Find a Carpenter you can trust in Holywell.

Choose from 43 Carpenters, all rated by people like you.

Over 58 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

Advertisement
View Shortlist

Recent Carpenter Enquiries

28 Apr

Wooden Window Repair

Wirral - CH60

Enquiry from: Quentin M

Start Date: Immediate

Some wooden cladding in between external windows needs replacing. there are 4 x panels approx 200cm x 30cm

Post a similar request >

22 Apr

Wooden Window Repair

Liverpool - L8

Enquiry from: Yvonne M

Start Date: Immediate

Wooden velux rotting in corner

Post a similar request >

04 Dec

Kitchen Fitting

Abergele - LL22

Enquiry from: Kathy J

Start Date: Immediate

Some one to fit the worktops. Sink and hob

Post a similar request >

28 Nov

Carpentry

Wirral - CH47

Enquiry from: Charlotte D

Start Date: Immediate

Floor boards replacing in the hallway

Post a similar request >

12 Nov

Kitchen Fitting

Abergele - LL22

Enquiry from: Kathy J

Start Date: Immediate

Looking for someone to fit kitchen worktops. There is a sink and hob

Post a similar request >

10 Nov

Carpentry

Wirral - CH49

Enquiry from: Denise M

Start Date: Immediate

3 doors need hanging and door handles

Post a similar request >

01 Oct

Garden Shed

Wirral - CH46

Enquiry from: Vincent V

Start Date: Immediate

The installation of a 8x6 base and a new 8x6 apex shed

Post a similar request >

08 Sep

Garden Shed

Buckley, Mold - CH7

Enquiry from: Simon H

Start Date: Immediate

Dismantle a 10’ x 8’ in Chester move to Deeside and reassemble

Post a similar request >

21 Jul

Carpentry

Birkenhead - CH42

Enquiry from: Gail N

Start Date: Immediate

Skirting boards, put on after new floor fitted in through lounge

Post a similar request >

13 Jul

Kitchen Fitting

Holywell - CH8

Enquiry from: Stephen S

Start Date: Immediate

New kitchen from b and q fitting

Post a similar request >

04 Jul

Wooden Window Repair

Wirral - CH60

Enquiry from: Michael R

Start Date: Immediate

Replace the surrounding facia on two dormer windows on the third floor

Post a similar request >

13 Dec

Garden Shed

Abergele - LL22

Enquiry from: Carol T

Start Date: Immediate

Removal and replacement of damaged felt roofing to garden shed

Post a similar request >

31 Oct

Carpentry

Chester - CH4

Enquiry from: Margaret C

Start Date: Immediate

Internal bathroom door fitting with handles

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Holywell is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Holywell £975-£2,495
Carpenters and joiners in Holywell £375-£575
Plasterboard dry lining in Holywell £638-£978
Wood flooring in Holywell £750-£1,150
Wooden decking in Holywell £1,125-£1,725
Garden shed in Holywell £450-£690
Wooden window repair in Holywell £320-£480

Related Carpenter searches in Holywell

Carpenter FAQs

What does a carpenter do?

Carpenters are involved with numerous diverse kinds of construction, from home improvement to cabinet making, and framing to large construction projects.

Since the start of time, men have utilised hand tools to make things. You need to understand the correct usage of a hand saw, hammer, plane, screwdriver, and other manual tools. These tools are used to attach ready pieces and produce a complete product, such as nails, screws, and dowels (pre-formed fragments of wood that fit into pre-drilled holes), which are then fastened and amassed.

Carpenters must be adept with the safety and proper usage of numerous power tools, including the ones that do the cutting, shaping, and refining of the wood. This permits constituents to take the arrangement desired for a specific project. Some of these tools include large table saws and drills, band saws and sanders. Apart from power tools, there are also tons of power hand tools including saws and hand drills that can help with the smaller details of any project.

Cabinetry and Furniture Making

Being a cabinet fabricator or furniture maker gives you the chance to build purposeful devices for a home. You need to be able to plan cabinets, chairs, tables, and other products, frequently to fit into a provided space. It is up to you to pick the proper material such as wood, metal, or fabric, and then make the decision about the type of stain or paint, and also the necessary hardware needed to attach the cabinets and complete the furniture.

Residential Carpentry

Looking to become a residential carpenter? Your primary work would be on home improvement and other repair projects; indoors and outdoors. Residential carpenters complete setting up projects on wood flooring, outdoor decks, and patios. This job requires you to design your projects and then work on those designs. You also have to be skilful at work with your client base of proprietors, who you have to satisfy both aesthetically and financially, by keeping costs in check.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Holywell.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Holywell?

View our open Carpenter jobs near you

Join today
View Shortlist