Wooden Window Repair
Penzance - TR20
Enquiry from: Lizzie N
Start Date: Immediate
Repairs to 3 x 1st floor wooden windows, approx. 113cm x 88cm. Probably from 1980s 0r 90s although property much older. Accessible from conservatory roof
Over 80 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Penzance - TR20
Enquiry from: Lizzie N
Start Date: Immediate
Repairs to 3 x 1st floor wooden windows, approx. 113cm x 88cm. Probably from 1980s 0r 90s although property much older. Accessible from conservatory roof
Camborne - TR14
Enquiry from: Mary T
Start Date: Immediate
Clean existing wooden decking and remove existing balustrade and fit new one
Penzance - TR18
Enquiry from: Eve J
Start Date: Immediate
Decking and lights for outside area ....xx xx... installation
Helston - TR13
Enquiry from: Tomasi M
Start Date: Immediate
5 metres x 3 metres patio decking
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in St Ives | £975-£2,495 |
| Carpenters and joiners in St Ives | £375-£575 |
| Plasterboard dry lining in St Ives | £638-£978 |
| Wood flooring in St Ives | £750-£1,150 |
| Wooden decking in St Ives | £1,125-£1,725 |
| Garden shed in St Ives | £450-£690 |
| Wooden window repair in St Ives | £320-£480 |
How To Dot And Dab A Plasterboard
If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!
• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.
• Ensure the wall’s height is 15mm more than the plasterboard
• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.
• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.
• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.
• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.
• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
To install onto plywood, you can follow this guide:
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.
Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.
A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.
As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.
It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.
It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in St Ives.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today