Find a Carpenter you can trust in Sherborne.

Choose from 86 Carpenters, all rated by people like you.

Over 88 reviews & an average rating of 3.9/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

JDLOD DRIVEWAYS

0 review(s)
Offers services in SHERBORNE
With over 25 years experience and very competitive prices, we can make the best of your project. Free estimates, free desi...
Verified Pro

Expert Home Improvements

0 review(s)
Offers services in SHERBORNE
We specialise in driveways and roofing. We are based in Exeter and Plymouth all the work is done to a very high standard a...
Verified Pro

CHS Landscapes

0 review(s)
Offers services in SHERBORNE
CHS Landscapes cover Dorset, Wiltshire and Hampshire and provide professional landscaping services to both domestic and co...
Verified Pro
Friendly and local business that’s ready to help anyone and for fill your gardens needs !
Verified Pro

Sp flooring

0 review(s)
Offers services in SHERBORNE
We are a family run business with over 20 years experience in fitting carpets,wood,laminate,lvt and sheet vinyl. We also c...

Recent Carpenter Enquiries

31 Aug

Carpentry

Sherborne - DT9

Enquiry from: James E

Start Date: Immediate

New staircase to replace a temporary one built due to a second floor conversion in a bungalow

Post a similar request >

09 May

Kitchen | Fitting

Sherborne - DT9

Enquiry from: Dave H

Start Date: Immediate

Insurance quote to replace sink unit plus adjacent units, laminate flooring and maybe more dependent on quote Are you the property owner: Owner of the property What level of service do you require: In...

Post a similar request >

03 May

Carpentry

Sherborne - DT9

Enquiry from: Ms P

Start Date: Immediate

Sitting room two draw cupboard Please call to appoint

Post a similar request >

12 Jul

Carpentry

Dorchester - DT2

Enquiry from: Sean N

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

We had a burst pipe in April. We are looking for a carpenter to help us replace our pharmacy furniture/skirtings that have been damaged by water.

Post a similar request >

29 Jun

Carpentry

Sturminster Newton - DT10

Enquiry from: Kathryn Q

Start Date: Immediate

Screed and Kardean lvt flooring (already purchased) installed in kitchen, diner, hallway and downstairs toilet.

Post a similar request >

27 Jun

Carpentry

Martock - TA12

Enquiry from: Mandy D

Start Date: Immediate

Hello do you do wall panelling? I have a bedroom wall I would like panelled. If you do, would you be able to give me a price. I can supply the measurements of the wall and pictures of the style I pr...

Post a similar request >

28 May

Carpentry

Dorchester - DT2

Enquiry from: Bob G

Start Date: Immediate

A door to be fitted into a frame, the door is not the original door to the frame so I know it will not be perfect but it is in keeping with the other doors in the house

Post a similar request >

11 Apr

Carpentry

Martock - TA12

Enquiry from: Rebecca P

Start Date: Immediate

Skirting boards in downstairs toilet, hall and part of kitchen

Post a similar request >

09 Apr

Carpentry

Dorchester - DT2

Enquiry from: Sophie W

Start Date: Immediate

A garage door and frame fitted, this is a hinged door.

Post a similar request >

12 Mar

Carpentry

Dorchester - DT2

Enquiry from: Norman T

Start Date: Immediate

hi, i need my worktops fitted in my kitchen. the units are in and levelled

Post a similar request >

19 Feb

Carpentry

Sturminster Newton - DT10

Enquiry from: Marie H

Start Date: Immediate

I don't know if it's a service you provide, but I'm desperate for someone to fix a creaky staircase and some upstairs floorboards too. Many thanks

Post a similar request >

15 Jan

Carpentry

Beaminster - DT8

Enquiry from: Adrian B

Start Date: Immediate

i need half height paneling installed in the main living room and the back bedroom. the cottage is currently empty and can be accessed using the key safe by the front door. there is paneling in the ma...

Post a similar request >

08 Jan

Carpentry

Dorchester - DT2

Enquiry from: Sally M

Start Date: Immediate

exterior softwood glazed stable door 77cms x 191cms shelving cupboards

Post a similar request >

20 Dec

Carpentry

Dorchester - DT2

Enquiry from: Ana R

Start Date: Immediate

A quote for replacing a door, window sill, lintel and other general carpentry needs. Thank you.

Post a similar request >

08 Nov

Carpentry

Dorchester - DT2

Enquiry from: Grace D

Start Date: Immediate

Looking for a quote to have a solid wood worktop fitted in our kitchen

Post a similar request >

15 Oct

Carpentry

Beaminster - DT8

Enquiry from: Gemma W

Start Date: Immediate

Window rehanging - window is difficult to close (doesn’t quite fit in frame). House is a new build and other windows have had to be rehung due to slight movement of the frame with time).

Post a similar request >

13 Oct

Carpentry

Templecombe - BA8

Enquiry from: Laura B

Start Date: Immediate

Hi there, I would like to enquire about having some fitted wardrobes built.

Post a similar request >

21 Aug

Carpentry

Yeovil - BA21

Enquiry from: Emma M

Start Date: Immediate

Hi I'm looking to have a specific style console table made so it can pass my radiator on the wall and wondered if you made bespoke orders at all for an oak console table? (I can send photos of what I'...

Post a similar request >

16 Jun

Carpentry

Yeovil - BA21

Enquiry from: Rami C

Start Date: 1 to 3 months

grp exterior door souround frame needed. top width appox. 60 cm , pillar hight 230 cm and 100cm distance distance between two pillars are you the property owner: owner of the property property type...

Post a similar request >

23 Sep

Garden | Sheds

Dorchester - DT2

Enquiry from: Maureen H

Start Date: Immediate

removal of old 4'x6' shed and replacement by 4'x6' either wooden or metal shed with no windows are you the property owner: tenant (with permission) do you have a: small garden what level of service a...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Sherborne is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Sherborne £975-£2,495
Carpenters and joiners in Sherborne £375-£575
Plasterboard dry lining in Sherborne £638-£978
Wood flooring in Sherborne £750-£1,150
Wooden decking in Sherborne £1,125-£1,725
Garden shed in Sherborne £450-£690
Wooden window repair in Sherborne £320-£480

Related Carpenter searches in Sherborne

Carpenter FAQs

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Sherborne.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Sherborne?

View our open Carpenter jobs near you

Join today
View Shortlist