Find a Carpenter you can trust in Chester Le Street.

Choose from 59 Carpenters, all rated by people like you.

Over 61 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in CHESTER LE STREET
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Walkers fencing contractors

0 review(s)
Offers services in CHESTER LE STREET
Fencing contractor Commercial and domestic
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in CHESTER LE STREET
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in CHESTER LE STREET
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...

Recent Carpenter Enquiries

20 Jun

Garden | Sheds

Chester le Street - DH2

Enquiry from: Pauline O

Start Date: Immediate

remove old 6 x 4 apex wood shed. i have a concrete base, gardens on slope, have water issues. i would like/need a raised base, looking at plastic, with membrane underneath and filled with gravel (have...

Post a similar request >

18 Apr

Garden | Sheds

Chester le Street - DH3

Enquiry from: John B

Start Date: Immediate

1 shed supplied & erected.

Post a similar request >

20 Apr

Garden | Decking

Chester le Street - DH3

Enquiry from: Sandra H

Start Date: Immediate

new layout of my garden , to include, summer house, fire pit, possibly hot tub, but to fit in with a cottage style house. are you the property owner: owner of the property property type: semi detached...

Post a similar request >

20 Aug

Garden | Decking

Chester le Street - DH3

Enquiry from: Dave K

Start Date: Immediate

composite decking area in garden appx 3x 4 metres with sides are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck ple...

Post a similar request >

16 Apr

Garden | Decking

Chester le Street - DH2

Enquiry from: Christine T

Start Date: Immediate

customer in the chester le street area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are y...

Post a similar request >

08 Aug

Carpentry

Chester le Street - DH2

Enquiry from: Shirley K

Start Date: Less than one month

three internal doors, two living room and a cupboard time scale: immediate time scale: less than one month please call to appoint

Post a similar request >

16 Jun

Garden | Decking

Chester le Street - DH2

Enquiry from: Mj F

Start Date: Immediate

are you the property owner: tenant (with permission) property type: semi detached other forms: garden maintenance, wooden decking agreed to receive quotes for selected products: yes please call to ap...

Post a similar request >

23 Apr

Kitchen | Fitting

Chester le Street - DH3

Enquiry from: Carole R

Start Date: Immediate

Homeowner Please contact to appoint

Post a similar request >

10 Apr

Kitchen | Fitting

Chester le Street - DH3

Enquiry from: Carole R

Start Date: Immediate

Homeowner Please contact to appoint

Post a similar request >

28 Oct

Garden | Decking

Chester le Street - DH2

Enquiry from: Diane A

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Semi detached Other Forms: 92 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

19 Oct

Flooring | Wooden

Chester le Street - DH3

Enquiry from: Kevin R

Start Date: 1 to 3 months

Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

31 May

Kitchen | Fitting

Chester le Street - DH3

Enquiry from: Paul B

Start Date: Immediate

kitchen 8 units fitted tiling wall and floor

Post a similar request >

22 Jan

Kitchen | Fitting

Chester le Street - DH2

Enquiry from: Carol F

Start Date: Less than one month

Two double wall cabinets with top n bottom trim Work bench and one floor Cabinet fitted Are you the property owner: Owner of the property What level of service do you require: Install Only Do you h...

Post a similar request >

27 Jul

Garden | Decking

Chester le Street - DH2

Enquiry from: Kathleen M

Start Date: Immediate

replacement of decking and garden works

Post a similar request >

15 Jan

Kitchen | Fitting

Chester le Street - DH3

Enquiry from: W

Start Date: Immediate

Hello, My washing machine exploded before Christmas and damaged the kitchen counter. I would like a quote for a replacement surface. I will give the quote to my insurance company. Although it ma...

Post a similar request >

14 Sep

Kitchen | Fitting

Chester le Street - DH2

Enquiry from: Lyn Y

Start Date: Immediate

Install ready built cabinets to a predefined plan. 4 tall cabinets & approx. 11 cabinets (mixed wall & floor) Gas hob, sink, dishwasher electric cooker & Worksop.Floating breakfast bar. In addition ...

Post a similar request >

13 Mar

Kitchen | Fitting

Chester le Street - DH3

Enquiry from: Ian A

Start Date: Immediate

Home Owner Kitchen Area: 108, Property type: House, Work description: fit replacement kichen doors,worktops and splashback Please Contact to Appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Chester Le Street is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Chester Le Street £975-£2,495
Carpenters and joiners in Chester Le Street £375-£575
Plasterboard dry lining in Chester Le Street £638-£978
Wood flooring in Chester Le Street £750-£1,150
Wooden decking in Chester Le Street £1,125-£1,725
Garden shed in Chester Le Street £450-£690
Wooden window repair in Chester Le Street £320-£480

Related Carpenter searches in Chester Le Street

Carpenter FAQs

How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

Where can I buy kitchen cabinets?

When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!

  • IKEA. One of the best place to buy affordable home goods is also a great place to check if you want to buy your kitchen cabinets. According to a research carried out by J.D Power which surveyed over 1500 customers within the past one year, IKEA’s cabinet system ( Sektion) ranked the highest in terms of the overall satisfaction.
  • KraftMaid. Another winner of the survey conducted by J.D Power as it took the second position when it comes to the overall satisfaction. Therefore, this store happens to be a good option based on the reviews. This store provides you with a wide variety of colour options to select from, so regardless of what your personal preference is, you’re guaranteed to find something worthwhile to install in your kitchen.
  • Stoffer Home. When you buy your kitchen cabinet from an interior designer, there’s a better chance for suitability. Stoffer home offers top quality cabinets which can be manufactured in four various wood finishes and twelve varying paint colours which are all carefully curated.
What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Chester Le Street.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Chester Le Street?

View our open Carpenter jobs near you

Join today
View Shortlist