Carpentry
Alexandria, Arrochar - G83
Enquiry from: William M
Start Date: Immediate
6 x oak panel doors to be fitted
Over 159 reviews & an average rating of 4.7/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Alexandria, Arrochar - G83
Enquiry from: William M
Start Date: Immediate
6 x oak panel doors to be fitted
Alexandria, Arrochar - G83
Enquiry from: Jean B
Start Date: Immediate
i am looking for someone to lay and supply slabs for a base for a garden shed. 6x4 are you the property owner: owner of the property what level of service are you looking for: supply, install do you h...
Alexandria, Arrochar - G83
Enquiry from: David B
Start Date: Immediate
Cupboard door under the stairs
Alexandria, Arrochar - G83
Enquiry from: David B
Start Date: Less than one month
Under staircase cupboard with door to be made.
Alexandria, Arrochar - G83
Enquiry from: Lesley H
Start Date: Immediate
Need a quote for decking to be supplied and fitted in my back garden
Alexandria, Arrochar - G83
Enquiry from: Margaret M
Start Date: Immediate
Supply and build good quality gatden shed 8 x 6. remove old shed.
Alexandria, Arrochar - G83
Enquiry from: David H
Start Date: Immediate
Property type: House, Property owner: Tenant with permission, Panel number: 5+, Work description: 4ft fence enclosing grass, with a 5ft fence across the back part up to 14 panels Are you the pro...
Johnstone - PA6
Enquiry from: Tom M
Start Date: Immediate
I require a section of roofing to be boxed in, to prevent birds nesting. The area is above our garage and is a triangular space above the eaves
Paisley - PA3
Enquiry from: Isobel K
Start Date: Immediate
to fix a shelve buy and fit new door and dismantle old door and put a small lock on an inside door
Glasgow - G52
Enquiry from: Johann M
Start Date: Immediate
kitchen window latch needs replacing. window will not stay open without inserting a wedge. thanks
Johnstone - PA5
Enquiry from: Pamela B
Start Date: Immediate
Slabbing laid. 2 areas powerwashed. Bin shed erected.
Renfrew - PA4
Enquiry from: Aravind R
Start Date: Immediate
Looking to uproot the garden and level it to put a shed on the back garden. On the front garden, looking to remove grass and put gravel.
Johnstone - PA5
Enquiry from: Ryan H
Start Date: Immediate
grass cut in a small area beside bin shed can send pictures of needed are you the property owner: tenant (with permission) do you have a: small garden what level of service are you looking for: suppl...
Johnstone - PA6
Enquiry from: Rachel L
Start Date: Immediate
new bathroom new kitchen new flooring plastering painting
Paisley - PA1
Enquiry from: Diane G
Start Date: Immediate
Make cupboard accessible to boiler
Paisley - PA3
Enquiry from: Carol A
Start Date: Immediate
i was wondering if could get quote regarding my backdoor think it need turf and little bit at side too to evel up whole green. do you have a: unsure property type: other are you the property owner: ...
Paisley - PA1
Enquiry from: Tom C
Start Date: Immediate
decking replaced with coposite decking. grass replaced with astro grass at back and front. replace stoned area with stones are you the property owner: owner property type: semi detached do you have a:...
Glasgow - G52
Enquiry from: Charles M
Start Date: Immediate
mr requested quotes for wooden decking from a landscaper around glasgow. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below i...
Lochwinnoch - PA12
Enquiry from: Linda P
Start Date: Immediate
Prices for shed purchase and installation
Glasgow - G52
Enquiry from: Tracy M
Start Date: Immediate
customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: semi detached work description: i need the broken bits of decking fixed, all garden cleaned and de-weeded, a...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Arrochar | £975-£2,495 |
| Carpenters and joiners in Arrochar | £375-£575 |
| Plasterboard dry lining in Arrochar | £638-£978 |
| Wood flooring in Arrochar | £750-£1,150 |
| Wooden decking in Arrochar | £1,125-£1,725 |
| Garden shed in Arrochar | £450-£690 |
| Wooden window repair in Arrochar | £320-£480 |
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
How Much Plasterboard Do I Need?
Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!
lTake Square Footage Measurement
• Measure the square footage of the area where the plasterboard will be fitted.
• Multiply the height by the width of each wall or ceiling area.
• Add all quantities to obtain a total square-foot amount.
lCalculate Drywall Sheets
• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.
• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).
• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.
We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Arrochar.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today