Carpentry
Bromley, Keston - BR2
Enquiry from: Florence M
Start Date: Immediate
I need renovating kitchen and garage
Over 431 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Bromley, Keston - BR2
Enquiry from: Florence M
Start Date: Immediate
I need renovating kitchen and garage
London - E13
Enquiry from: Victorino P
Start Date: Immediate
Room partitioing and wood flooring repairs
London - SE18
Enquiry from: Mai D
Start Date: Immediate
A worktop has sunk from the wall slightly behind the sink. Can it be restored?
London - E16
Enquiry from: Richard C
Start Date: Immediate
Dual fuel cooker installation in kitchen
Bromley, Keston - BR2
Enquiry from: Olufemi O
Start Date: Immediate
We've got the units from Howdens, we need a competent fitter for the entire kitchen
Billericay - CM12
Enquiry from: Scott W
Start Date: Immediate
Decking frame and decking built in garden. Size 5m x 4m triangle prism shape. Looking for mid range wooden decking. Area cleared and ready to build. Will need weed sheet cover underneath
Rainham - RM13
Enquiry from: Charmaine C
Start Date: Less than one month
Two internal doors to hang require a carpenter specialised in hanging two internal doors but doors will need to be customised. so need someone who specialises in doing this. i will supply doors, hinge
London - E12
Enquiry from: Peggie S
Start Date: Immediate
One step on stairwell has collapsed also need to install glass bannister (in kit form)
Bromley, Keston - BR2
Enquiry from: Olufemi O
Start Date: Immediate
I've got kitchen units from Howdens and a design so I need someone to refurbish the kitchen
Basildon - SS15
Enquiry from: Sornam B
Start Date: Immediate
Picket fencing putting around the garden
Romford - RM3
Enquiry from: Bridget O
Start Date: Immediate
2 stud walls to split the living room and one to seal of the kitchen
Romford - RM3
Enquiry from: Vis P
Start Date: Immediate
Looking to build under copboards under my stairway
London - E16
Enquiry from: Duc V
Start Date: Immediate
Make the concrete Shed floor
London - SE6
Enquiry from: Oloruntoba E
Start Date: Immediate
Replace garden gate and repair conservatory
London - SE3
Enquiry from: Sam C
Start Date: Immediate
I'm refurbishing a 1960's house with its original white timber framed windows. They're a mix of single and double glazing - and also varying condition, from actually rather good condition (but still r
Leigh-on-Sea - SS9
Enquiry from: Craig B
Start Date: Immediate
I need decking replaced and a pergola put over the top good prices please
London - E18
Enquiry from: Ananth K
Start Date: Immediate
Fit a fire door and frame to council specifications and a hand rail for stairs
London - SE2
Enquiry from: Martin B
Start Date: Immediate
Hip cuts for a trussed roof on a new build
London - SE7
Enquiry from: Susan E
Start Date: Immediate
1.remove and replace oak trim at base of staircase. 2.beading to curved coffee table
Grays - RM16
Enquiry from: Peter T
Start Date: Immediate
Shed Assemble , Flat Pack Plastic Green Garden Shed
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Grays | £1,238-£3,748 |
| Carpenters and joiners in Grays | £375-£575 |
| Plasterboard dry lining in Grays | £638-£978 |
| Wood flooring in Grays | £750-£1,150 |
| Wooden decking in Grays | £1,125-£1,725 |
| Garden shed in Grays | £450-£690 |
| Wooden window repair in Grays | £320-£480 |
The flight of steps in your multi-storey household doesn’t have to be purely efficient. With just a little thought given to banister design, the boring flight of stairs can turn into something you would like to show to people and be proud of. Replacement of your banister can even enhance the worth of your property, giving the entry an outstanding presence. But how much will new banisters and spindles cost you?
If you are considering starting with this project, having a help from a professional is always advised.
New banister cost
Banisters are also known as handrails. They are reinforced by balustrades or spindles – a row of pillars that improve the security of the stairway and donate in the direction of the overall look and feel. Banisters and spindles may appear dull due to use over time. A fresh coat of polish might help your staircase get a new facelift.
The cost of new banisters and spindles will fluctuate solely reliant on the material. The price for a new banister starts around £40 for softwood and can reach £120 for a metal one.
Spindle prices are also a contributing factor in determining the cost with prices in the range of £30 to £150 per meter based on the materials used.
How much does a new staircase banister cost?
Hiring a professional is very important when trying to properly install a new banister since they are familiar with the process and work as per safety compliance. Fitting your new banister can be easily taken care by a general builder as well as a carpenter.
Below is a table depicting the average costs of different types of bannisters and spindles:
White oak bannister is around £105 and spindles are around £13.50.
Pine bannister is around £35 and spindles are around £7.
Primed wood bannister costs around £31 and spindles costing around £18.
Metal bannister is around £110 with the spindles being around £6.
What Is Engineered Wood Flooring?
Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.
Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.
The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:
• Its very easy and simple to install
• When compared to solid wood flooring, it’s more cost effective.
• It can be utilized alongside an under floor heating
• It can be loose laid, meaning it does not need to be fixed in position
• It is available in multiple varieties of wood and finishes
• It can be incorporated alongside an underlay including thermal barriers
• It can be utilized in areas with a fluctuating humidity and temperature.
• It is available in different kinds of thickness.
Click here to learn more about wood flooring.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Grays.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today