Find a Carpenter you can trust in Moelfre.

Choose from 25 Carpenters, all rated by people like you.

Over 20 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Orchard Landscapes

3 review(s)
Offers services in MOELFRE
Hi, I’m Lewis from Orchard landscapes we operate in all driveway and patio needs we also do fencing turfing and Astroturf ...

Elizabeth Hope

0 review(s)
Offers services in MOELFRE
Elizabeth Hope off a full turnkey solution for Masterclass Kitchens & Bathrooms to Love covering Manchester & Greater Manc...

Trafford

0 review(s)
Offers services in MOELFRE
If you’re looking for high-quality patios and driveways in manchester, and the surrounding areas , look no further than Tr...

Sashrite restorations

0 review(s)
Offers services in MOELFRE
Welcome to Sashrite Your Local Specialists in Sash Window Repair, Replacement, Refurbishment and Restoration Welcome...

Recent Carpenter Enquiries

09 Feb

Carpentry

Moelfre - LL72

Enquiry from: Sara R

Start Date: Immediate

a refurbishment of a staircase which opens onto a open plan second floor - there is no guard overlooking the stairwell / landing area

Post a similar request >

16 Apr

Carpentry

Amlwch - LL68

Enquiry from: Carol H

Start Date: Immediate

A renovation to a stairecase, wooden treads and wood and metal spindles

Post a similar request >

31 Aug

Garden | Sheds

Llanfairpwllgwyngyll - LL61

Enquiry from: Kathleen F

Start Date: Immediate

customer in llanfairpwllgwyngyll areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via telephone and sms at 31/08/2022 08:46.please ca...

Post a similar request >

11 Nov

Garden | Sheds

Dulas - LL70

Enquiry from: Pam W

Start Date: Immediate

wooden pent shed 6x6 no windows required - front opening doors with latch for padlock needs floor but will stand on hard surface will need delivered and installed as small, single woman with no idea o...

Post a similar request >

12 May

Garden | Sheds

Holyhead - LL65

Enquiry from: Geoff T

Start Date: Immediate

hi looking for a 8 x 6 t and g .pressure treated .pent shed poss 19mm and g are you the property owner: owner of the property what level of service are you looking for: supply please call to appoint w...

Post a similar request >

16 Sep

Carpentry

Llanfairpwllgwyngyll - LL61

Enquiry from: Bryn J

Start Date: Less than one month

Fitting sliding doors floor to ceiling and one end unit Time scale: Less than one month Please call to appoint

Post a similar request >

11 Sep

Garden | Sheds

Cemaes Bay - LL67

Enquiry from: DAVE W

Start Date: Immediate

HEN SHED 6FT X 4FT

Post a similar request >

06 Oct

Carpentry

Rhosneigr - LL64

Enquiry from: Amanda L

Start Date: 1 to 3 months

Take down cladding and replace kitchen ceiling Time scale: 1-3 months Please call to appoint Please call to appoint

Post a similar request >

11 Apr

Carpentry

Holyhead - LL65

Enquiry from: Karen M

Start Date: 1 to 3 months

we have a very large sliding door wardrobe and we need to take about 4" off of the depth cab you help? thank you

Post a similar request >

26 Oct

Carpentry

Holyhead - LL65

Enquiry from: John R

Start Date: Immediate

Large sliding top hung barn door which is not sliding. It sticks and feels very heavy. Photos of the problem door available. Door is about 3 metres high and 5 metres wide. I need a "no obligation"...

Post a similar request >

30 Aug

Kitchen | Fitting

Ty Croes - LL63

Enquiry from: Keith S

Start Date: Immediate

Work surface cuts

Post a similar request >

05 Apr

Garden | Decking

Holyhead - LL65

Enquiry from: Ian B

Start Date: 3+ months

I require decking Unfortunately I am only at the site on the odd weekend at the moment My next visit there is on Saturday 16th April You can contact ne any day after 1.00p.m. Are you the prope...

Post a similar request >

11 Jan

Flooring | Wooden

Holyhead - LL65

Enquiry from: Richard O

Start Date: Immediate

Re~laying of flood damaged engineered mid oak flooring. Work includes appropriate underlay for concrete floor. Old flooring has been removed and disposed of.

Post a similar request >

05 Oct

Kitchen | Fitting

Llangefni - LL77

Enquiry from: David J

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 120, Property type: House, Work description: Fit new kitchen

Post a similar request >

20 Jul

Garden | Sheds

Holyhead - LL65

Enquiry from: John N

Start Date: Immediate

To supply and install a Garden shed 10ft x 8 ft Constructed of T & G front entrance single door on 10ft side Window /s on same side as door. Solid floor. Pitch or Pentre roof Pre coated with Gr...

Post a similar request >

13 Apr

Garden | Decking

Cemaes Bay - LL67

Enquiry from: Margaret L

Start Date: Less than one month

Decking over concrete 7ft x 6ft approx Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Supply and deck Time scale: Less than one m...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Moelfre is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Moelfre £975-£2,495
Carpenters and joiners in Moelfre £375-£575
Plasterboard dry lining in Moelfre £638-£978
Wood flooring in Moelfre £750-£1,150
Wooden decking in Moelfre £1,125-£1,725
Garden shed in Moelfre £450-£690
Wooden window repair in Moelfre £320-£480

Related Carpenter searches in Moelfre

Carpenter FAQs

Where can I buy kitchen cabinets?

When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!

  • IKEA. One of the best place to buy affordable home goods is also a great place to check if you want to buy your kitchen cabinets. According to a research carried out by J.D Power which surveyed over 1500 customers within the past one year, IKEA’s cabinet system ( Sektion) ranked the highest in terms of the overall satisfaction.
  • KraftMaid. Another winner of the survey conducted by J.D Power as it took the second position when it comes to the overall satisfaction. Therefore, this store happens to be a good option based on the reviews. This store provides you with a wide variety of colour options to select from, so regardless of what your personal preference is, you’re guaranteed to find something worthwhile to install in your kitchen.
  • Stoffer Home. When you buy your kitchen cabinet from an interior designer, there’s a better chance for suitability. Stoffer home offers top quality cabinets which can be manufactured in four various wood finishes and twelve varying paint colours which are all carefully curated.
Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Moelfre.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Moelfre?

View our open Carpenter jobs near you

Join today
View Shortlist