Find a Carpenter you can trust in Buckhurst Hill.

Choose from 169 Carpenters, all rated by people like you.

Over 348 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in BUCKHURST HILL
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 20 Reviews

CRS Contractors

20 review(s)
Offers services in BUCKHURST HILL
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified Pro

JMC Tremendous Tree & Landscapes

0 review(s)
Offers services in BUCKHURST HILL
My company has been working for over 50 years. l am James any garden we can sort out make it all worth the ef...
Verified ProOver 10 Reviews

Home Counties Driveways & Patios

13 review(s)
Offers services in BUCKHURST HILL
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

Furnish Home

0 review(s)
Offers services in BUCKHURST HILL
We Provide Loft Conversions, Boarding, Loft Insulation, Hatch, Ladders, Velux, plasterboarding & Loft Storage Solutions in...

Recent Carpenter Enquiries

19 Dec

Garden | Decking

Buckhurst Hill - IG9

Enquiry from: Rajani R

Start Date: Immediate

decking replacement as it's rotting. are you the property owner: owner of the property property type: semi detached what level of service do you require: deck only please call to appoint

Post a similar request >

31 Aug

Garden | Sheds

Buckhurst Hill - IG9

Enquiry from: Philippa B

Start Date: Immediate

are you the property owner: owner property type: detached other forms: garden shed, building maintenance agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

12 Sep

Garden | Sheds

Buckhurst Hill - IG9

Enquiry from: Kazim A

Start Date: Less than one month

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Cut grass, edge. reduce overgrowt. clear weeds if any. Are you the proper...

Post a similar request >

18 Aug

Garden | Sheds

Buckhurst Hill - IG9

Enquiry from: Kazim A

Start Date: Less than one month

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Cut grass, edge. reduce overgrowt. clear weeds if any. Are you the proper...

Post a similar request >

02 Jun

Carpentry

Buckhurst Hill - IG9

Enquiry from: Eslyn R

Start Date: Immediate

to arrange for fencing at boundary line, to put up a fence and a retaining wall.

Post a similar request >

09 May

Garden | Decking

Buckhurst Hill - IG9

Enquiry from: Jay J

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: We are seeking a gardener/landscaper to complete the following jobs in our back ...

Post a similar request >

01 Sep

Carpentry

Buckhurst Hill - IG9

Enquiry from: Danielle J

Start Date: Immediate

Louvered doors to replace 6 old fitted wardrobe doors. All 2302mm H. Two 445mm W; Four 595mm W Please call to appoint

Post a similar request >

04 Feb

Carpentry

London - NW7

Enquiry from: Nigel F

Start Date: Immediate

we have an office/summerhouse that needs repairs. We had a repair a few years ago and now the planks above those that were replaced need doing as well. Also the side window needs replacing. Access is ...

Post a similar request >

17 May

Garden | Decking

London - NW2

Enquiry from: Lorraine A

Start Date: Immediate

looking to revamp my garden are you the property owner: tenant (with permission) property type: semi detached garden type: back garden do you have a design: no, but i have some thoughts work required:...

Post a similar request >

24 Apr

Kitchen | Fitting

London - NW2

Enquiry from: John M

Start Date: Immediate

Small kitchen needs replacing with floor & new window.

Post a similar request >

13 Mar

Carpentry

Hatfield - AL10

Enquiry from: Sam S

Start Date: Immediate

2 x free-standing kitchen cupboards: - Full-height cupboard (approx. H 93 cm; W 33cm) with variable shelving and ‘storage’ doors. - Fridge housing with cupboard over (approx. H 210, W 60 cm) ...

Post a similar request >

10 Oct

Carpentry

London - W6

Enquiry from: Douglas B

Start Date: Immediate

Removal of box in boards to access pipes

Post a similar request >

25 Sep

Interior work | Stud Walls

Wembley - HA9

Enquiry from: Naren P

Start Date: Immediate

A tradesman required to install drywall, plaster and skim and also to I shall floorboards in a roof extension that is partly completed as a shell

Post a similar request >

26 Mar

Interior work | Stud Walls

London - W14

Enquiry from: Alessandra C

Start Date: Immediate

50sqm flat renovation with : - internal stud wall demolitions and reconstruction, - small structural demolition of a 30cm portion of a load bearing wall -bathroom renovation - move kitchen in living r...

Post a similar request >

25 Mar

Carpentry

Borehamwood - WD6

Enquiry from: Sally R

Start Date: Immediate

i have a lounge internal door that needs planing and hanging are you the property owner: tenant (with permission) property type: other do you require a door(s): none time scale: immediate what level o...

Post a similar request >

24 Aug

Garden | Sheds

Edgware - HA8

Enquiry from: Zahi A

Start Date: Immediate

I am looking to install a new garden shed.

Post a similar request >

19 Aug

Garden | Sheds

Edgware - HA8

Enquiry from: Zahi A

Start Date: Immediate

I am looking to install a new garden shed.

Post a similar request >

17 Aug

Carpentry

Borehamwood - WD6

Enquiry from: Coleen N

Start Date: Immediate

fitting 6 interior doors and one front doorr d are you the property owner: tenant (with permission) do you require a door(s): none what type of job are you looking to have done: wooden window/doors ti...

Post a similar request >

02 Aug

Kitchen | Fitting

London - W11

Enquiry from: Neil A

Start Date: Immediate

remove and replace electric hob with a new gas hob. I supply the hob new. Connect and

Post a similar request >

29 Jun

Garden | Sheds

London - NW2

Enquiry from: RIVKA J

Start Date: Immediate

an area of 7x18 m requires clearance (ivy and old composed heap) and design to accommodate a shed, wilding area and a trampoline for children. are you the property owner: relative of owner do you hav...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Buckhurst Hill is:

£1,018

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Buckhurst Hill £1,238-£3,748
Carpenters and joiners in Buckhurst Hill £375-£575
Plasterboard dry lining in Buckhurst Hill £638-£978
Wood flooring in Buckhurst Hill £750-£1,150
Wooden decking in Buckhurst Hill £1,125-£1,725
Garden shed in Buckhurst Hill £450-£690
Wooden window repair in Buckhurst Hill £320-£480

Related Carpenter searches in Buckhurst Hill

Carpenter FAQs

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Buckhurst Hill.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Buckhurst Hill?

View our open Carpenter jobs near you

Join today
View Shortlist