Find a Carpenter you can trust in Padstow.

Choose from 19 Carpenters, all rated by people like you.

Over 102 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

First Choice

68 review(s)
Offers services in PADSTOW
A business with customer satisfaction guaranteed, we aim to please with our workmanship, good reliable company. No job to ...
Verified Pro
Hiya, we are family run business The business have been established for 15 years we like to take care of all of our custom...
Verified Pro
Here at mid Cornwall block paving service we are a family run business what been running many years we take all of our wor...

Jwh property maintenance

0 review(s)
Offers services in PADSTOW
Hi we cover all aspects of fencing from Minor repairs such as broken post and panels to Total replacement many types of fe...

Holley Home Improvements

3 review(s)
Offers services in PADSTOW
Always happy to help, With over 20 years experience, my ethos is to go above and beyond for my clients. Competitive p...

Recent Carpenter Enquiries

23 Mar

Carpentry

Padstow - PL28

Enquiry from: David B

Start Date: Immediate

We are looking to have two windows replaced and a front door. It this somthing you could do please?

Post a similar request >

04 Nov

Garden | Decking

Padstow - PL28

Enquiry from: Norman B

Start Date: Immediate

replace existing decking with composite material are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to ap...

Post a similar request >

10 Aug

Garden | Sheds

Padstow - PL28

Enquiry from: Margaret C

Start Date: Immediate

Reroof shed Are you the property owner: Owner of the property Property Type: Other

Post a similar request >

04 Aug

Garden | Decking

Wadebridge - PL27

Enquiry from: MOLLIE M

Start Date: Immediate

REMOVE CHIPPINGS AND FIT DECKING

Post a similar request >

14 Apr

Garden | Decking

Newquay - TR7

Enquiry from: Morgan E

Start Date: Immediate

I am looking to replace my current decking, like for like, as it has rotten. The decking is about 6m x 5m and split over two levels, with four steps (I can send you images of the floorplan)

Post a similar request >

13 Mar

Carpentry

Bodmin - PL31

Enquiry from: David M

Start Date: Immediate

just had new boiler ,looking to get it boxed in but still accessible for servicing etc.got a radiator cover that covers the pipes up towards the boiler, just need a box type with door to hide the boil...

Post a similar request >

10 Aug

Flooring | Wooden

Newquay - TR8

Enquiry from: Tony M

Start Date: Immediate

Porch Mandan fitting. Flooring obtained fitter required app*** x 4ft

Post a similar request >

27 Apr

Garden | Decking

Bodmin - PL30

Enquiry from: Kate M

Start Date: Immediate

customer in the bodmin area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prop...

Post a similar request >

21 Oct

Carpentry

Newquay - TR8

Enquiry from: Darren F

Start Date: Immediate

x3 internal doors to be shaved due to new carpet are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how m...

Post a similar request >

12 Oct

Carpentry

Newquay - TR7

Enquiry from: Ashley R

Start Date: 1 to 3 months

block of 9 apartments - 3 floors. fire safety audit report completed. new fire doors/frames/thermostrips/door furniture required. 16 doors. gf main entrance front door, gf fire exit rear door, 3 x...

Post a similar request >

02 Sep

Carpentry

Newquay - TR8

Enquiry from: Zoe M

Start Date: Immediate

replacing a single door & one set of double internal doors are you the property owner: owner of the property property type: detached what type of job are you looking to have done: other how many wind...

Post a similar request >

07 Aug

Kitchen | Fitting

Bodmin - PL30

Enquiry from: Rubin G

Start Date: Immediate

supply and fit kitchen work tops with cut outs for sink and hob

Post a similar request >

15 Mar

Garden | Decking

Newquay - TR7

Enquiry from: Jane B

Start Date: Immediate

OUTDOOR DECKING NEEDED ---- TO BE FITTED ASAP EITHER RESIN OR WOODEN ???

Post a similar request >

14 Feb

Garden | Decking

Newquay - TR7

Enquiry from: Tony B

Start Date: Immediate

repl***ar old wood decking with composite , and removing old decking. 3.3m x2.7 are you the property owner: owner of the property property type: terrace what level of service do you require: supply ...

Post a similar request >

07 Feb

Garden | Decking

Newquay - TR7

Enquiry from: Lucy N

Start Date: Immediate

composite decking already installed a few years ago and requires some remedial work. gaps have appeared between boards and in some places the boards have dropped off their mountings. also the edge sea...

Post a similar request >

28 Jan

Kitchen | Fitting

Wadebridge - PL27

Enquiry from: Katherine M

Start Date: Immediate

hi, we are looking into buying a new kitchen, i have a friend who works for howdens so have been chatting to him about buying one through them, however we need to find someone to fit the kitchen but w...

Post a similar request >

09 Aug

Interior work | Stud Walls

Newquay - TR7

Enquiry from: Kyla H

Start Date: Immediate

looking for a quote to build an indoor stud wall with door. wall length about 12ft, hight ab***. are you the property owner: owner of the property property type: terrace how many different rooms are y...

Post a similar request >

14 Jul

Garden | Sheds

Newquay - TR8

Enquiry from: Andrea B

Start Date: Immediate

conservation mix hedging maintainace, orchard maintanance, veg plot , mowing, digging , weeding, polytunnel are you the property owner: owner garden type: back garden, front garden, side garden work r...

Post a similar request >

08 Jul

Garden | Sheds

Bodmin - PL31

Enquiry from: Brian C

Start Date: Immediate

hedge cutting on a regular basis replacement shed hard landscaping on area between drives are you the property owner: owner of the property do you have a: small garden what level of service are you lo...

Post a similar request >

05 Jul

Garden | Decking

Bodmin - PL30

Enquiry from: Carl H

Start Date: Immediate

just moved inti property garden over grown needs tlc are you the property owner: owner property type: terrace do you have a: large garden garden type: back garden work required: lawn/turfing, decking...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Padstow is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Padstow £975-£2,495
Carpenters and joiners in Padstow £375-£575
Plasterboard dry lining in Padstow £638-£978
Wood flooring in Padstow £750-£1,150
Wooden decking in Padstow £1,125-£1,725
Garden shed in Padstow £450-£690
Wooden window repair in Padstow £320-£480

Related Carpenter searches in Padstow

Carpenter FAQs

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Padstow.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Padstow?

View our open Carpenter jobs near you

Join today
View Shortlist