Find a Carpenter you can trust in Eastbourne.

Choose from 58 Carpenters, all rated by people like you.

Over 87 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

02 Sep

Carpentry

Eastbourne - BN23

Enquiry from: Paul W

Start Date: Immediate

hello, i need a new kitchen latch door handle fitted to my kitchen door, are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden...

Post a similar request >

22 Aug

Garden | Decking

Eastbourne - BN20

Enquiry from: Christine S

Start Date: Immediate

remove decking and dispose are you the property owner: owner garden type: back garden work required: decking property type: terrace do you have a: small garden current state of garden: the garden is n...

Post a similar request >

11 Jun

Carpentry

Eastbourne - BN23

Enquiry from: Michael G

Start Date: Immediate

to build and fit a small cupboard in the on suite. with high gloss door and maybe two shelves are you the property owner: owner of the property what type of job are you looking to have done: other

Post a similar request >

04 Sep

Garden | Decking

Eastbourne - BN22

Enquiry from: Alan K

Start Date: Immediate

rip up all or part of outside patio decking and replace with paving. decking exposed to weather is rotting so i am looking for a more economic system. area is small area outside conservatory. are you...

Post a similar request >

19 Aug

Garden | Decking

Eastbourne - BN22

Enquiry from: Peter H

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: terrace work description: two areas of decking to be removed one area to be replaced with new decking.other ...

Post a similar request >

22 Jun

Garden | Decking

Eastbourne - BN22

Enquiry from: Simon H

Start Date: Immediate

decking has been down for about 15 years would like someone to look at the framing underneath the decking. are you the property owner: owner of the property property type: semi detached what level of ...

Post a similar request >

19 Mar

Garden | Decking

Eastbourne - BN20

Enquiry from: David C

Start Date: Immediate

the installation of decking on a sloping site on the side of the house. possibly the installation of some storage facilities. are you the property owner: owner of the property property type: detached...

Post a similar request >

23 Nov

Garden | Decking

Eastbourne - BN22

Enquiry from: Ruth T

Start Date: Immediate

replace decking the courtyard garden. please note that this is a rented property and i am the landlord. i would like a quote please and i would appreciate if you could liaise with the tenant to find a...

Post a similar request >

12 Nov

Carpentry

Eastbourne - BN20

Enquiry from: Yvonne A

Start Date: Immediate

5internal doors to be fitted plus door furniture are you the property owner: owner of the property property type: other what level of service do you require: fit only what type of job are you looking ...

Post a similar request >

03 Sep

Carpentry

Eastbourne - BN23

Enquiry from: Tina M

Start Date: Less than one month

repair to summerhouse. approx 8 panes of glass. door not shutting. possible replacement of beading. maybe painting. time scale: less than one month please call to appoint

Post a similar request >

01 Sep

Garden | Sheds

Eastbourne - BN21

Enquiry from: Robert P

Start Date: 1 to 3 months

to dismantle and remove old small shed supply and erect new small shed time scale: 1-3 months please call to appoint

Post a similar request >

22 Aug

Garden | Decking

Eastbourne - BN22

Enquiry from: Diane B

Start Date: Immediate

small decking area needs replacing are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint

Post a similar request >

21 Aug

Kitchen | Fitting

Eastbourne - BN23

Enquiry from: Loveness N

Start Date: Immediate

fit a kitchen. bought from wren. fitting booklet provided by wren. are you the property owner: owner of the property what level of service do you require: install only what is your budget for this pro...

Post a similar request >

07 Oct

Windows | Wooden | Repair

Eastbourne - BN20

Enquiry from: Jeannette H

Start Date: Less than one month

Homeowner Wooden window frame repair Please contact to appoint * Number of Windows: 1 Window Need Doors: Front Door Material: PVCu Are you the property owner: Owner of the property What level of ...

Post a similar request >

25 Aug

Garden | Decking

Eastbourne - BN22

Enquiry from: Katy H

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Hi. We are thinking a stepped deck a flat deck. Patio and path. Garden needs leve...

Post a similar request >

08 May

Kitchen | Fitting

Eastbourne - BN22

Enquiry from: Roberta K

Start Date: Immediate

Move kitchen sink from one area to another. Move outside water tap.

Post a similar request >

15 May

Garden | Decking

Eastbourne - BN22

Enquiry from: Lorraine R

Start Date: Immediate

I would like an L shaped ground level deck approx( 7.62m X 2.40m laid on top of existing concrete patio) and approx (6.09 X 2.40 laid on top of existing gravel)

Post a similar request >

27 May

Garden | Decking

Eastbourne - BN21

Enquiry from: Donna B

Start Date: 3+ months

Work description: Raised patio area for BBQs, Decking area and to re slab rest of garden. Are you the property owner: Owner of the property Property Type: Semi detached What level of service do y...

Post a similar request >

30 Apr

Garden | Decking

Eastbourne - BN22

Enquiry from: Chris E

Start Date: Immediate

Need requirements to deck part of my garden ie what additional timber and sundries I would need? Are you the property owner: Tenant (with permission) Property Type: Terrace What level of service...

Post a similar request >

16 Apr

Carpentry

Eastbourne - BN23

Enquiry from: P H

Start Date: Immediate

I have a rotary larder cupboard with a jammed door, can you repair this for me ? Homeowner Please contact to appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Eastbourne is:

£1,018

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Eastbourne £1,238-£3,748
Carpenters and joiners in Eastbourne £375-£575
Plasterboard dry lining in Eastbourne £638-£978
Wood flooring in Eastbourne £750-£1,150
Wooden decking in Eastbourne £1,125-£1,725
Garden shed in Eastbourne £450-£690
Wooden window repair in Eastbourne £320-£480

Related Carpenter searches in Eastbourne

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Eastbourne.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Eastbourne?

View our open Carpenter jobs near you

Join today
View Shortlist