Carpentry
Stansted - CM24
Enquiry from: Hayley G
Start Date: Immediate
We are thinking of having a tv bookcase with cupboard space underneath built in our lounge. The approximate width of the whole unit would be 3m.
Over 239 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Stansted - CM24
Enquiry from: Hayley G
Start Date: Immediate
We are thinking of having a tv bookcase with cupboard space underneath built in our lounge. The approximate width of the whole unit would be 3m.
Ware - SG12
Enquiry from: Nigel S
Start Date: Immediate
Assembly of plastic shed 152cmx991cmx193.5cm base will be ready no clearance of any sort straight forward assembly
Epping - CM16
Enquiry from: Carol B
Start Date: Immediate
Replace 2 wooden cills 1 on small upper window the other under patio doors
Epping - CM16
Enquiry from: Carol B
Start Date: Immediate
2x replacement window cills
Ware - SG12
Enquiry from: David S
Start Date: Immediate
replace and uplift existing wooden decking - 18ft x 13ft quotation estimate please are you the property owner: owner of the property property type: terrace what level of service do you require: supply...
Braintree - CM77
Enquiry from: Beth B
Start Date: Immediate
Quote to replace a porch door, whether sourced myself or through you? The door will need adjusting for the lock and opening handles.
Harlow - CM17
Enquiry from: Simon P
Start Date: Immediate
removal of decking and replace with new wooden decking are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call...
Epping - CM16
Enquiry from: Kevin L
Start Date: Immediate
all in the back garden, timing ideally from feb to early spring. tree surgery; lopping and shaping to 2 or 3 trees clearing, moving and replanting in 2 large perimeter beds; to bring variety and colou...
Much Hadham - SG10
Enquiry from: Jackie S
Start Date: Immediate
i have around 20 wooden sash windows that i need refurbished
Sawbridgeworth - CM21
Enquiry from: John O
Start Date: Immediate
fit evokit pocket door. wooden, 2 doors. all kit on site and ready to be fitted are you the property owner: relative of owner property type: semi detached what type of job are you looking to have do...
Much Hadham - SG10
Enquiry from: Neil U
Start Date: 1 to 3 months
we need 2 replacement glazed units for wooden windows are you the property owner: owner of the property property type: detached what service are you looking for: reglazing how many windows are involv...
Hertford - SG14
Enquiry from: Andrew K
Start Date: Immediate
back door lock is stiff, door has slanted over time due to its weight - needs re-hanging, possibly with stronger hinges are you the property owner: owner of the property property type: terrace what ty...
Harlow - CM18
Enquiry from: Jean A
Start Date: 1 to 3 months
to block in the front of a garage and put a door in are you the property owner: owner of the property property type: detached what type of job are you looking to have done: shed/log cabin, other what ...
Harlow - CM18
Enquiry from: Jean A
Start Date: Less than one month
to block in a garage opening and put a door in are you the property owner: owner of the property property type: detached what type of job are you looking to have done: shed/log cabin do you require a ...
Sawbridgeworth - CM21
Enquiry from: Tarik S
Start Date: Immediate
the soil height in the garden will be lowered and the removed soil will be taken and gone. are you the property owner: owner property type: semi detached garden type: back garden do you have a: large ...
Hoddesdon - EN11
Enquiry from: Stephen D
Start Date: Less than one month
we would like to change 14 internal doors are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: wooden window/doors how many windows d...
Hertford - SG13
Enquiry from: Jeremy K
Start Date: 1 to 3 months
this is a small office building in a converted, 19th century mews - location just outside hertford. we have three large, arch-shaped, wood-framed windows to the rear where there are areas suffering f...
Epping - CM16
Enquiry from: Josef L
Start Date: Immediate
6ft *** garden shed to be delivered on friday need someone to set it up. are you the property owner: owner of the property do you have a: large garden what level of service are you looking for: insta...
Hertford - SG13
Enquiry from: Amanda B
Start Date: Immediate
Re-Artex the ceiling of a small kitchen (2 bed home). Has previously been artexed but not under light and now want to put down lights in. Also likely to be several other jobs including preparing w...
Broxbourne - EN10
Enquiry from: George M
Start Date: Immediate
20sq meters decking are, installation required mid to end of august are you the property owner: owner of the property what level of service do you require: supply and deck property type: detached ple...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Stansted | £1,475-£3,665 |
| Carpenters and joiners in Stansted | £375-£575 |
| Plasterboard dry lining in Stansted | £638-£978 |
| Wood flooring in Stansted | £750-£1,150 |
| Wooden decking in Stansted | £1,125-£1,725 |
| Garden shed in Stansted | £450-£690 |
| Wooden window repair in Stansted | £320-£480 |
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
How Much Plasterboard Do I Need?
Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!
lTake Square Footage Measurement
• Measure the square footage of the area where the plasterboard will be fitted.
• Multiply the height by the width of each wall or ceiling area.
• Add all quantities to obtain a total square-foot amount.
lCalculate Drywall Sheets
• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.
• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).
• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.
We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Stansted.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today