Find a Carpenter you can trust in Cockermouth.

Choose from 12 Carpenters, all rated by people like you.

Over 49 reviews & an average rating of 4.8/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Abacus Restoration

38 review(s)
Offers services in COCKERMOUTH
With over 25 years of experience, Abacus Restoration specialises in the repair, restoration and ongoing maintenance of uPV...
Verified Pro

C&L Surfacing

0 review(s)
Offers services in COCKERMOUTH
Here at C&L Surfacing We use only the highest quality resin bound products – backed by up to a 25-year manufacturer warr...

Fixrot.co.uk

0 review(s)
Offers services in COCKERMOUTH
Dumfries & Galloway’s Leading Damp Proofing & Wood Rot Specialist We offer up to 30 years Guarantee We also carry out...

Eden Valley Landscapes

0 review(s)
Offers services in COCKERMOUTH
Hi my name is Douglas. Eden valley landscapes is a tree & Garden service that offers a wide range of services which includ...

Recent Carpenter Enquiries

10 May

Garden | Decking

Cockermouth - CA13

Enquiry from: Laura M

Start Date: Immediate

Quote for decking and fencing

Post a similar request >

14 Mar

Carpentry

Cockermouth - CA13

Enquiry from: Richard P

Start Date: Immediate

Partition wall with a double door in it

Post a similar request >

06 Feb

Carpentry

Cockermouth - CA13

Enquiry from: Andrew N

Start Date: Immediate

This is a bungalow with an aluminium loft ladder from the hall and which is probably 50/60 years old and becoming unsafe. I have a complete replacement wooden Fakro ladder which is virtually new to fi...

Post a similar request >

16 May

Garden | Sheds

Cockermouth - CA13

Enquiry from: Claire R

Start Date: Less than one month

8 x 12 shed with double doors and 4 windows. Pent or Apex roof

Post a similar request >

08 May

Flooring | Wooden

Cockermouth - CA13

Enquiry from: Dr. R

Start Date: Immediate

Hi, I am buying the above mentioned property very soon. Before moving I want to make some changes regarding flooring for few rooms and lounge. For that I need competitive quotes. The description as be...

Post a similar request >

26 May

Windows | Wooden | Repair

Whitehaven - CA28

Enquiry from: Peter C

Start Date: Immediate

replace a wooden window sill.

Post a similar request >

03 May

Windows | Wooden | Repair

Whitehaven - CA28

Enquiry from: Peter C

Start Date: Immediate

replace a wooden window sill.

Post a similar request >

26 Apr

Windows | Wooden | Repair

Whitehaven - CA28

Enquiry from: Peter C

Start Date: Immediate

replace a wooden window sill.

Post a similar request >

14 Dec

Garden | Decking

Whitehaven - CA28

Enquiry from: Anna P

Start Date: Immediate

Decking removed, please WhatsApp us.

Post a similar request >

07 Nov

Carpentry

Carlisle - CA5

Enquiry from: Stephen A

Start Date: Less than one month

i need a new small garden fence either repaired or replacing. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other do yo...

Post a similar request >

13 Jul

Carpentry

Whitehaven - CA28

Enquiry from: Martin C

Start Date: Immediate

I have two pieces of oak planks which I would like made into a single coffee table (would just like them joined together, I would attach hairpin legs myself). The oak planks have a live edge. Each pla...

Post a similar request >

19 Jun

Carpentry

Egremont - CA22

Enquiry from: Melville C

Start Date: 1 to 3 months

Wooden window repair Lead

to supply and fit a replacement wooden side door. the existing door is 760 x1970mm approx. and opens externally on to a storage cupboard. are you the property owner: owner of the property property t...

Post a similar request >

06 Jun

Carpentry

Maryport - CA15

Enquiry from: Zoe T

Start Date: Immediate

Discuss a loft conversion for the property

Post a similar request >

29 May

Carpentry

Wigton, Carlisle - CA7

Enquiry from: Jacqui S

Start Date: Immediate

Wooden window repair Lead

Would like a media wall built asap

Post a similar request >

07 May

Carpentry

Egremont - CA22

Enquiry from: Lucy B

Start Date: Less than one month

Wooden window repair Lead Wooden window repair Lead

i would like some shelves to be built into an alcove on the top half, with a desk at the bottom. are you the property owner: owner of the property property type: terrace what type of job are you looki...

Post a similar request >

02 May

Carpentry

Frizington - CA26

Enquiry from: MARK S

Start Date: Immediate

3 stud partion walls for a upstairs ensuite room.

Post a similar request >

22 Mar

Carpentry

Whitehaven - CA28

Enquiry from: Hannah M

Start Date: Immediate

Hello. Can i have a quote for 2 gates please. One for my front garden and one for the side of the house. Thank you :)

Post a similar request >

19 Feb

Carpentry

Workington - CA14

Enquiry from: Jamie T

Start Date: Immediate

I'm looking to get some bespoke shelves installed in a large under stairs cupboard that is accessed from our kitchen. I have a photo of what we are looking for and can provide it. Jamie Titchener

Post a similar request >

15 Feb

Carpentry

Whitehaven - CA28

Enquiry from: Matthew G

Start Date: Immediate

Hello I have a job that needs doing in our kitchen. Can you come around and have a look? Thank you

Post a similar request >

12 Feb

Carpentry

Egremont - CA22

Enquiry from: Catherine W

Start Date: 1 to 3 months

banister requires new spindles and staining. skirting boards/architraves need attaching and staining. further jobs required but there is no rush. thankyou. are you the property owner: owner of the pro...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Cockermouth is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Cockermouth £975-£2,495
Carpenters and joiners in Cockermouth £375-£575
Plasterboard dry lining in Cockermouth £638-£978
Wood flooring in Cockermouth £750-£1,150
Wooden decking in Cockermouth £1,125-£1,725
Garden shed in Cockermouth £450-£690
Wooden window repair in Cockermouth £320-£480

Related Carpenter searches in Cockermouth

Carpenter FAQs

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How much does it cost to hang a door?

Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.

• Door & Frame Installation Job and the average Cost in £'s

• uPVC door installation including glazing & architrave costs around £90 per door

• uPVC french & patio door sets including glazing & architrave costs around £120 per pair

• Softwood french & patio door sets including architrave costs around £180 per door

• Hardwood french & patio door sets including architrave would cost around £250 per pair

• Softwood internal door hanging only would be around £40 per door

• Hardwood internal door hanging only would set you back around £48 per door

• Softwood external door hanging only is around £60 per door

• Hardwood external door hanging would cost around £70 per door

• Locks, letterboxes & door furniture timber doors are around £15 per Item

• Glazing £15 per pane

• Brick cut-outs single doors is around £60 per cut-out

• French or patio door brick cut-outs will be around £90 per cut-out

• New lintels will cost around £150 per lintel

Door Repair Costs and Charges

Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.

Average Cost of Door Repair Job

Replacement glazing units for uPVC doors will be around £15 per unit

Replacement glazing units for timber doors is around £20 per unit

Replacement door glass pined & putty will cost£30 per pane

Replacement handles are around £10 each and general repair work will cost you £25 per hour

Building & FENSA certificate charges

FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.

Average Cost of Window Repair Job: One to two doors will cost around £85

Average Cost of Door Fixtures & Fittings Removal Job

Removing internal doors will cost around £10

Removing internal door liners will cost around £15

Removing external timber doors will cost about £10

Removing External timber door frame will be around £20

Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Cockermouth.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Cockermouth?

View our open Carpenter jobs near you

Join today
View Shortlist