Building Work | Porch
Merriott - TA16
Enquiry from: Beth H
Start Date: Immediate
Front oak porch added around front door
-->
Over 56 reviews & an average rating of 4.3/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Merriott - TA16
Enquiry from: Beth H
Start Date: Immediate
Front oak porch added around front door
Merriott - TA16
Enquiry from: William M
Start Date: Immediate
looking for an extension 12 ft long 10 foot wide and 10 ft high made with red bricks
Bridport - DT6
Enquiry from: Cheryl W
Start Date: Immediate
Cacks at the top of my bedroom wall due to water damage.
Yeovil - BA21
Enquiry from: Natasha W
Start Date: Immediate
wall insulation in extention
Yeovil - BA21
Enquiry from: Sirajul Liton K
Start Date: Immediate
Customer in Yeovil area made an enquiry for Loft Conversion online. Confirmed via phone at 13:23 Please call to arrange an appointment to discuss options
Axminster - EX13
Enquiry from: Susan H
Start Date: Immediate
Render repairs on 4 walls and query complete render on one wall. What I really need is for someone to come out and have a look, I am not even sure what type of render it is.
Beaminster - DT8
Enquiry from: Chaz P
Start Date: Immediate
2 bedrooms 1 bathroom 1 dormer potentially roof raised to accommodate head height, Trusses in roof
Beaminster - DT8
Enquiry from: JAMES H
Start Date: Immediate
Top Up existing Loft Insulation from 6"/7" to 10"/12" in Bungalow of 102 sq.m. approx.
Chard - TA20
Enquiry from: Mark W
Start Date: Immediate
cavity wall insulation to 1960's kitchen extension.
Sherborne - DT9
Enquiry from: Richard S
Start Date: Immediate
I have a converted loft with building regs approval, but would like to add a Dormer.
Crewkerne - TA18
Enquiry from: Debra C
Start Date: Immediate
Rigid loft insulation to create a warm roof
Sherborne - DT9
Enquiry from: Stuart C
Start Date: Immediate
I have a 4 bed property just outside Sherborne which I am looking to install external insulation and I need a design for the system. Is this something you could carry out?
Chard - TA20
Enquiry from: Jon F
Start Date: Immediate
I’m looking for cavity wall insulation quotes. We have a 50mm cavity .
Chard - TA20
Enquiry from: Pauline L
Start Date: Immediate
Our 6 by 9 m drive way is a mess and needs TLC. The quotes so far are too high. We want a tidy job for the least amount
Lyme Regis - DT7
Enquiry from: Florian F
Start Date: Immediate
I am looking to add-on a boot room to my house. Size 2.6m x 3.8m. I do have a drawing. I would like to consider a prefab idea.
Bridport - DT6
Enquiry from: Douglas M
Start Date: Immediate
qoute for updates to existing render in need of repair and upgrading are you the property owner: owner of the property property type: detached how many bedrooms do you have: 3-4 bedrooms how many wall...
Axminster - EX13
Enquiry from: David P
Start Date: Immediate
Greenhouse 12.5ft x 8.5ft dismantling and relocating, including building a suitable base in the new location.
Ilminster - TA19
Enquiry from: William M
Start Date: Immediate
De-render and re-render of 4 bed detached house.
Axminster - EX13
Enquiry from: Mrs R
Start Date: Immediate
cladding for two cottages in one outside render needs to be taken off first. The cottage we are looking for this work for is on an estate agent site. 1 the cottage fenny Bridges Honiton East Devon. Th...
Bridport - DT6
Enquiry from: Melanie-Jane S
Start Date: Immediate
A character property, a barn conversion two beds, garden, car parking space
How much do Builders cost? Prices for Builders in 2025 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceThe best type of insulation for your property will depend on the type of walls and any insulation that’s already present. It’s usually a good idea to have some form of wall insulation as well as loft insulation, as this helps to prevent heat loss in both areas.
With the prices of buying a house skyrocketing, many of us are tempted to building our own house. This is sometimes an excellent choice, but you will first need to understand the costs of building a house from scratch. As per a general estimate, the cost of self-build ranges between £300 per m2 to £3,000 per m2.
As you can see, this is quite a variation in price from lowest to highest. Location is a prime factor in determining the costs. Building a house in London and the South is more expensive compared to other regions. Aside from location, several other factors make up the price.
Self-manage with subcontractors
You hire professionals directly like builders and carpenters. You also buy all the materials yourself allowing you to get the best prices.
Hiring a main contractor with other subcontractors
You will first need a main contractor who will help to create the watertight structure for your house. For the rest of the work, try hiring out subcontractors. Make sure that you buy all the materials yourself to get the best price.
External cladding materials
If you are looking to install other external material other than brick, you will also need to factor in the cost for the same.
Here are some example prices:
• Render on blockwork costs around £25 per m²
• Timber cladding is around £25 per m²
• Hand¬made all-weather tiling costs around £54 per m²
• Rubble walling or flint is around £90 per m²
• Reconstituted stone costs about £48 per m²
• Natural stone is about £75 per m²
Make sure to include these costs when coming up with the estimate.
Roofing materials
Non-standard roofing materials tend to add more to the cost and therefore you will also need to account in for this factor.
Here are some examples:
Welsh slate – £60 per m²
Second-hand slates – £35 per m²
Handmade clay tiles – £65 per m²
Reed thatch – £80/m²
If you choose to add any unique material to your roofing, be sure that you remember to factor in its cost.
It shouldn’t do. Most companies will do all the interior work first, and the last job to do will be creating the opening from the house to the conversion. A reputable company will make sure they cause as little disruption as possible during this time.
