Garden | Sheds
Thatcham - RG18
Enquiry from: Seamus L
Start Date: Immediate
Assemble plastic shed. Model is Keter Manor ***
Over 315 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Thatcham - RG18
Enquiry from: Seamus L
Start Date: Immediate
Assemble plastic shed. Model is Keter Manor ***
Thatcham - RG18
Enquiry from: Isla S
Start Date: Immediate
Hi there, I need a new bath panel made and fitted and tiling for my downstairs loo. I can provide photos if needed for quoting purposes. Best wishes, Isla Simpson
Thatcham - RG18
Enquiry from: Toby E
Start Date: Immediate
Hi there. I wonder if you can help. We are doing some alterations to our house and are looking for someone to help with various carpentry work. Boot Room (v approx 2.5m x 2.5m) We have...
Thatcham - RG18
Enquiry from: Deb S
Start Date: Less than one month
Are you the property owner: Owner of the property Property Type: Semi detached Other Forms: 92 Agreed to recieve quotes for selected products: Yes Please call to appoint
Thatcham - RG18
Enquiry from: Christopher M
Start Date: 1 to 3 months
We are having a summer house at the top of the garden ,so when it is finished we will want a decking and patio layed Are you the property owner: Tenant (with permission) Property Type: Semi detache...
Thatcham - RG18
Enquiry from: Christopher M
Start Date: 1 to 3 months
We are having a summer house at the top of the garden ,so when it is finished we will want a decking and patio layed Are you the property owner: Tenant (with permission) Property Type: Semi detache...
Thatcham - RG18
Enquiry from: Andy S
Start Date: Immediate
Work description: A decked area to site a 12'x8' Summer House. Would probably need to be 18'x14' to give clearance from exiting structures that would allow maintenance Are you the property owner: Ten...
Thatcham - RG18
Enquiry from: June P
Start Date: Immediate
Worktop over units + centre Island Are you the property owner: Owner of the property What level of service do you require: Install only What is your budget for this project: 0-4k How would you d...
Reading, Thatcham - RG19
Enquiry from: Harvey M
Start Date: Immediate
In-situ enlargement of a hob cut out in an existing granite worktop Are you the property owner: Owner of the property What level of service do you require: Install Only Agreed to receive Kitchen Su...
Reading, Thatcham - RG19
Enquiry from: Joan A
Start Date: Immediate
Property owner: Owner, Work description: Engineered light oak wood floor 56square metre in a park home Are you the property owner: Owner of the property What level of service do you require: Supply...
Reading, Thatcham - RG19
Enquiry from: Judith B
Start Date: Immediate
to fit new kitchen including tile removal plastering, plumbing and electrics Homeowner Please contact to appoint
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Thatcham | £1,238-£3,748 |
| Carpenters and joiners in Thatcham | £375-£575 |
| Plasterboard dry lining in Thatcham | £638-£978 |
| Wood flooring in Thatcham | £750-£1,150 |
| Wooden decking in Thatcham | £663-£3,363 |
| Garden shed in Thatcham | £1,700-£3,030 |
| Wooden window repair in Thatcham | £320-£480 |
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
How To Dot And Dab A Plasterboard
If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!
• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.
• Ensure the wall’s height is 15mm more than the plasterboard
• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.
• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.
• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.
• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.
• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Thatcham.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today