Carpentry
Crediton - EX17
Enquiry from: Ed F
Start Date: Immediate
Replace bannister at top of stairs
Over 102 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Crediton - EX17
Enquiry from: Ed F
Start Date: Immediate
Replace bannister at top of stairs
Brixham - TQ5
Enquiry from: Nik L
Start Date: Immediate
We have an existing garage conversion to an office which was done approx 5 years ago. Part of the room is a diagonal void behind which the gas meter used to sit. We now have a heat pump and the gas ...
Exeter - EX4
Enquiry from: Witold T
Start Date: Immediate
enlarging existing shed base. existing base is made of 60x60cm slabs arranged in 2 x 3 rectangle. i need it to make it larger: 4x4 or 2.40m x 2.40m. are you the property owner: owner of the property d...
Plymouth - PL9
Enquiry from: Julie H
Start Date: Immediate
A frame built around a wood burner to put up electric wall fire
Brixham - TQ5
Enquiry from: David B
Start Date: Immediate
complete replacement of decking at back of house
Dartmouth - TQ6
Enquiry from: Hugh D
Start Date: Immediate
Replace existing wooden decking and steps with new composite decking and glass balustrade
Plymouth - PL6
Enquiry from: Judith B
Start Date: Immediate
Oak flooring in lounge diner + remodelling of stair case in possible oak with glass panelling
Buckfastleigh - TQ11
Enquiry from: Maria C
Start Date: Immediate
Decking needs replacing in an area approx 3m x5m
Exeter - EX4
Enquiry from: Barry B
Start Date: Immediate
Hi I need a quote to replace a small garden shed. Supply and install new shed, take the old shed away
Bideford - EX39
Enquiry from: David Y
Start Date: Immediate
Replace wooden decking with composite decking . Area approx 32 sq m
Axminster - EX13
Enquiry from: Victoria D
Start Date: Immediate
need a shed installed 8x8 are you the property owner: tenant (with permission) what level of service are you looking for: install do you have a: medium size garden please call to appoint
Torquay - TQ1
Enquiry from: Brian R
Start Date: Immediate
Replacement kitchen with appliances, buy to ket property
Dartmouth - TQ6
Enquiry from: Peter H
Start Date: Immediate
Not a huge area, however, the existing decking is rotten to the point of being dangerous and needs completely renewing as you will see.
Newton Abbot - TQ12
Enquiry from: Lesley L
Start Date: Immediate
replace stone patio with composite decking. 40 square metres no ballastrade are you the property owner: owner of the property property type: semi detached what level of service do you require: supply ...
Holsworthy - EX22
Enquiry from: Jane R
Start Date: Immediate
raised decking along the front of my bungalow app*** *** high with a rail and steps are you the property owner: owner of the property property type: semi detached what level of service do you require:...
Dawlish - EX7
Enquiry from: Stephen A
Start Date: Immediate
fitting units and changing doors to upgrade our kitchen are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials ...
North Tawton, Okehampton - EX20
Enquiry from: William H
Start Date: Immediate
Garden shed fitted, wood large door
Plymouth - PL5
Enquiry from: Mike D
Start Date: Immediate
i need a kitchen worktop around my sink fitted as it has become water damaged. i already have the work top replacement stored, it just needs to be cut to size and fitted and sealed. are you the prope...
Exmouth - EX8
Enquiry from: Ian B
Start Date: Immediate
5ft x 11ft Apex, wooden shed, single door. Quote with single or NO windows. Removal of old, level/create/install base
Totnes - TQ9
Enquiry from: Sophia D
Start Date: Immediate
Decking, weed control, landscaping, fencing.
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Devon | £975-£2,495 |
| Carpenters and joiners in Devon | £375-£575 |
| Plasterboard dry lining in Devon | £638-£978 |
| Wood flooring in Devon | £750-£1,150 |
| Wooden decking in Devon | £1,125-£1,725 |
| Garden shed in Devon | £475-£1,595 |
| Wooden window repair in Devon | £320-£480 |
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.
Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
• Incorporate flexible wood on concrete adhesives.
• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
• Put 10mm spacers against the wall to see to the consistency in expansion gaps.
• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
• Make use of a porta-nailer.
• Position 10mm spacers against the wall - parallel with the installation direction.
• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Devon.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today