Find a Carpenter you can trust in Huntly.

Choose from 6 Carpenters, all rated by people like you.

Over 1 reviews & an average rating of 3.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Oakwood Trees & Landscaping is a well-established company that has built up an enviable reputation. We pride ourselves on ...

Floors2adoor

0 review(s)
Offers services in HUNTLY
Hello I have 32 year experience working as a carpenter and joiner working all around the uk mainly specializing in hardwoo...
We are your go to local electrical company specialising in all aspects of the electrical industry. We cover all domestic, ...

Recent Carpenter Enquiries

26 Jul

Garden | Sheds

Huntly - AB54

Enquiry from: Sheryl C

Start Date: Immediate

customer in huntly areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via sms and email at 26/07/2021 18:43.please call to arrange appo...

Post a similar request >

14 Aug

Flooring | Wooden

Huntly - AB54

Enquiry from: Anne S

Start Date: Less than one month

property type: commercial have you got a rough idea of the design you would like: some ideas how many bedrooms are you looking to have: 3-4 bedrooms how many storeys are you looking for the property ...

Post a similar request >

03 Jul

Garden | Sheds

Huntly - AB54

Enquiry from: JOHN S

Start Date: Immediate

HI I WOULD LIKE A QUOTE FOR A 12X8 SHED/WORKSHOP. THANK YOU.JOHN SMITH

Post a similar request >

16 Jun

Carpentry

Insch - AB52

Enquiry from: Suzann R

Start Date: Immediate

Replace existing wooden framed windows windows

Post a similar request >

20 May

Carpentry

Turriff - AB53

Enquiry from: Stuart C

Start Date: Immediate

Lead at front of my bedroom window is leaking and the front needs replacing with new.. Do you do that. Also need a new velux window in the roof. Also need a new white upvc window upstairs as there’...

Post a similar request >

09 Apr

Carpentry

Banff - AB45

Enquiry from: Jennifer S

Start Date: Immediate

Front and back door wooden frame repair, new hinges etc.

Post a similar request >

06 Mar

Garden | Sheds

Insch - AB52

Enquiry from: Stewart R

Start Date: Immediate

we need two doors and a window fitted in a large garden shed. preferably use recycled ones we have but open to discussion

Post a similar request >

27 Feb

Carpentry

Banff - AB45

Enquiry from: Heather M

Start Date: Immediate

I would like to get upvc decking built and the base of my static boxed in...is this something you could quote me for ?zI have drawings of what I would like...thanks..Heather.

Post a similar request >

13 Jul

Windows | Wooden | Repair

Insch - AB52

Enquiry from: Ross A

Start Date: Immediate

The house has quality solid wood double glazing circa ~1993. Seems to be rosewood frames. A number of units now have failed seals, including at least one large round window. We'd like a quote repla...

Post a similar request >

30 May

Garden | Decking

Keith - AB55

Enquiry from: Struan M

Start Date: Immediate

customer in the keith area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prope...

Post a similar request >

25 Aug

Garden | Sheds

Banff - AB45

Enquiry from: Anne R

Start Date: Immediate

Something to keep two adults bikes ,garden furniture,mower, garden tools and still have room to potter about . Would like roof to have iron no felt

Post a similar request >

10 May

Garden | Sheds

Banff - AB45

Enquiry from: Margaret B

Start Date: Immediate

weekly / fortnightly gardener services, lawn cutting, leaf clearing, slab cleaning, weeding, tree maintenance. are you the property owner: relative of owner do you have a: medium size garden what leve...

Post a similar request >

26 Apr

Garden | Sheds

Banff - AB45

Enquiry from: Paul S

Start Date: Immediate

wanting concreted for a shed measuring 8x6 feet are you the property owner: tenant (with permission) do you have a: small garden what level of service are you looking for: supply other forms: slab pa...

Post a similar request >

09 Aug

Carpentry

Turriff - AB53

Enquiry from: Johnathan M

Start Date: Immediate

Customer is looking for quotes for Carpentry from pros around Turriff. Please call to arrange appointment to discuss

Post a similar request >

08 Jul

Carpentry

Turriff - AB53

Enquiry from: James D

Start Date: Immediate

Customer in Turriff area made an enquiry for Carpentry online. Confirmed via SMS at 17:43 Please call to arrange an appointment to discuss options

Post a similar request >

11 Sep

Carpentry

Banff - AB45

Enquiry from: Stella S

Start Date: 1 to 3 months

are you the property owner: owner of the property property type: detached how many bedrooms do you have: 5+ property age: pre 1900 what is your current source of heating for the renewable incentive: ...

Post a similar request >

11 Sep

Kitchen | Fitting

Banff - AB45

Enquiry from: Stella S

Start Date: Immediate

are you the property owner: owner of the property property type: detached how many bedrooms do you have: 5+ property age: pre 1900 what is your current source of heating for the renewable incentive: ...

Post a similar request >

04 Aug

Flooring | Wooden

Keith - AB55

Enquiry from: Robin L

Start Date: Immediate

are you the property owner: owner of the property is this for a residential or commerial building: domestic other forms: wood flooring agreed to receive quotes for selected products: yes please call ...

Post a similar request >

19 Mar

Garden | Sheds

Keith - AB55

Enquiry from: Alistair W

Start Date: Immediate

An 8 x 10 greenhouse Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your garden: 31+ m2 Garden Type: Back garden, Front garden Do you have a design: Y...

Post a similar request >

13 Jan

Garden | Sheds

Keith - AB55

Enquiry from: Euan S

Start Date: Less than one month

I am looking for a quote for a 12ft by 8 or 10ft shed with 2 x windows. I would also like to partition up to about 4ft high (at the back of the shed) to make a dog kennel with a hinged roof. also a h...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Huntly is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Huntly £975-£2,495
Carpenters and joiners in Huntly £375-£575
Plasterboard dry lining in Huntly £638-£978
Wood flooring in Huntly £750-£1,150
Wooden decking in Huntly £1,125-£1,725
Garden shed in Huntly £450-£690
Wooden window repair in Huntly £320-£480

Related Carpenter searches in Huntly

Carpenter FAQs

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How much does a stair banister cost?

The flight of steps in your multi-storey household doesn’t have to be purely efficient. With just a little thought given to banister design, the boring flight of stairs can turn into something you would like to show to people and be proud of. Replacement of your banister can even enhance the worth of your property, giving the entry an outstanding presence. But how much will new banisters and spindles cost you?

If you are considering starting with this project, having a help from a professional is always advised.

New banister cost

Banisters are also known as handrails. They are reinforced by balustrades or spindles – a row of pillars that improve the security of the stairway and donate in the direction of the overall look and feel. Banisters and spindles may appear dull due to use over time. A fresh coat of polish might help your staircase get a new facelift.

The cost of new banisters and spindles will fluctuate solely reliant on the material. The price for a new banister starts around £40 for softwood and can reach £120 for a metal one.

Spindle prices are also a contributing factor in determining the cost with prices in the range of £30 to £150 per meter based on the materials used.

How much does a new staircase banister cost?

Hiring a professional is very important when trying to properly install a new banister since they are familiar with the process and work as per safety compliance. Fitting your new banister can be easily taken care by a general builder as well as a carpenter.

Below is a table depicting the average costs of different types of bannisters and spindles:

White oak bannister is around £105 and spindles are around £13.50.

Pine bannister is around £35 and spindles are around £7.

Primed wood bannister costs around £31 and spindles costing around £18.

Metal bannister is around £110 with the spindles being around £6.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Huntly.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Huntly?

View our open Carpenter jobs near you

Join today
View Shortlist