Find a Carpenter you can trust in Widnes.

Choose from 55 Carpenters, all rated by people like you.

Over 22 reviews & an average rating of 4.1/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

17 Jul

Garden | Decking

Widnes - WA8

Enquiry from: Jack Y

Start Date: Immediate

we would like composite decking sourced and installed are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to app...

Post a similar request >

06 Aug

Garden | Decking

Widnes - WA8

Enquiry from: Gill K

Start Date: Immediate

remove back fence, replace and paint. dig out back border, retain some plants, build new border using sleepers and fit lights (not solar). dig out path (approx 50 sq. metres) and concrete clothes line...

Post a similar request >

30 Jul

Carpentry

Widnes - WA8

Enquiry from: Andrew B

Start Date: Less than one month

to fit front door and fit rear door and rear door frame are you the property owner: owner of the property property type: detached do you require a door(s): front door, back door time scale: less than ...

Post a similar request >

22 Jun

Carpentry

Widnes - WA8

Enquiry from: Aidan M

Start Date: 1 to 3 months

we are lloking for our back doorway to be measured so we can the order the door we want and then have yous come and install our new back door are you the property owner: tenant (with permission) do yo...

Post a similar request >

09 Nov

Garden | Decking

Widnes - WA8

Enquiry from: Russell E

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Remove some small trees, cut back other, decking on grassed area and re va...

Post a similar request >

23 Sep

Garden | Decking

Widnes - WA8

Enquiry from: Geoffrey C

Start Date: Immediate

replacing existing contoured wooden decking, approx. 4.5m x 4.3m are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please...

Post a similar request >

14 Jun

Garden | Decking

Widnes - WA8

Enquiry from: Ian F

Start Date: Immediate

3x4 metre area (not quite square so less than 3x4) at bottom of garden. are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and...

Post a similar request >

12 Jun

Interior work | Stud Walls

Widnes - WA8

Enquiry from: Marie A

Start Date: Immediate

Stud wall and door required in dining room of terraced property

Post a similar request >

20 Aug

Carpentry

Widnes - WA8

Enquiry from: Lee C

Start Date: Immediate

Would need Wendy house dismantle and reassembled different locations less then a mile away

Post a similar request >

10 Aug

Garden | Decking

Widnes - WA8

Enquiry from: Jean C

Start Date: 1 to 3 months

Are you the property owner: Tenant (with permission) Property Type: Terrace Other Forms: 18, 92 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

01 Feb

Kitchen | Fitting

Widnes - WA8

Enquiry from: Daniel E

Start Date: 1 to 3 months

Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required materials for your kitchen already: No Are you considering a design...

Post a similar request >

19 May

Garden | Decking

Widnes - WA8

Enquiry from: C

Start Date: Immediate

decking for the patio

Post a similar request >

01 May

Garden | Decking

Widnes - WA8

Enquiry from: Paul M

Start Date: Immediate

Composite decking to butt up from house to pre existing dwarf wall area.

Post a similar request >

16 Feb

Carpentry

Widnes - WA8

Enquiry from: Peter O

Start Date: Immediate

replace one damaged panel Are you the property owner: Owner of the property Property Type: Terrace How many fence panels are you looking for: 1-2 Panels What level of service do you require: Sup...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Widnes is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Widnes £975-£2,495
Carpenters and joiners in Widnes £375-£575
Plasterboard dry lining in Widnes £638-£978
Wood flooring in Widnes £750-£1,150
Wooden decking in Widnes £1,125-£1,725
Garden shed in Widnes £450-£690
Wooden window repair in Widnes £320-£480

Related Carpenter searches in Widnes

Carpenter FAQs

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

Where can I buy kitchen cabinets?

When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!

  • IKEA. One of the best place to buy affordable home goods is also a great place to check if you want to buy your kitchen cabinets. According to a research carried out by J.D Power which surveyed over 1500 customers within the past one year, IKEA’s cabinet system ( Sektion) ranked the highest in terms of the overall satisfaction.
  • KraftMaid. Another winner of the survey conducted by J.D Power as it took the second position when it comes to the overall satisfaction. Therefore, this store happens to be a good option based on the reviews. This store provides you with a wide variety of colour options to select from, so regardless of what your personal preference is, you’re guaranteed to find something worthwhile to install in your kitchen.
  • Stoffer Home. When you buy your kitchen cabinet from an interior designer, there’s a better chance for suitability. Stoffer home offers top quality cabinets which can be manufactured in four various wood finishes and twelve varying paint colours which are all carefully curated.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Widnes.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Widnes?

View our open Carpenter jobs near you

Join today
View Shortlist