Find a Carpenter you can trust in Westhill.

Choose from 8 Carpenters, all rated by people like you.

Over 1 reviews & an average rating of 3.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Oakwood Trees & Landscaping is a well-established company that has built up an enviable reputation. We pride ourselves on ...

Floors2adoor

0 review(s)
Offers services in WESTHILL
Hello I have 32 year experience working as a carpenter and joiner working all around the uk mainly specializing in hardwoo...
We are your go to local electrical company specialising in all aspects of the electrical industry. We cover all domestic, ...

Recent Carpenter Enquiries

24 May

Garden | Decking

Westhill - AB32

Enquiry from: Nikki M

Start Date: Immediate

decking needs revitalised and not sure what to do. had it painted previously but didn’t last long so possibly needs cleaned and oiled/stained but looking for some advice please are you the property ...

Post a similar request >

23 Feb

Garden | Sheds

Westhill - AB32

Enquiry from: Mike S

Start Date: Immediate

Hello I am looking for a quote to supply and erect the following garden shed. Approx si*** deep x 12ft long 2 x doors on the long side i.e. 12ft. Door 1 at the left side and door 2 at the rig...

Post a similar request >

10 May

Kitchen | Fitting

Westhill - AB32

Enquiry from: Barry H

Start Date: 1 to 3 months

Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required materials for your kitchen already: Yes Agreed to recieve Kitchen S...

Post a similar request >

27 Aug

Garden | Decking

Westhill - AB32

Enquiry from: Ala A

Start Date: Less than one month

80m2 of wood decking in garden, all materials (sand and wood) already provided and bought from wicks. Are you the property owner: Owner of the property Property Type: Detached What level of service d...

Post a similar request >

14 Apr

Garden | Decking

Westhill - AB32

Enquiry from: J P

Start Date: Immediate

APPROX 3.5 X 3.5 m EXISTING WOOD DECKING NEEDS REPLACING WITH EITHER PLASTIC OR PRESSURE-IMPREGNATED WOOD DECKING. CONDITION OF SUPPORTING STRUCTURE UNKNOWN (10 YEARS OLD). Are you the property own...

Post a similar request >

02 Oct

Interior work | Stud Walls

Aberdeen - AB12

Enquiry from: Ulkar B

Start Date: Immediate

Hello. I need to put wall in food shop to split it into 2 sections (temporary) to create storage room. Width of wall is about 6000mm and height approximately 3000mm. Would need either double door or w...

Post a similar request >

23 Apr

Garden | Sheds

Aberdeen - AB11

Enquiry from: Freida A

Start Date: Immediate

Take down shed in kincorth and put it up in Torry 8/6 shed

Post a similar request >

05 Apr

Garden | Sheds

Aberdeen - AB21

Enquiry from: George M

Start Date: Immediate

New shed assembly. Small job.

Post a similar request >

24 May

Carpentry

Aberdeen - AB21

Enquiry from: Kristine R

Start Date: Immediate

We have post that belongs to you. Please collect asap

Post a similar request >

20 May

Garden | Sheds

Aberdeen - AB11

Enquiry from: Alanna C

Start Date: Immediate

Shed base laid and shed built and potentially a new path

Post a similar request >

01 Apr

Garden | Sheds

Aberdeen - AB15

Enquiry from: Alan R

Start Date: Immediate

Old shed removed and group clearance for new shed. Also, new stairs for decking.

Post a similar request >

03 Oct

Interior work | Stud Walls

Aberdeen - AB15

Enquiry from: Evelyn M

Start Date: Immediate

Boiler has been moved and space needs to be boarded and plastered

Post a similar request >

13 Jun

Garden | Sheds

Banchory - AB31

Enquiry from: Steve H

Start Date: Immediate

customer in banchory area has requested that we arrange quotes for their garden shed project.mr are considering various options and would like to discuss with a carpenter directly.please call to discu...

Post a similar request >

20 May

Garden | Decking

Aberdeen - AB15

Enquiry from: Ann R

Start Date: Immediate

Over 10 years ago you landscaped our garden. We now need the decking repaired, the slabs regrouted and some help moving large plants to different locations in the garden. We also need to move the loca...

Post a similar request >

14 Mar

Garden | Sheds

Stonehaven - AB39

Enquiry from: Sam P

Start Date: Immediate

get rid of rubbish and old shed are you the property owner: tenant (with permission) what level of service are you looking for: removal of old do you have a: small garden please call to appoint

Post a similar request >

11 Oct

Garden | Sheds

Aberdeen - AB15

Enquiry from: Mikko H

Start Date: Immediate

the existing garden is not flat, and we want to quote the price to renovate the garden. are you the property owner: owner of the property property type: terrace roughly the size of your garden: 0-10 ...

Post a similar request >

11 Jul

Garden | Decking

Stonehaven - AB39

Enquiry from: Martin P

Start Date: Immediate

decking , paving , for back garden are you the property owner: owner of the property property type: detached garden type: back garden roughly the size of your garden: 11-20 m2 do you have a design: no...

Post a similar request >

13 Jun

Garden | Sheds

Aberdeen - AB10

Enquiry from: Stefania P

Start Date: Immediate

mrs requested quotes for garden shed from a carpenter around aberdeen. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is ...

Post a similar request >

13 May

Garden | Sheds

Aberdeen - AB15

Enquiry from: Gary H

Start Date: Immediate

apex overlap shed with solid sheet roof with installation included thanks are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: supp...

Post a similar request >

25 Apr

Carpentry

Aberdeen - AB15

Enquiry from: Moragh S

Start Date: 1 to 3 months

2 timber doors to be replaced and part of the timer porch are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/doors h...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Westhill is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Westhill £975-£2,495
Carpenters and joiners in Westhill £375-£575
Plasterboard dry lining in Westhill £638-£978
Wood flooring in Westhill £750-£1,150
Wooden decking in Westhill £1,125-£1,725
Garden shed in Westhill £450-£690
Wooden window repair in Westhill £320-£480

Related Carpenter searches in Westhill

Carpenter FAQs

How much does a stair banister cost?

The flight of steps in your multi-storey household doesn’t have to be purely efficient. With just a little thought given to banister design, the boring flight of stairs can turn into something you would like to show to people and be proud of. Replacement of your banister can even enhance the worth of your property, giving the entry an outstanding presence. But how much will new banisters and spindles cost you?

If you are considering starting with this project, having a help from a professional is always advised.

New banister cost

Banisters are also known as handrails. They are reinforced by balustrades or spindles – a row of pillars that improve the security of the stairway and donate in the direction of the overall look and feel. Banisters and spindles may appear dull due to use over time. A fresh coat of polish might help your staircase get a new facelift.

The cost of new banisters and spindles will fluctuate solely reliant on the material. The price for a new banister starts around £40 for softwood and can reach £120 for a metal one.

Spindle prices are also a contributing factor in determining the cost with prices in the range of £30 to £150 per meter based on the materials used.

How much does a new staircase banister cost?

Hiring a professional is very important when trying to properly install a new banister since they are familiar with the process and work as per safety compliance. Fitting your new banister can be easily taken care by a general builder as well as a carpenter.

Below is a table depicting the average costs of different types of bannisters and spindles:

White oak bannister is around £105 and spindles are around £13.50.

Pine bannister is around £35 and spindles are around £7.

Primed wood bannister costs around £31 and spindles costing around £18.

Metal bannister is around £110 with the spindles being around £6.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Westhill.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Westhill?

View our open Carpenter jobs near you

Join today
View Shortlist