Find a Carpenter you can trust in Battle.

Choose from 311 Carpenters, all rated by people like you.

Over 224 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in BATTLE
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro
Welcome to First Response Contractors Ltd!, we are a company with over 18 years of experience that prides itself on qualit...
Verified ProOver 10 Reviews
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

White Cliff Gardens

2 review(s)
Offers services in BATTLE
We cater for all your gardening/landscaping needs. 
We offer a wide range of services to suit all budgets, including: •...
Verified Pro
We are a small, family run business with 10 years experience in the industry and specialise in all aspects of air conditio...

Recent Carpenter Enquiries

20 Jan

Carpentry

Battle - TN33

Enquiry from: Mervyn B

Start Date: Immediate

exterior door replacement,two internal door replacement. are you the property owner: owner of the property property type: terrace do you require a door(s): front door what level of service do you requ...

Post a similar request >

15 Jun

Garden | Sheds

Battle - TN33

Enquiry from: Henry E

Start Date: Immediate

Back garden approx 10x40m, sloped hill with a concrete patio at the top. Looking to get the slope smoothed out, a derelict shed removed, around 28m of fencing replaced, and patio refurbished with eith...

Post a similar request >

15 Apr

Kitchen | Fitting

Battle - TN33

Enquiry from: Neil B

Start Date: Immediate

removal of splash back strip from behind a 4 plate hobb. the backing splash plate has been damaged due to heat from one of the heating hobbs. solution would be to remove the splash backing plate an...

Post a similar request >

28 Jun

Carpentry

Bexhill-on-Sea - TN39

Enquiry from: Julie C

Start Date: Immediate

Treads to steel staircase and balustrades Long run of skeiling cupboards Window seat Shelving in walk-in cupboard Partitions between single beds in kids bedroom Alcove shelving

Post a similar request >

14 Jun

Carpentry

Bexhill-on-Sea - TN40

Enquiry from: Keely R

Start Date: Immediate

Broken plinth and doors misaligned on kitchen cabinets

Post a similar request >

13 Jan

Carpentry

Bexhill-on-Sea - TN40

Enquiry from: Maurice P

Start Date: Immediate

I have purchased a replcement fire door for my integral garage, including the lock and handle. I need a carpenter to fit it. I think there needs to be additional door stopping as the current door has ...

Post a similar request >

30 Nov

Carpentry

Bexhill-on-Sea - TN39

Enquiry from: Richard P

Start Date: Immediate

Remove bannisters from raised dining area and replace with bespoke display unit , 3 metres long .

Post a similar request >

12 Nov

Carpentry

Robertsbridge - TN32

Enquiry from: Joseph A

Start Date: Immediate

Hi - looking for someone to build a pitched roof for our development in Robertsbridge. Do you have any availability?

Post a similar request >

01 Nov

Carpentry

Bexhill-on-Sea - TN39

Enquiry from: Alison B

Start Date: Less than one month

hi, we are looking to repair/restore our front porch and also need a new front door installed. many thanks are you the property owner: owner of the property property type: semi detached what type of j...

Post a similar request >

16 Jan

Windows | Wooden | Repair

Polegate - BN26

Enquiry from: Dmitri S

Start Date: Immediate

wood on our window frames deteriorated in places and windows leak when it rains. we need window sills repaired or replaced. are you the property owner: owner of the property property type: detached w...

Post a similar request >

27 Oct

Interior work | Stud Walls

Polegate - BN26

Enquiry from: Lester B

Start Date: Immediate

To form two stud walls for new bathroom 2m x 1m with door in middle of 2 m. Paperboard to inside wall and to other 2 walls for tiling by bathroom fitter within 2 weeks.

Post a similar request >

02 Sep

Carpentry

Eastbourne - BN23

Enquiry from: Paul W

Start Date: Immediate

hello, i need a new kitchen latch door handle fitted to my kitchen door, are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden...

Post a similar request >

22 Aug

Garden | Decking

Eastbourne - BN20

Enquiry from: Christine S

Start Date: Immediate

remove decking and dispose are you the property owner: owner garden type: back garden work required: decking property type: terrace do you have a: small garden current state of garden: the garden is n...

Post a similar request >

14 Aug

Garden | Decking

Polegate - BN26

Enquiry from: John D

Start Date: Immediate

have bought gardenline decking tiles to go on flat roof. tiles are 30cm x 30cm. the flat roof is approx 4.2m x 1 8m. the flat roof is angled so 1.8m wide at one end and 1.96 other end so tiles need t...

Post a similar request >

11 Jun

Carpentry

Eastbourne - BN23

Enquiry from: Michael G

Start Date: Immediate

to build and fit a small cupboard in the on suite. with high gloss door and maybe two shelves are you the property owner: owner of the property what type of job are you looking to have done: other

Post a similar request >

28 Apr

Garden | Decking

Bexhill-on-Sea - TN39

Enquiry from: Colin D

Start Date: Immediate

back garden and side area - estimate please are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

03 Apr

Carpentry

Bexhill-on-Sea - TN39

Enquiry from: Tony D

Start Date: 1 to 3 months

supply and replace all internal doors are you the property owner: owner of the property property type: detached what level of service do you require: supplied and fitted what type of job are you looki...

Post a similar request >

01 Dec

Garden | Decking

Pevensey - BN24

Enquiry from: Gaynor L

Start Date: Immediate

replace decking to include struts under. rear of property. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call ...

Post a similar request >

23 Nov

Garden | Decking

Pevensey - BN24

Enquiry from: Gaynor L

Start Date: Immediate

replace decking to include struts under. rear of property. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call ...

Post a similar request >

18 Nov

Garden | Decking

Pevensey - BN24

Enquiry from: Gaynor L

Start Date: Immediate

replace decking to include struts under. rear of property. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Battle is:

£1,018

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Battle £1,238-£3,748
Carpenters and joiners in Battle £375-£575
Plasterboard dry lining in Battle £638-£978
Wood flooring in Battle £750-£1,150
Wooden decking in Battle £1,125-£1,725
Garden shed in Battle £450-£690
Wooden window repair in Battle £320-£480

Related Carpenter searches in Battle

Carpenter FAQs

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Battle.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Battle?

View our open Carpenter jobs near you

Join today
View Shortlist