the added layer of insulation works by trapping the heat inside the room below the loft so as to enable the air within your house to stay warmer for longer. What’s more? The layer of insulation also keeps cold air from the outside from entering your home. As a result, you don’t have to heat your home as much in order to achieve the same temperature for each individual room. Over time, just by doing this you can potentially save hundreds pounds. Getting it installed in your home may actually seem a bit expensive at first, but it’s something that’ll eventually pay off.
It shouldn’t do. Most companies will do all the interior work first, and the last job to do will be creating the opening from the house to the conversion. A reputable company will make sure they cause as little disruption as possible during this time.
If you’re considering rendering your house or property, then you’d most likely want to know whether or not applying for a planning permission will be needed. In several cases, planning permission will not be required for the maintenance, repair as well as replacement of the existing render on your building. These activities are covered by what’s called “Permitted Development Rights, which allows you to carry out some activities without having to apply for a planning permission but always subject to following some strict guidelines. For rendering, as long as the material (render) possesses an identical appearance to those existing on the house as well as same colour, then you will not require a planning permission. However, there are a number of projects that have been highlighted in which a planning permission would be required. These includes the following:
✓ Re-rendering in a colour that different from the original one used on the house or building.
✓ Rendering over brickwork which was not originally covered.
✓ Rendering over pebbledash
✓ Removing pebbledash and replacing it with render.
Another exception to the Permitted Development rights are for houses in conservation areas, national parks or areas of outstanding national beauty.
Although, you wouldn’t normally require to submit a planning application for approval before you apply render, but in truth it’s actually a bit of a grey area which isn’t totally clear and doesn’t allow for much freedom or creativity. And due to this fact, homeowners who wants an absolute peace of mind may opt to apply for planning permission just in case. It’s also worth noting that whether or not a planning permission is required, a huge rendering work will need to comply with building regulations which includes the need to insulate walls on the inside or outside as part of the work on several older properties .
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Roxburghshire.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today