Garden | Sheds
Dundee - DD3
Enquiry from: Clair S
Start Date: Immediate
We have ordered a shed for our garden (11x7) this arrives in August. Looking to have this insulated.
Over 8 reviews & an average rating of 4.2/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Dundee - DD3
Enquiry from: Clair S
Start Date: Immediate
We have ordered a shed for our garden (11x7) this arrives in August. Looking to have this insulated.
Dundee - DD2
Enquiry from: Brian R
Start Date: Immediate
Looking for costs to install decking and summer house base in rear garden. Also looking for installers of granite resin for external staircase
Dundee - DD3
Enquiry from: Laura R
Start Date: Immediate
Small area decking at top of garden
Dundee - DD2
Enquiry from: Helena M
Start Date: 1 to 3 months
under stair cupboard built in are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other do you require a door(s): none what l...
Dundee - DD3
Enquiry from: Elaine C
Start Date: Immediate
i have some damaged decking boards (9) that need to be replaced and then the full deck painted. are you the property owner: owner of the property property type: semi detached what level of service do ...
Dundee - DD5
Enquiry from: Alan M
Start Date: Immediate
lay grass turf, pressure wash patio and path, lay weed suppression felt on open soil area, weed beds and, if you offer this, cement repoint patio? happy to speak on phone or you can visit to look as y...
Dundee - DD5
Enquiry from: Graham C
Start Date: Immediate
design and installation of composite decking are you the property owner: owner property type: detached do you have a: small garden garden type: back garden work required: decking current state of gar...
Dundee - DD4
Enquiry from: Jane M
Start Date: Immediate
need 2 doors fitted. frames are also very bad might need replacement too are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors how many w...
Dundee - DD5
Enquiry from: Martin A
Start Date: Less than one month
adjustment/ rehang of front door - appears to be out of alignment with frame, works but is very stiff on the catches are you the property owner: owner of the property property type: semi detached wha...
Dundee - DD2
Enquiry from: MUHAMMAD H
Start Date: Immediate
mr requested quotes for garden shed from a carpenter around dundee. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is wha...
Dundee - DD2
Enquiry from: Christopher C
Start Date: Immediate
remove and dispose of dismantled old rotten shed (approx 8’ x 10’). are you the property owner: relative of owner property type: detached do you have a: small garden garden type: back garden work ...
Dundee - DD4
Enquiry from: Yvonne B
Start Date: Immediate
new fence and shed, lift slabs ,lay grass are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: supply, install, removal of old plea...
Dundee - DD5
Enquiry from: Jakub N
Start Date: Less than one month
looking for someone to assess a feasibility of installing either a sliding door or pocket door between our kitchen and the hallway. upon the recommendation we will purchase the type of door needed and...
Dundee - DD5
Enquiry from: Ian S
Start Date: Immediate
full landscaping services are you the property owner: owner of the property property type: semi detached roughly the size of your garden: 31+ m2 garden type: back garden do you have a design: yes, i h...
Dundee - DD2
Enquiry from: Elizabeth W
Start Date: Immediate
a joiner to buy a shed from and build it and take old one down are you the property owner: owner of the property what level of service are you looking for: supply, install, removal of old do you have...
Dundee - DD4
Enquiry from: Jane F
Start Date: Immediate
Cupboard and wall under stairs taken down and storage area created under stairs.
Dundee - DD5
Enquiry from: Marion Y
Start Date: Immediate
customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: semi detached, work description: raised flower beds shed removal.decking removal add a pond and landscspinh ...
Dundee - DD3
Enquiry from: Jenny S
Start Date: Immediate
need a shed built 10 x 8 are you the property owner: tenant (with permission) do you have a: large garden what level of service are you looking for: supply, install please call to appoint
Dundee - DD5
Enquiry from: Christine H
Start Date: Immediate
we think we may need to replace *** shed we got from you in 1996.we would also like a *** shed. can you give me costs and estimated delivery time please. would there be a discount for 2 sheds? are yo...
Dundee - DD3
Enquiry from: Constance M
Start Date: Immediate
composite decking to be laid at back of house. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Dundee | £975-£2,495 |
| Carpenters and joiners in Dundee | £375-£575 |
| Plasterboard dry lining in Dundee | £638-£978 |
| Wood flooring in Dundee | £750-£1,150 |
| Wooden decking in Dundee | £1,125-£1,725 |
| Garden shed in Dundee | £450-£690 |
| Wooden window repair in Dundee | £320-£480 |
The cost of just the engineered wood flooringis from £18 to £73 per m2.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
• Incorporate flexible wood on concrete adhesives.
• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
• Put 10mm spacers against the wall to see to the consistency in expansion gaps.
• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
• Make use of a porta-nailer.
• Position 10mm spacers against the wall - parallel with the installation direction.
• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Click here to learn more about wood flooring.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Dundee.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today