Garden | Sheds
Bracknell - RG42
Enquiry from: Mick B
Start Date: Immediate
Erect a all-Weather Storage Shed & Tool Box 6.8 X 4.3FT FLOOR FOUNDATION INCLUDED
Over 320 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Bracknell - RG42
Enquiry from: Mick B
Start Date: Immediate
Erect a all-Weather Storage Shed & Tool Box 6.8 X 4.3FT FLOOR FOUNDATION INCLUDED
Bracknell - RG12
Enquiry from: Disha T
Start Date: Immediate
I already gave a deck build up but need to expand it
Bracknell - RG12
Enquiry from: Oleksandr P
Start Date: Immediate
replace old wooden deck 14m2 in the back garden are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint
Bracknell - RG12
Enquiry from: Oleksandr P
Start Date: Immediate
replace old wooden deck 14m2 in the back garden are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint
Bracknell - RG42
Enquiry from: Claire F
Start Date: Immediate
i am looking for someone who can fit solid wood in the living room, dinning room, hallway and stair case are you the property owner: owner of the property how many rooms are you looking to update with...
Bracknell - RG12
Enquiry from: MR M
Start Date: 1 to 3 months
i need to fit a new composite front door and a new composite kitchen door to replace the existing wooden doors and frames. i am looking to buy the doors online from justdoorsuk.com and need a quote to...
Bracknell - RG12
Enquiry from: Sunny K
Start Date: Immediate
2x metal sheds to be assembled onto a concrete floor on the side of the house are you the property owner: owner of the property what level of service are you looking for: install do you have a: small...
Bracknell - RG12
Enquiry from: Mark F
Start Date: Immediate
3ft wide 5/6ft depth to fit down side of property installation required are you the property owner: owner of the property what level of service are you looking for: supply, install do you have a: smal...
Bracknell - RG12
Enquiry from: Cheryl L
Start Date: Immediate
are you the property owner: owner of the property property type: terrace other forms: none please call to appoint
Bracknell - RG12
Enquiry from: Wonkyu L
Start Date: Immediate
partition stud wall in the room to make two rooms are you the property owner: owner of the property property type: terrace how many different rooms are you looking to have wall work on: 1-2 rooms what...
Bracknell - RG42
Enquiry from: Kayleigh H
Start Date: Less than one month
we are looking for someone to lay a shed base for us and potentially build a shed depending on costs. thanks time scale: less than one month please call to appoint
Bracknell - RG42
Enquiry from: Daniel B
Start Date: Immediate
customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: to lay a composite decking and build a timber frame to lay it on. 78 square mete...
Bracknell - RG12
Enquiry from: John L
Start Date: 1 to 3 months
old she’d removed new she’d fitted plus new base time scale: 1-3 months please call to appoint
Bracknell - RG12
Enquiry from: Christine K
Start Date: 1 to 3 months
we need 5 doors hanging and all new architrave fitting time scale: 1-3 months please call to appoint
Bracknell - RG12
Enquiry from: Yamuna S
Start Date: Immediate
customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: timber retaining wall sleepers for sloped garden are you the property owner: own...
Bracknell - RG12
Enquiry from: Emma T
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Demolishing and removal of decking and rubbish underneath
Bracknell - RG42
Enquiry from: Shruti J
Start Date: 1 to 3 months
Great, what do you need done? Supply and Installation Need to dispose old shed and put a new one in.
Bracknell - RG12
Enquiry from: Debbie J
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: I require a small wooden decking patio asap, thank you , Debbie
Bracknell - RG12
Enquiry from: Sara H
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Decking the patio and lanscaping the rest of the garden.
Bracknell - RG12
Enquiry from: Jemima O
Start Date: Immediate
To fix venetian blinds Time scale: Immediate Please call to appoint
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Bracknell | £1,475-£3,665 |
| Carpenters and joiners in Bracknell | £375-£575 |
| Plasterboard dry lining in Bracknell | £638-£978 |
| Wood flooring in Bracknell | £750-£1,150 |
| Wooden decking in Bracknell | £663-£3,363 |
| Garden shed in Bracknell | £1,700-£3,030 |
| Wooden window repair in Bracknell | £320-£480 |
Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!
Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
• Incorporate flexible wood on concrete adhesives.
• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
• Put 10mm spacers against the wall to see to the consistency in expansion gaps.
• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
• Make use of a porta-nailer.
• Position 10mm spacers against the wall - parallel with the installation direction.
• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Click here to learn more about wood flooring.
What Is Engineered Wood Flooring?
Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.
Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.
The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:
• Its very easy and simple to install
• When compared to solid wood flooring, it’s more cost effective.
• It can be utilized alongside an under floor heating
• It can be loose laid, meaning it does not need to be fixed in position
• It is available in multiple varieties of wood and finishes
• It can be incorporated alongside an underlay including thermal barriers
• It can be utilized in areas with a fluctuating humidity and temperature.
• It is available in different kinds of thickness.
Click here to learn more about wood flooring.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.
Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.
A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.
As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.
It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.
It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.
Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Bracknell.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today