Find a Carpenter you can trust in Lampeter.

Choose from 63 Carpenters, all rated by people like you.

Over 10 reviews & an average rating of 4.1/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
Serving the local area we take pride in our work . And our reputation have been build on loyalty to our customers over ...
Verified Pro
I'm Amos Dixon and I am very proud to say that I run this business 'Acorn roofing & landscaping specialist. We have ove...
Verified Pro

The Grass Master

0 review(s)
Offers services in LAMPETER
Established in 2006 The Grass Master Ltd has completed hundreds of landscaping projects across Kent. We cover Artificial L...
Verified Pro

Owner

0 review(s)
Offers services in LAMPETER
At R AND S FECING we provide an excellent service and quality of work we are fully insured and all our materials are from...
Verified Pro

Johns gardening services

0 review(s)
Offers services in LAMPETER
Johns gardening landscaping and maintenance services We are company based in Llandeilo with 4 full time staff and three ...

Recent Carpenter Enquiries

05 Nov

Garden | Sheds

Lampeter - SA48

Enquiry from: Carole L

Start Date: Immediate

i am looking for a half and half greenhouse/shed, i would want a 1800mm x 2000mm shed adjoined to a wooden frame green house 1800mm x 2000m are you the property owner: owner of the property what level...

Post a similar request >

23 May

Windows | Wooden | Repair

Aberaeron - SA46

Enquiry from: Hazel P

Start Date: Immediate

replace cill of kitchen window, sash replacement

Post a similar request >

02 Mar

Garden | Decking

Pencader - SA39

Enquiry from: Francis E

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you the property...

Post a similar request >

29 Jul

Kitchen | Fitting

Ystrad Meurig, Tregaron - SY25

Enquiry from: Michele C

Start Date: Immediate

miss requested quotes for kitchen design & installation from a kitchen installer around ystrad meurig, tregaron. they are considering a couple of projects at the moment.call anytime to arrange appoint...

Post a similar request >

28 Jul

Garden | Sheds

Llandysul - SA44

Enquiry from: Geoff S

Start Date: Immediate

summerhouse with shed and open verandah 5.5mx3m x2.5 h with pent roof shed on right verandah on left are you the property owner: owner of the property do you have a: large garden what level of servic...

Post a similar request >

03 Aug

Carpentry

Llanwrda - SA19

Enquiry from: Anne A

Start Date: Immediate

To hang 5 new internal doors with latches Time scale: Immediate Please call to appoint

Post a similar request >

21 Apr

Garden | Decking

Llandysul - SA44

Enquiry from: Martin W

Start Date: Immediate

Pine decking boards 20x3.6mx28mmx145mm Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Supply only Time scale: Immediate Please call ...

Post a similar request >

24 Sep

Kitchen | Fitting

Llanybydder - SA40

Enquiry from: Kevin H

Start Date: Less than one month

I have 3 lengths of B&Q Exilis solid laminate worktops to be installed requiring 2 joins and 2 cut outs for hob and sink, please could you give me a quote. Many thanks,

Post a similar request >

07 Jun

Garden | Sheds

Ystrad Meurig, Tregaron - SY25

Enquiry from: Allan C

Start Date: Immediate

8ft x 8ft pitched roof shed with one 3ft wide door one window, complete with floor, delivered ,ship lap boarding. Extra for erection.

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Lampeter is:

£943

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Lampeter £975-£2,495
Carpenters and joiners in Lampeter £375-£575
Plasterboard dry lining in Lampeter £638-£978
Wood flooring in Lampeter £750-£1,150
Wooden decking in Lampeter £1,125-£1,725
Garden shed in Lampeter £475-£1,595
Wooden window repair in Lampeter £320-£480

Related Carpenter searches in Lampeter

Carpenter FAQs

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How much does a stair banister cost?

The flight of steps in your multi-storey household doesn’t have to be purely efficient. With just a little thought given to banister design, the boring flight of stairs can turn into something you would like to show to people and be proud of. Replacement of your banister can even enhance the worth of your property, giving the entry an outstanding presence. But how much will new banisters and spindles cost you?

If you are considering starting with this project, having a help from a professional is always advised.

New banister cost

Banisters are also known as handrails. They are reinforced by balustrades or spindles – a row of pillars that improve the security of the stairway and donate in the direction of the overall look and feel. Banisters and spindles may appear dull due to use over time. A fresh coat of polish might help your staircase get a new facelift.

The cost of new banisters and spindles will fluctuate solely reliant on the material. The price for a new banister starts around £40 for softwood and can reach £120 for a metal one.

Spindle prices are also a contributing factor in determining the cost with prices in the range of £30 to £150 per meter based on the materials used.

How much does a new staircase banister cost?

Hiring a professional is very important when trying to properly install a new banister since they are familiar with the process and work as per safety compliance. Fitting your new banister can be easily taken care by a general builder as well as a carpenter.

Below is a table depicting the average costs of different types of bannisters and spindles:

White oak bannister is around £105 and spindles are around £13.50.

Pine bannister is around £35 and spindles are around £7.

Primed wood bannister costs around £31 and spindles costing around £18.

Metal bannister is around £110 with the spindles being around £6.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Lampeter.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Lampeter?

View our open Carpenter jobs near you

Join today
View Shortlist