Find a Carpenter you can trust in Stalybridge.

Choose from 58 Carpenters, all rated by people like you.

Over 15 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

16 May

Interior work | Stud Walls

Stalybridge - SK15

Enquiry from: Jonathan W

Start Date: Immediate

I require a wall knocking through on a bedroom & extending by taking a bit from the other bedroom. There are electric sockets on both sides of the wall

Post a similar request >

14 Nov

Carpentry

Stalybridge - SK15

Enquiry from: Jennifer B

Start Date: 1 to 3 months

i need a pre owned rock patio door, 1500x2100 fitting to the back of my property in january. a builder is preparing the opening, i just need the frame, sill, and doors fitting. are you the property ow...

Post a similar request >

23 Feb

Garden | Decking

Stalybridge - SK15

Enquiry from: Trevor M

Start Date: Immediate

homeowner decking supplied and fitted please call to appoint

Post a similar request >

24 Aug

Carpentry

Stalybridge - SK15

Enquiry from: Jan L

Start Date: Less than one month

erection of a 6x4 shed already bought time scale: less than one month please call to appoint

Post a similar request >

10 Jun

Garden | Sheds

Stalybridge - SK15

Enquiry from: Denis M

Start Date: Less than one month

Are you the property owner: Owner Property Type: Semi detached Other Forms: 10085, 13 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

06 Mar

Interior work | Stud Walls

Stalybridge - SK15

Enquiry from: Nick M

Start Date: 1 to 3 months

Property owner Internal activity in house, creating a hallway and snug from an open plan living room which will include creating a new doorway into kitchen, building new internal walls and doorways. ...

Post a similar request >

01 Mar

Interior work | Stud Walls

Stalybridge - SK15

Enquiry from: Nick M

Start Date: 1 to 3 months

Internal activity in house, creating a hallway and snug from an open plan living room which will include creating a new doorway into kitchen, building new internal walls and doorways. Finishing off i....

Post a similar request >

05 Jun

Garden | Decking

Stalybridge - SK15

Enquiry from: R

Start Date: Immediate

Do you have a rough estimate for decking and installation for 3m x 2m

Post a similar request >

23 May

Flooring | Wooden

Stalybridge - SK15

Enquiry from: Jag G

Start Date: Immediate

Home Owner Hardwood underneath and Lino fitting into an L shape room 7ft by 6ft (max) Time scale: Immediate Please Call to Appoint *

Post a similar request >

16 May

Garden | Decking

Stalybridge - SK15

Enquiry from: L

Start Date: Immediate

25 3 metre decking panals

Post a similar request >

12 Feb

Kitchen | Fitting

Stalybridge - SK15

Enquiry from: Ercole P

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 108, Property type: House, Work description: Just to fit worktop to a new kitchen Approximately 7metres

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Stalybridge is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Stalybridge £975-£2,495
Carpenters and joiners in Stalybridge £375-£575
Plasterboard dry lining in Stalybridge £638-£978
Wood flooring in Stalybridge £750-£1,150
Wooden decking in Stalybridge £1,125-£1,725
Garden shed in Stalybridge £450-£690
Wooden window repair in Stalybridge £320-£480

Related Carpenter searches in Stalybridge

Carpenter FAQs

What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
Who makes the best garden sheds?
Who makes the best garden sheds? While you think there might be a straightforward answer, who makes the best shed for you depends on what you need it for, how much space you have and more. We’ll help you find out who makes the best garden shed for you. What to look for in a garden shed Before you fork out for a new shed, consider:
  • What you need the shed for
  • How much space you have
  • How big you need the shed to be
  • Which style of roof you want
  • What material you would like
  • How big your budget is
Once you know the answer to these questions, you can take a look at some of the best brands of garden shed. Shed-Plus Champion Shed-Plus Champion heavy duty sheds are robust wooden garden sheds that have fully ledged and braced doors and integral ‘lock and key’ locking system. They come with a 15-year anti-rot warranty, so should last you a long time; they’re made from 12mm tongue and groove panels which helps to keep them strong and secure for years to come. Our top pick: 8′ x 6′ Heavy Duty Apex Single Door Shed
  • Hand-crafted from Nordic White Spruce
  • Felt roof reinforced with high-grade polyester
  • Tongue and groove cladding makes it more weatherproof so ideal for items that must be kept dry
Forest Garden Forest Garden makes a range of wooden sheds to suit any outdoor space. They offer overlap sheds, which are the cheapest option, shiplap sheds which are tongue and groove, and premium tongue and groove sheds. You’ll be able to find something to suit your budget and your needs. Our top pick: Overlap Pressure Treated 6×4 Pent Shed
  • High eaves for more head height and to store taller items
  • Pent roof and fixed windows allow lots of light
  • Ideal for putting up against a wall or fence
  • Door can be hinged either side
BillyOh BillyOh sheds are affordable wooden sheds that come in lots of shapes and sizes, so you’re bound to find one to suit your garden. They offer wooden floors as an optional extra as well as lots of other things so you can create a bespoke shed that will work best for you. Our top pick: Master Tall Store
  • Ideal for small gardens or those with fewer tools to store
  • Apex roof for water runoff
  • Tongue and groove walls
  • Tall floor-to-gable door
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Stalybridge.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Stalybridge?

View our open Carpenter jobs near you

Join today
View Shortlist