Windows | Wooden | Repair
Dalry - KA24
Enquiry from: Ann G
Start Date: Immediate
Wood filled or replaced on two bay windows.
-->
Over 42 reviews & an average rating of 4.7/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Dalry - KA24
Enquiry from: Ann G
Start Date: Immediate
Wood filled or replaced on two bay windows.
Dalry - KA24
Enquiry from: Joseph A
Start Date: Immediate
8x6 with base and window and lockable door what level of service are you looking for: supply what level of service are you looking for: supply, install are you the property owner: owner of the proper...
Dalry - KA24
Enquiry from: Ian M
Start Date: Immediate
liking for the price of a 12 x 8 shed with a flat roof a minimum 15ml thick t&g boards also the price of a 10 x 12 shed with the same thickness of wood are you the property owner: owner of the proper...
Dalry - KA24
Enquiry from: Helen S
Start Date: Immediate
5 ft x 7ft max summerhouse
Dalry - KA24
Enquiry from: Lesley B
Start Date: Immediate
Hi I’m looking to replace a 6ft by 8ft shed . Either with one the same size or larger . No more than 6 ft wide . Maybe 6 by 10 ft or 6 ft by 12 ft ? I’m also considering a small summer house th...
Dalry - KA24
Enquiry from: Mike S
Start Date: Immediate
Home Owner Repair to Outside Window Ledge Wood Please Call to Appoint
Kilwinning - KA13
Enquiry from: Jennifer A
Start Date: Immediate
New build stair case renovation bannister replaced with oak. Spindles changed to wood and replacing newell posts and caps. Thank you
Irvine - KA11
Enquiry from: Dayle M
Start Date: Immediate
Looking for estimates and advice on having the back garden either partially or fully landscaped. As a minimum we are looking for an area to be levelled and fenced off with play bark put down as an are...
Beith - KA15
Enquiry from: Amanda D
Start Date: Immediate
Decking supplied and installed
Kilmarnock - KA2
Enquiry from: Linda M
Start Date: Immediate
L shaped kitchen worktops removed and replaced. One sink and one gas hob
Irvine - KA12
Enquiry from: Christine L
Start Date: Immediate
wooden frame on window above entrance door rotting, would need wooden frame replaced. i am looking for a quote please. thanks are you the property owner: owner of the property property type: other wha...
Kilmarnock - KA3
Enquiry from: Patricia B
Start Date: Immediate
7 internal doors to be fitted also hinges, handles and are you the property owner: relative of owner what type of job are you looking to have done: wooden window/doors how many windows do you need: no...
Irvine - KA11
Enquiry from: Graham M
Start Date: Immediate
replace worktops and sink are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your kitchen already: yes a...
Kilwinning - KA13
Enquiry from: Eric M
Start Date: Immediate
8x6 wooden garden shed. requires replacement of several rotting panels (some full length, some partial length) . are you the property owner: relative of owner what level of service are you looking fo...
West Kilbride - KA23
Enquiry from: Margaret R
Start Date: Immediate
6 by 4 wooden shed as cheap as
Kilmarnock - KA1
Enquiry from: Natalie R
Start Date: Immediate
customer made an online enquiry for wooden decking and confirmed on sms and email they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the...
Beith - KA15
Enquiry from: Stewart S
Start Date: Immediate
So where around a 15’ x 8 ‘ maybe slightly longer and slightly narrower. Double door and 2 windows wooden still deciding wether I want a flat or apex roof
Beith - KA15
Enquiry from: Jan B
Start Date: Immediate
move some plants in order to level a new area move slabs and move hut (can be lifted 7 by 7 ) are you the property owner: owner property type: terrace do you have a: medium size garden garden type: ...
Irvine - KA12
Enquiry from: Allan D
Start Date: Immediate
looking for a general / approx quote for wooden decking in garden including prep and materials size - approx 135inches by 190 inches (11ft by 16ft) would imagine just slightly raised though can su...
Kilmarnock - KA3
Enquiry from: Katie W
Start Date: Immediate
garden at the back has been abandoned for a few years apart from the odd grass cut - needs weeding and some tlc are you the property owner: tenant (with permission) property type: detached do you have...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Dalry | £975-£2,495 |
Carpenters and joiners in Dalry | £375-£575 |
Plasterboard dry lining in Dalry | £638-£978 |
Wood flooring in Dalry | £750-£1,150 |
Wooden decking in Dalry | £613-£1,363 |
Garden shed in Dalry | £275-£845 |
Wooden window repair in Dalry | £320-£480 |
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look! Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe. Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs. Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
How Much Plasterboard Do I Need?
Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!
lTake Square Footage Measurement
• Measure the square footage of the area where the plasterboard will be fitted.
• Multiply the height by the width of each wall or ceiling area.
• Add all quantities to obtain a total square-foot amount.
lCalculate Drywall Sheets
• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.
• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).
• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.
We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Dalry.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today