Kitchen | Fitting
Narberth - SA67
Enquiry from: Maj C
Start Date: Immediate
an ex display kitchen fitted
-->
Over 10 reviews & an average rating of 4.1/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Narberth - SA67
Enquiry from: Maj C
Start Date: Immediate
an ex display kitchen fitted
Narberth - SA67
Enquiry from: Anthony R
Start Date: Immediate
3 large rooms and ceilings dry lined and then skimmed. also some outdoor window sill repairs. by end of october. are you the property owner: owner of the property property type: detached how many dif...
Narberth - SA67
Enquiry from: Day M
Start Date: 1 to 3 months
Property owner Kitchen fitter Please call to appoint
Narberth - SA67
Enquiry from: Day M
Start Date: 1 to 3 months
Initial upgrade and refit of utility room, leading to separate fitting of new wooden kitchen Are you the property owner: Owner of the property What level of service do you require: Install Only Do you...
Pembroke Dock - SA72
Enquiry from: Sheila D
Start Date: Less than one month
wooden frame and wooden back gate fitted. are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: other do you require a door(s): none ...
Tenby - SA70
Enquiry from: Sarah P
Start Date: Immediate
Need a large patch digging out where a shed used to be and it's gone wild, lots of bamboo and weeds. I'd like to make the whole garden more low maintenance but need help with design!
Pembroke - SA71
Enquiry from: Eleri M
Start Date: Immediate
Hi, I'd like to request a quote for the landscaping of my garden please. It's currently very much a blank canvas as was a new build home. The kind of work I'd be looking for is a shed/pergola (whi...
Tenby - SA70
Enquiry from: Charlotte R
Start Date: Immediate
Built in bedroom cupboards and wooden flooring downstairs in 2 rooms.
Milford Haven - SA73
Enquiry from: Mark J
Start Date: Immediate
Hi i am a landlord of the above property, i require 2 external doors and 4 internal fire doors fitted to one of the flats plus a kitchine worktop. i would like to use a local company and hope you can ...
Pembroke Dock - SA72
Enquiry from: Helen F
Start Date: Immediate
re felting shed roof size 10' 8' are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: install please call to appoint
Haverfordwest - SA62
Enquiry from: Sandra S
Start Date: Immediate
customer in the haverfordwest area made an enquiry a couple of projects including garden shed.call anytime and arrange an appointment to discuss. below is some details about this project: are you the ...
Tenby - SA70
Enquiry from: Morgan D
Start Date: Immediate
new kitchen.. all parts and labour.
Pembroke Dock - SA72
Enquiry from: Carol K
Start Date: 1 to 3 months
floor boards replaced in some areas Time scale: 1-3 months Please call to appoint Time scale: 1-3 months Please call to appoint Time scale: 1-3 months Please call to appoint
Pembroke - SA71
Enquiry from: Paul R
Start Date: Immediate
14 x 10 garden shed, solid, door on long side Are you the property owner: Owner of the property What level of service are you looking for: Supply
Whitland - SA34
Enquiry from: Nick O
Start Date: Immediate
Small area of decking sized, Width 10 feet Depth 6 feet Slope about 4 inches front to back Are you the property owner: Owner of the property Property Type: Detached What level of service do you...
Haverfordwest - SA62
Enquiry from: Mike R
Start Date: Immediate
Replacement of existing decking
Tenby - SA70
Enquiry from: Catherine T
Start Date: Immediate
Are you the property owner: Owner of the property Property Type: Semi detached Other Forms: None Please call to appoint
Milford Haven - SA73
Enquiry from: Rafael S
Start Date: 1 to 3 months
Are you the property owner: Owner of the property Property Type: Semi detached Time scale: 1-3 months Other Forms: Porches Agreed to recieve quotes for selected products: Yes Please call to appoint
Milford Haven - SA73
Enquiry from: Jane D
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Weed clearing. Plant clearing round small deck. Planting pots. General clearing ...
Kilgetty - SA68
Enquiry from: Libby H
Start Date: Immediate
Submit your free quote for rated tradespeople
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Narberth | £975-£2,495 |
Carpenters and joiners in Narberth | £375-£575 |
Plasterboard dry lining in Narberth | £638-£978 |
Wood flooring in Narberth | £750-£1,150 |
Wooden decking in Narberth | £1,125-£1,725 |
Garden shed in Narberth | £475-£1,595 |
Wooden window repair in Narberth | £320-£480 |
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.
Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look! Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe. Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs. Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.
Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
• Incorporate flexible wood on concrete adhesives.
• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
• Put 10mm spacers against the wall to see to the consistency in expansion gaps.
• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
• Make use of a porta-nailer.
• Position 10mm spacers against the wall - parallel with the installation direction.
• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Narberth.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today