Over the years, more and more home and property owners are beginning to realize the huge benefits that can be derived from loft insulation being a worthwhile investment. It’s quite worrisome the way in which energy bills have soared over the past 10 years and loft insulation is a considerable affordable energy efficiency measure that can go a long way to help increase your home’s energy savings.
As far back as the 1980’s, the standard when it comes to insulation thickness was 25 mm to 50 mm which was, at the time, considered to be sufficient. However, building regulations have changed the norm that now states that a new build needs to possess 270 mm of insulation in the loft in order to achieve the required u-value of less than 0.16/m2k based on the standard rock wool or sheep wool insulation.
Generally with loft insulation, there’s a law of depreciating returns which implies that the first couple of insulation centimetres will save you many times the cost of the installation, however an extra layer or centimetre is going to add less value to the point where it’ll no longer be wise or worthwhile to add any further centimetre. Therefore, with cheaper energy prices 30 years back, that additional couple of centimetres was not just worthwhile, but with the recent alarming rises in costs of fuel, that additional £10 savings per year has all of sudden changed to £30 which makes it become a lot more attractive.
If you already have 270 mm of loft insulation, regardless of the material you’re looking to add you’re most likely not going to benefit from a top up. The cost of the materials and installation will definitely be too high for the couple of pounds it’ll save you per year.
With homeowners now a lot more unwilling to move or make any costly extensions due to the uncertainty that lies ahead in the property market of the UK, a garden building which represents a cheaper alternative seems to be the best option available. Not only is it one of the most affordable ways to add space to your home while staying within your budget, but it’s also one of the best ways to add immense value to your property as more and more potential home investors are now seeking properties with an outdoor garden room. They’re the perfect investment for those looking to expand their space without having to carry out huge extension projects which normally consumes both time and money.
Garden rooms are best built by professionals to guarantee the best results. However, if you feel confident enough to undertake the project, then this guide will give you an idea of the process.
✓ Build the foundation. Here you can build the foundation using concrete, but in cases whereby there are root systems closeby then you can make use of low impact screw piles.
✓ Start the construction process with timber frame, SIP panels as well as other modular components and materials
✓ Once you’re done with the construction process, the next course of action will be to develop and position the roof structure on to the top of the newly constructed garden room. Here, you can also decide to use sun pipe and solar heating or PV panels. You can also protect the construction from the elements by making use of cedar cladding.
✓ Doors installation. The best type of doors to use here are draught sealed doors which can also be treated hardwood or powder coated aluminium .
✓ Make the finishing touches here and there and make sure all connections are complete.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
With the title of this blog, do not be deceived into thinking the purpose is to encourage you to install an external insulation by yourself. Even as a competent DIYer, it’s not advisable to buy a couple of materials and start slapping it into the wall hoping for the best outcome. External insulation is by no means a DIY job and without the proper training and experience, it can easily turn out disastrous resulting in loss of time, effort and money in such a valuable project. This blog, however, will give you a great insight on how the installation process works and help maximize knowledge ensuring you do not spend more than necessary.
External Insulation Installation
lRender Test
• This is done to ensure the existing render is good enough for insulation support.
• If positive, the insulation can be applied directly onto it.
• If negative, ensure removal of the old render before fitting the insulation.
lPipework Adjustment & Removal
• Remove all pipework prior to insulation fitting
• Install temporary downpipes to ensure water is not wasted and everything continue to function normally during the insulation fitting process.
lWindow Protection
• Protect the window with a protective layer or film.
lStarter Track Fitting
• Determine level you want the insulation to start (height).
• Fit the aluminium start track or carrier tray at the identified level.
lInsulation Boards Fitting
• Apply a layer of adhesive to the board and glue them to the wall in a staggered pattern.
• Cut to fit round all obstructions and windows.
• File off the edge of the board where necessary using a rasp upon successful fitting of the boards
lMechanical Fixing Inclusion
• Hammer around 10 fixings per square metre into the board.
• This is to secure the insulation boards.
lBeading Fitting
• Add corner beads and stop beads to ensure the insulation is secure and to prevent it from making contact with other materials.
lReinforcing Mesh & Render Addition
• Apply two layers of strengthening properties and between the two layers of render, include a fibre glass mesh.
lPrimer Application
• Paint on the primer
lFinal Render Application
• Choose your most preferred texture and colour as this will be the last coating of the installation process.
lPipework Re-installation
• Re-install all detached pipework at the start of the installation process.
Is there a hole in your asphalt driveway you feel you can repair yourself? If it’s something you know you can confidently do then this step by step guide is just for you. If otherwise, then we’d recommend you hire the services of a reliable professional who can guarantee the best results while also saving you some time and extra money that could result from possible errors. In this article, we’d go over the reparation process of an asphalt driveway with a hole in it.
✓ Get the necessary tools. You’re going to need a broom ( to clean the area), caulking gun ( to fill the hole), a hand tamp a plate compactor or a hammer ( to level the filled in hole) and a weeding glove (just in case there are weeds growing in the hole).
✓ Prepare the area. Do this by weeding the plants or weeds that might have grown inside the hole and identify your asphalt filler.
✓ Wet your soil, if necessary. It’s important to note that this is only necessary if your soil is dry to help the filler stick properly.
✓ Fill in deep holes. If the hole goes down about 3 to 4 inches or more, simply fill it with any material like rocks, clay etc.
✓ Apply the asphalt filler. Fill the hole with the asphalt filler to about half an inch higher than the surface of the driveway.
✓ Level the filler. For a large hole, make use of a plate compactor or a hand stamp, but a hammer will be sufficient for smaller holes.
✓ Cover the hole, if necessary. If your home isn’t level, covering your hole with a piece of plywood is advisable.
✓ Clean off the seal. After the asphalt looks done and in place, simply brush away the debris from the seal to finish off the project.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Merriott.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today