Garden Decking
Sandhurst - GU47
Enquiry from: Gordon D
Start Date: Immediate
Have two of my front garden stairs come loose need them reset
Over 350 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Sandhurst - GU47
Enquiry from: Gordon D
Start Date: Immediate
Have two of my front garden stairs come loose need them reset
Gerrards Cross - SL9
Enquiry from: Ash B
Start Date: Immediate
I need to fit skirting in Snug Room, Lounge and Dinning room
Egham - TW20
Enquiry from: Nicola S
Start Date: Immediate
I need an estimate for new worktops
Reading - RG6
Enquiry from: Javaria I
Start Date: Immediate
The decking needs to be replced with new one
Staines-upon-Thames - TW19
Enquiry from: Alfred A
Start Date: 1 to 3 months
Cupboard and some storage, doors to be fitted and something else do you require a door(s): back door
Egham - TW20
Enquiry from: Paul C
Start Date: Immediate
Fit two sets of internal double doors to bungalow
East Molesey, West Molesey - KT8
Enquiry from: Peter H
Start Date: Immediate
I need a glass panelled door that connects my corridor to the out side, the door measures 155x45
Slough - SL2
Enquiry from: Derek M
Start Date: Immediate
I am getting a 6x 6 shed and need it putting together, and roof covered and insulated and flooring matting putting down. all parts supplied
High Wycombe - HP13
Enquiry from: Patrick L
Start Date: Immediate
We rent out this property and intend in the long term to replace the entire decking however we want to repair a small badly damaged area before the end of october - i have pictures if required
Twickenham - TW2
Enquiry from: Chris W
Start Date: Immediate
I have 8 wooden windows of varying sizes framing double glazed units. The wooden parts need repairing, including the sills
Twickenham - TW2
Enquiry from: Chris W
Start Date: Immediate
I have double glazed windows fitted to wooden frames, I'm looking for a carpenter to repair/replace the woodwork. I also need to replace the 'Mock Tudor' cladding on the whole house
Windsor - SL4
Enquiry from: Gabriela Z
Start Date: Immediate
We had garden room fitted over the summer but as our garden is a bit on tilt it was built on small legs and now we have a gap between ground and the room. we need someone that comes and make made to m
Woking - GU22
Enquiry from: Russell C
Start Date: Immediate
In our (address removed) we how a large window where the window sill and some of the frame seems to be under attack from something creating saw dust. We will need the window sill replaced and the wind
London - W3
Enquiry from: Miryem B
Start Date: Immediate
I have already bought the floorboards i just need someone to fit them and fix the skirting boards too. it’s for a bedroom which i think is about 13.5 by 10feet
Maidenhead - SL6
Enquiry from: Simon J
Start Date: Immediate
Installation of this shed from Project Timber. No base required. Hobbyist “Tall” H100 Apex Shed – Windowless – Pressure Treated Tongue and Groove
High Wycombe - HP14
Enquiry from: Mark F
Start Date: Immediate
My small shed is located between two brick garages. it needs its roof and floor replacing due to water damage. it’s approx 8 feet by 4 feet. the walls and door are sound
Reading - RG10
Enquiry from: Paul S
Start Date: Immediate
Small amount of back yard decking needs replacing (rotten). approximately 20m x 30m
Marlow - SL7
Enquiry from: Fox S
Start Date: Immediate
Main wall length is 150inches (12.5foot) which starts to slightly slant just above halfway high. as well, attached a small wall next to it, which is mainly a door frame measuring at a length of 45inch
Slough - SL3
Enquiry from: John C
Start Date: Immediate
Hi. i have a very small area of decking at my back patio doors, maybe 3ft x 10ft with ballustrades. there are five steps approx 4ft wide down to the garden i'm looking to replace this all with composi
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Slough | £1,238-£3,748 |
| Carpenters and joiners in Slough | £375-£575 |
| Plasterboard dry lining in Slough | £638-£978 |
| Wood flooring in Slough | £750-£1,150 |
| Wooden decking in Slough | £663-£3,363 |
| Garden shed in Slough | £300-£545 |
| Wooden window repair in Slough | £320-£480 |
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Slough.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today