Find a Carpenter you can trust in Looe.

Choose from 48 Carpenters, all rated by people like you.

Over 96 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

First Choice

65 review(s)
Offers services in LOOE
A business with customer satisfaction guaranteed, we aim to please with our workmanship, good reliable company. No job to ...
Verified Pro
We are a proud bathroom and heating company. We treat every job as our own and strive for your satisfaction to deliver a...
Verified Pro
We specialise in driveways and roofing. We are based in Exeter and Plymouth all the work is done to a very high standard a...
Verified Pro
Here at first choice drives and patios we offer a wide ranges of finishes and the possibility’s are limitless we aim to im...
Verified Pro

Unifloorwpc

0 review(s)
Offers services in LOOE
Unifloor is a leading supplier of wood-plastic composite products production and supply. High surface hardness, water resi...

Recent Carpenter Enquiries

18 Apr

Garden | Decking

Looe - PL13

Enquiry from: Susan G

Start Date: Immediate

Small decking area approx 6'x4'

Post a similar request >

08 Aug

Windows | Wooden | Repair

Looe - PL13

Enquiry from: Ian G

Start Date: Immediate

Hello there. Wondering if you can help. I have a first floor window (actually in the loft space) - that I'm looking to either get repaired or replaced. I can supply some dims & some photos. Many, many...

Post a similar request >

28 Dec

Kitchen | Fitting

Looe - PL13

Enquiry from: MrRobert T

Start Date: Immediate

REPLACE WORK TOPS AND SINK , REMOVE INTREGATED DISHWASHER AND FIT SHELVES , REMOVE INTREGATED FRIDGE FREEZER MOVE END PANAL ONTO CUPBOARDS,

Post a similar request >

23 May

Kitchen | Fitting

Looe - PL13

Enquiry from: Richard G

Start Date: Immediate

repair to kitchen cabinet door coverings and hinges on washing machine door are you the property owner: owner of the property what level of service do you require: install only do you have all of the...

Post a similar request >

13 Apr

Garden | Decking

Looe - PL13

Enquiry from: Paule R

Start Date: Immediate

remove existing decking and replace with new decking are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appo...

Post a similar request >

17 Jul

Garden | Sheds

Looe - PL13

Enquiry from: Sue C

Start Date: 1 to 3 months

Hi, I am looking for a garden shed/ Summer house, sized about 6' wide by 8' depth. I need a concrete base plus the frame for the shed to sit on, full insulation and electrics. Can you help me, I know...

Post a similar request >

16 Aug

Kitchen | Fitting

Looe - PL13

Enquiry from: Colin A

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 100, Property type: House, Work description: take out old kitchen units and fit new kitchen units (twenty four...

Post a similar request >

28 Dec

Carpentry

Looe - PL13

Enquiry from: TOM S

Start Date: Immediate

simple fitted sliding door wardrobe for alcove space of 210cm wide, 80cms height,50cm deep. Time scale: Immediate

Post a similar request >

12 Apr

Garden | Decking

Torpoint - PL11

Enquiry from: Christine G

Start Date: Immediate

Repair or replace decking

Post a similar request >

07 Apr

Garden | Decking

Saltash - PL12

Enquiry from: Nicola H

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

wooden decking replaced front and back of house 35 beatrice avenue saltash are you the property owner: owner of the property property type: terrace what level of service do you require: supply and dec...

Post a similar request >

13 Mar

Carpentry

Bodmin - PL31

Enquiry from: David M

Start Date: Immediate

just had new boiler ,looking to get it boxed in but still accessible for servicing etc.got a radiator cover that covers the pipes up towards the boiler, just need a box type with door to hide the boil...

Post a similar request >

07 Dec

Kitchen | Fitting

Saltash - PL12

Enquiry from: Hazel F

Start Date: Immediate

2 B&Q kitchen cabinets with pull out tray storage. Plus beech worktop All parts paid for

Post a similar request >

23 Oct

Kitchen | Fitting

Plymouth - PL5

Enquiry from: Mike D

Start Date: Immediate

i need a kitchen worktop around my sink fitted as it has become water damaged. i already have the work top replacement stored, it just needs to be cut to size and fitted and sealed. are you the prope...

