Find a Carpenter you can trust in East Midlands.

Choose from 438 Carpenters, all rated by people like you.

Over 522 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

Advertisement
View Shortlist
Verified ProOver 20 Reviews

Abacus Restoration

39 review(s)
Offers services in EAST MIDLANDS
With over 25 years of experience, Abacus Restoration specialises in the repair, restoration and ongoing maintenance of uPV...
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in EAST MIDLANDS
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 20 Reviews

CRS Contractors

20 review(s)
Offers services in EAST MIDLANDS
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified Pro

Four Seasons Tree & Garden Care

3 review(s)
Offers services in EAST MIDLANDS
We pride ourselves on our reputation, services we provide Here at four seasons tree and garden care, is wide range down to...
Verified Pro

Austin Evill Construction

0 review(s)
Offers services in EAST MIDLANDS
Time Served Bricklayer 35 years in the construction industry, project manage jobs for various clients since 1989. Extensio...
Verified Pro

Damp Defender UK

0 review(s)
Offers services in EAST MIDLANDS
With over 30 years of experience, we're your trusted specialists in treating rising damp, penetrating damp, condensation a...

Recent Carpenter Enquiries

10 Sep

Carpentry

Nottingham - NG7

Enquiry from: Venice V

Start Date: Immediate

How much would it cost to hang 3 fire door

Post a similar request >

30 Aug

Garden Shed

Leicester - LE2

Enquiry from: Hamida V

Start Date: Immediate

I would like a roof over half of my garden with a small storage shed

Post a similar request >

29 Aug

Garden Shed

Coalville, Ibstock, Markfield - LE67

Enquiry from: John B

Start Date: Immediate

Torch on felt for 10x10 shed or rubber roof

Post a similar request >

24 Aug

Kitchen Fitting

Lincoln - LN3

Enquiry from: Michael B

Start Date: Immediate

Quote to cover or replace kitchen worktops

Post a similar request >

24 Aug

Carpentry

Lincoln - LN3

Enquiry from: Michael B

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

Quote to replace trimming around worktops

Post a similar request >

04 Aug

Carpentry

Wellingborough - NN8

Enquiry from: Mike B

Start Date: Immediate

Installed a new carpet and now the door needs a minor shaving at the base as it now rubs on the carpet. Please TEXT an estimated cost

Post a similar request >

31 Jul

Stud Wall & Plasterboard

Melton Mowbray - LE13

Enquiry from: Daniel A

Start Date: Immediate

Looking for a stud wall to be built in a retail unit, with a fire door fitted and possibly a step up to the fire door depending on placement of the wall

Post a similar request >

19 Jul

Carpentry

Nottingham - NG5

Enquiry from: Barbara O

Start Date: Immediate

Hand rail Kitchen kickboard

Post a similar request >

15 Jul

Carpentry

Nottingham - NG10

Enquiry from: David B

Start Date: Immediate

New window shelve in Conservatory

Post a similar request >

17 Jun

Carpentry

Spalding - PE12

Enquiry from: Michael F

Start Date: Immediate

We need a new sliding wooden door to fit a gap 40inches x 84inches. Thanks

Post a similar request >

12 Jun

Wooden Window Repair

Kettering - NN14

Enquiry from: Yvonne B

Start Date: Immediate

The bottom part of the outer wooden frame that surrounds 1 of the windows of my summer house needs replacing

Post a similar request >

11 Jun

Kitchen Fitting

Newark - NG23

Enquiry from: Mark R

Start Date: Immediate

Fit Replacement Fitted kitchen composite sink

Post a similar request >

17 Apr

Carpentry

Harpenden - AL5

Enquiry from: Wanda W

Start Date: Immediate

I would like a wooden dining table to be recycled to make and extension to the current kitchen work tops

Post a similar request >

20 Mar

Carpentry

Mablethorpe - LN12

Enquiry from: Kenneth B

Start Date: Immediate

Bottom of front door has come apart

Post a similar request >

07 Mar

Carpentry

Nottingham - NG9

Enquiry from: Jon K

Start Date: Immediate

Door and screen to toilet in new upstairs location

Post a similar request >

17 Feb

Carpentry

Leicester - LE5

Enquiry from: Sumerjit R

Start Date: Immediate

I need the current understairs door replaced with a larger one so there us better access

Post a similar request >

09 Feb

Garden Decking

Hope Valley - S33

Enquiry from: Ash W

Start Date: Immediate

Replacing old wooden decking with composite decking

Post a similar request >

15 Dec

Carpentry

Sleaford - NG34

Enquiry from: Derek L

Start Date: Immediate

I have a hinged wooden door on what used to be a garage that is rotting. i need a new door with lock and possibly a frame but i would take advice on that

Post a similar request >

24 Nov

Wooden Window Repair

Nottingham - NG14

Enquiry from: MATTHEW N

Start Date: Immediate

Several double glazed windows (around 6 small panes) have misted up in our cottage

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in East Midlands is:

£1,068

Carpenter job Carpenter cost in 2026
Kitchen Fitting in East Midlands £1,659-£3,665
Carpenters and joiners in East Midlands £375-£575
Plasterboard dry lining in East Midlands £638-£978
Wood flooring in East Midlands £750-£1,150
Wooden decking in East Midlands £509-£2,909
Garden shed in East Midlands £267-£664
Wooden window repair in East Midlands £320-£480

Related Carpenter searches in East Midlands

Carpenter FAQs

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in East Midlands.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in East Midlands?

View our open Carpenter jobs near you

Join today
View Shortlist