Carpentry
Rayleigh - SS6
Enquiry from: Sheri V
Start Date: Immediate
Need cupboard built in living room to house a Jaybe fold up bed.
-->
Over 235 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Rayleigh - SS6
Enquiry from: Sheri V
Start Date: Immediate
Need cupboard built in living room to house a Jaybe fold up bed.
Rayleigh - SS6
Enquiry from: Karina M
Start Date: Immediate
Hi there, We have a number of smaller carpentry jobs not a larger project. We are looking for someone to fix some missing door trim, re-hang a door so it opens the other way and have a look at an ar...
Rayleigh - SS6
Enquiry from: Janice R
Start Date: Immediate
repair and replace wooden decking boards that have rotted are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to...
Rayleigh - SS6
Enquiry from: Les D
Start Date: Immediate
Garden shed 8x6
Rayleigh - SS6
Enquiry from: Anthony O
Start Date: Immediate
Complete the installation of a part fitted kitchen. Fit doors,worktops,sink & taps plaster finish 2 walls each 80cm x 2.4m floor to ceiling patch ceiling & screed that part of floor (a boiler housing...
Rayleigh - SS6
Enquiry from: Westlie W
Start Date: 1 to 3 months
Plaster walls & ceiling Move water pipes Cut off gas Maybe move power points. Install 10 units Install oven, hob, fan, dishwasher, fridge/feeezer, wash machine. Are you the property owner: Owne...
Rayleigh - SS6
Enquiry from: John L
Start Date: Immediate
To fit standard b and q small kitchen units . Try to save work tops and tiling Homeowner Please contact to appoint
Billericay - CM12
Enquiry from: Melvin B
Start Date: Immediate
Repair gazebo. Some of the decking and wood is rotten
Grays - RM16
Enquiry from: Peter T
Start Date: Immediate
Shed Assemble , Flat Pack Plastic Green Garden Shed.
Ingatestone - CM4
Enquiry from: Sarah B
Start Date: Immediate
Walnut dining table top changed from rectangular to oval
Basildon - SS16
Enquiry from: Timea S
Start Date: Immediate
Hi. In need of a pull out counter to be fitted in one of the kiosks at Basildon marketplace. Looking to get a quote quick to be able to move forward with our business. Please get in touch as soon a...
Gravesend - DA12
Enquiry from: Luke S
Start Date: Immediate
Quote to fix the stringer on the first two steps of our staircase. Best to email/text as not able fto take clals due to work.
Gravesend - DA12
Enquiry from: Bob R
Start Date: Immediate
We are looking to refurbish our kitchen - New door and worktops etc.
Chelmsford - CM1
Enquiry from: Rashila N
Start Date: Immediate
Hello, I have 4 old wooden dining chairs that I would like sprayed. Is this something you do? Thanks Rashila
Basildon - SS16
Enquiry from: Joel P
Start Date: Immediate
Hello, I am wondering if you can quote to install fire doors, and if so can you supply fire door blanks like this one - https://www.howdens.com/joinery/doors/howdens-solid-core-blank-plywood-flu...
Gravesend - DA12
Enquiry from: John R
Start Date: Immediate
New door architrave / fit door. Some skirting. Thanks John
Upminster - RM14
Enquiry from: Laurence B
Start Date: Less than one month
11 lincoln doors/hinges/handles - old doors removed. 6 glazed are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/do...
Chelmsford - CM1
Enquiry from: Alauddin A
Start Date: Immediate
wooden timber decking 11 fit wide and 15 fit long , are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call t...
Grays - RM16
Enquiry from: Dean R
Start Date: Immediate
repalce patio slabs with decking? are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint
Chelmsford - CM1
Enquiry from: Amrudha R
Start Date: Immediate
customer requested quotes for garden shed from a carpenter around chelmsford. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information be...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Rayleigh | £1,238-£3,748 |
Carpenters and joiners in Rayleigh | £375-£575 |
Plasterboard dry lining in Rayleigh | £638-£978 |
Wood flooring in Rayleigh | £750-£1,150 |
Wooden decking in Rayleigh | £1,125-£1,725 |
Garden shed in Rayleigh | £450-£690 |
Wooden window repair in Rayleigh | £320-£480 |
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Rayleigh.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today