Post a similar request >

14 Jun

Windows | Wooden | Repair

Saltash - PL12

Enquiry from: Evelyn B

Start Date: 1 to 3 months

Wooden window repair Lead

several jobs needed- 1) curtain pole put up over patio doors. 2) wooden porch frame and front door restored and door furniture replaced- at the moment some pieces of frame timber need replacing , doo...

Post a similar request >

25 Mar

Carpentry

Torpoint - PL11

Enquiry from: Hannah S

Start Date: Immediate

New stairs or renovation.

Post a similar request >

27 Feb

Windows | Wooden | Repair

St. Austell - PL25

Enquiry from: Kevin M

Start Date: Immediate

i have 5 wooden sash windows of which some have wood rot around the frame and some are stiff and difficult to open due to having been previously painted shut. are you the property owner: owner of the...

Post a similar request >

12 Feb

Carpentry

St. Austell - PL25

Enquiry from: Jackie W

Start Date: 1 to 3 months

storage spaces in wc, bathrooms and tv wall unit. are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: furniture fitting do you requi...

Post a similar request >

06 Feb

Carpentry

Fowey - PL23

Enquiry from: Stuart C

Start Date: Immediate

Oak staircase one winder at the top 700mm wide Going 2700 Rise 2740 Mule posts hand rail and spindles

Post a similar request >

17 Jan

Carpentry

Saltash - PL12

Enquiry from: Mark W

Start Date: Immediate

I want to have my existing stainless steel 25mm round spindles removed and taken away to be painted black And then installed back again?

Post a similar request >

01 Nov

Carpentry

Torpoint - PL11

Enquiry from: Vincent R

Start Date: Immediate

Hi, the bottom step on my staircase appears to have come away from second step/broken and moves when stepping onto it. Am after a quote for repair if possible. Regards

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Looe is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Looe £975-£2,495
Carpenters and joiners in Looe £375-£575
Plasterboard dry lining in Looe £638-£978
Wood flooring in Looe £750-£1,150
Wooden decking in Looe £1,125-£1,725
Garden shed in Looe £450-£690
Wooden window repair in Looe £320-£480

Related Carpenter searches in Looe

Carpenter FAQs

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

What does a carpenter do?

Carpenters are involved with numerous diverse kinds of construction, from home improvement to cabinet making, and framing to large construction projects.

Since the start of time, men have utilised hand tools to make things. You need to understand the correct usage of a hand saw, hammer, plane, screwdriver, and other manual tools. These tools are used to attach ready pieces and produce a complete product, such as nails, screws, and dowels (pre-formed fragments of wood that fit into pre-drilled holes), which are then fastened and amassed.

Carpenters must be adept with the safety and proper usage of numerous power tools, including the ones that do the cutting, shaping, and refining of the wood. This permits constituents to take the arrangement desired for a specific project. Some of these tools include large table saws and drills, band saws and sanders. Apart from power tools, there are also tons of power hand tools including saws and hand drills that can help with the smaller details of any project.

Cabinetry and Furniture Making

Being a cabinet fabricator or furniture maker gives you the chance to build purposeful devices for a home. You need to be able to plan cabinets, chairs, tables, and other products, frequently to fit into a provided space. It is up to you to pick the proper material such as wood, metal, or fabric, and then make the decision about the type of stain or paint, and also the necessary hardware needed to attach the cabinets and complete the furniture.

Residential Carpentry

Looking to become a residential carpenter? Your primary work would be on home improvement and other repair projects; indoors and outdoors. Residential carpenters complete setting up projects on wood flooring, outdoor decks, and patios. This job requires you to design your projects and then work on those designs. You also have to be skilful at work with your client base of proprietors, who you have to satisfy both aesthetically and financially, by keeping costs in check.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Looe.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Looe?

View our open Carpenter jobs near you

Join today
View Shortlist