Find a Carpenter you can trust in Wickford.

Choose from 111 Carpenters, all rated by people like you.

Over 237 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in WICKFORD
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 20 Reviews

CRS Contractors

20 review(s)
Offers services in WICKFORD
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified ProOver 10 Reviews
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

Furnish Home

0 review(s)
Offers services in WICKFORD
We Provide Loft Conversions, Boarding, Loft Insulation, Hatch, Ladders, Velux, plasterboarding & Loft Storage Solutions in...
Verified Pro

Doctor roof

0 review(s)
Offers services in WICKFORD
Doctor Roof Limited is a trusted roofing specialist providing high-quality roofing, guttering, soffits, and fascias servic...
Verified Pro

Paveway

0 review(s)
Offers services in WICKFORD
Specialist groundwork contractor, proficient service in Paving, Drainage, Concrete works and Foundations, Hard and Soft La...

Recent Carpenter Enquiries

08 Mar

Kitchen | Fitting

Wickford - SS11

Enquiry from: Barrie T

Start Date: Immediate

full kitchen with 3.4 + 2.4 + 2.3 + 1.5 worktops

Post a similar request >

02 Oct

Kitchen | Fitting

Wickford - SS11

Enquiry from: Paul G

Start Date: Less than one month

Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required materials for your kitchen already: Yes Are you considering a desig...

Post a similar request >

29 Jul

Flooring | Wooden

Wickford - SS12

Enquiry from: Inigo R

Start Date: Immediate

Home Owner Call to Appoint

Post a similar request >

16 Jun

Interior work | Stud Walls

Romford - RM3

Enquiry from: Bridget O

Start Date: Immediate

2 stud walls to split the living room and one to seal of the kitchen

Post a similar request >

09 Jun

Carpentry

Romford - RM3

Enquiry from: Vis P

Start Date: Immediate

Looking to build under copboards under my stairway

Post a similar request >

01 Jun

Garden | Sheds

Hornchurch - RM12

Enquiry from: Devi C

Start Date: Immediate

Install a plastic shed 6x8 Darwin ketter.

Post a similar request >

15 May

Garden | Decking

South Ockendon - RM15

Enquiry from: Keith M

Start Date: Immediate

I am looking to have a small deck installed, ideally made from composite materials for durability and low maintenance. The area I would like it fitted is approximately 5 feet by 5 feet. Please let me ...

Post a similar request >

09 Apr

Garden | Decking

Hornchurch - RM12

Enquiry from: Mark J

Start Date: Immediate

to remove old decking and get a new deck supplied and fitted, either wood or cheapest option, it needs to be seen to quote on

Post a similar request >

08 Apr

Garden | Sheds

Grays - RM16

Enquiry from: Peter T

Start Date: Immediate

Shed Assemble , Flat Pack Plastic Green Garden Shed.

Post a similar request >

03 Jun

Carpentry

Gravesend - DA11

Enquiry from: Ginette B

Start Date: Immediate

Skirting boards fitted in lounge, 4 walls: 119”, 120”, 144” and 142”

Post a similar request >

27 Mar

Garden | Sheds

South Ockendon - RM15

Enquiry from: Richard O

Start Date: Immediate

Shed roof repair Replacement of existing roof damaged. Damaged over head woods frames. Fence gate repairs.

Post a similar request >

26 Feb

Garden | Sheds

South Ockendon - RM15

Enquiry from: Richard O

Start Date: Immediate

Shed roof repair Replacement of existing roof damaged. Damaged over head woods frames. Fence gate repairs.

Post a similar request >

18 Jan

Carpentry

Hornchurch - RM11

Enquiry from: Gary H

Start Date: Immediate

door & frame fitted between kitchen/living room supplied & fitted possible brick & plaster work involved too are you the property owner: owner of the property property type: semi detached what type of...

Post a similar request >

13 Sep

Carpentry

Upminster - RM14

Enquiry from: Laurence B

Start Date: Less than one month

11 lincoln doors/hinges/handles - old doors removed. 6 glazed are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/do...

Post a similar request >

02 Sep

Garden | Sheds

Romford - RM3

Enquiry from: Adewole A

Start Date: Immediate

new fence installation and artificial garden. are you the property owner: owner property type: terrace do you have a: small garden garden type: back garden work required: lawn/turfing, fencing/walls, ...

Post a similar request >

30 Aug

Garden | Decking

Gravesend - DA11

Enquiry from: Ruggero P

Start Date: Immediate

good morning, we'd like to receive a quote to re-do the rear garden decking and an advice if it's possible to salvage it by fixing the joists and refresh the look, or re-build it from scratch. we loo...

Post a similar request >

28 Aug

Carpentry

Romford - RM2

Enquiry from: Collins E

Start Date: Immediate

3 bedroom doors, 2 toilet doors 2 hallway doors and 1 external before from front porch are you the property owner: owner of the property property type: semi detached what type of job are you looking t...

Post a similar request >

20 Jul

Garden | Decking

Grays - RM16

Enquiry from: Dean R

Start Date: Immediate

repalce patio slabs with decking? are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint

Post a similar request >

18 Jul

Flooring | Wooden

Gravesend - DA11

Enquiry from: Adaobi N

Start Date: Immediate

I need my one bedroom fitted with wood flooring just as the rest of the house. Flooring was taken out for some work , but I could not re-fit them in.

Post a similar request >

20 Jun

Garden | Decking

Upminster - RM14

Enquiry from: Aman D

Start Date: Immediate

decking repairs - a few boards to be replaced. we already have the replacement boards. splintered decking to be made safe and sanded down. are you the property owner: owner of the property property t...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Wickford is:

£1,018

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Wickford £1,238-£3,748
Carpenters and joiners in Wickford £375-£575
Plasterboard dry lining in Wickford £638-£978
Wood flooring in Wickford £750-£1,150
Wooden decking in Wickford £1,125-£1,725
Garden shed in Wickford £450-£690
Wooden window repair in Wickford £320-£480

Related Carpenter searches in Wickford

Carpenter FAQs

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Wickford.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Wickford?

View our open Carpenter jobs near you

Join today
View Shortlist