Find a Carpenter you can trust in Penmaenmawr.

Choose from 25 Carpenters, all rated by people like you.

Over 55 reviews & an average rating of 4.1/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Abacus Restoration

38 review(s)
Offers services in PENMAENMAWR
With over 25 years of experience, Abacus Restoration specialises in the repair, restoration and ongoing maintenance of uPV...
Reliable company really hard working man my hand is never clean and I don’t have time for myself. I am business manager of...

Elizabeth Hope

0 review(s)
Offers services in PENMAENMAWR
Elizabeth Hope off a full turnkey solution for Masterclass Kitchens & Bathrooms to Love covering Manchester & Greater Manc...

Trafford

0 review(s)
Offers services in PENMAENMAWR
If you’re looking for high-quality patios and driveways in manchester, and the surrounding areas , look no further than Tr...

Sashrite restorations

0 review(s)
Offers services in PENMAENMAWR
Welcome to Sashrite Your Local Specialists in Sash Window Repair, Replacement, Refurbishment and Restoration Welcome...

Recent Carpenter Enquiries

26 Mar

Carpentry

Penmaenmawr - LL34

Enquiry from: Sadie R

Start Date: Immediate

Quote for loft conversion and false wall

Post a similar request >

13 Mar

Carpentry

Penmaenmawr - LL34

Enquiry from: Susanne D

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Hello, I've had new carpet fitted in my breakfast room and now my solid timber door doesn't fit. I'll need someone to resize it at the bottom to enable putting it back in. Is this a service you co...

Post a similar request >

15 Sep

Garden | Sheds

Penmaenmawr - LL34

Enquiry from: Carol G

Start Date: Immediate

customer made an enquiry for garden shed and confirmed on the quotatis site they would like quotes from a carpenter.ms lives in the penmaenmawr area and would like a call to discuss options.see below ...

Post a similar request >

18 Aug

Garden | Sheds

Pentraeth - LL75

Enquiry from: Linda B

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Hedge trimming. Approx 17m long and 2m high needs 30cm taken off the top. Part of hedge is very close to a shed and is higher than 2m

Post a similar request >

17 Aug

Garden | Sheds

Llandudno - LL30

Enquiry from: Aishah M

Start Date: Immediate

4x8 tongue and groove pent shed, window less and arrives in panels

Post a similar request >

17 May

Carpentry

Beaumaris - LL58

Enquiry from: Cindy S

Start Date: Immediate

Small corner bookcase, separate wall built in tv unit with shelving

Post a similar request >

01 Mar

Carpentry

Bangor - LL57

Enquiry from: Beth H

Start Date: Immediate

Looking for window seats and a big around a window book case. Possibly a storage unit come upstairs bannister

Post a similar request >

09 Feb

Carpentry

Moelfre - LL72

Enquiry from: Sara R

Start Date: Immediate

a refurbishment of a staircase which opens onto a open plan second floor - there is no guard overlooking the stairwell / landing area

Post a similar request >

29 Dec

Carpentry

Y Felinheli - LL56

Enquiry from: Iwan P

Start Date: Immediate

Refurbish kitchen and floor

Post a similar request >

23 Apr

Garden | Decking

Llandudno - LL30

Enquiry from: Carlos S

Start Date: Immediate

replace 10 square meters of decking for a new one are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint

Post a similar request >

07 Mar

Kitchen | Fitting

Bangor - LL57

Enquiry from: Phillip H

Start Date: Immediate

3 kitchen worktops fitting with cut out for hob and sink. u shaped kitchen size 2 m x 2.6 x 2.4 is worktop size. are you the property owner: owner of the property what level of service do you require:...

Post a similar request >

01 Aug

Flooring | Wooden

Conwy - LL32

Enquiry from: Wendy C

Start Date: Immediate

wooden flooring for living room and hallway to front door are you the property owner: tenant (with permission) how many rooms are you looking to update with wood flooring: 1-2 rooms what level of ser...

Post a similar request >

30 Jul

Garden | Decking

Conwy - LL32

Enquiry from: Mike G

Start Date: Immediate

small sloping garden to rear of townhouse. require decked area (approx 3.5 x 3 mtr) to provide level area at the end of the garden, bounded by stone wall & wooden fence. are you the property owner: ow...

Post a similar request >

07 Apr

Garden | Decking

Llandudno - LL30

Enquiry from: Janet B

Start Date: Immediate

repair of decking and stairs are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appoint

Post a similar request >

12 Sep

Garden | Sheds

Beaumaris - LL58

Enquiry from: Valerie H

Start Date: Immediate

Perhaps a replacement potting shed 7 x 7 I like the look of the dark shed in your advert with windows to side and end by the door. Are you the property owner: Owner of the property Do you have a: L...

Post a similar request >

13 Aug

Kitchen | Fitting

Llandudno - LL30

Enquiry from: Jean M

Start Date: Immediate

Home Owner Call to Appoint

Post a similar request >

01 Mar

Kitchen | Fitting

Llandudno - LL30

Enquiry from: CLAIRE R

Start Date: 1 to 3 months

REMOVAL OF EXISTING KITCHEN AND REPLACEMENT Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required materials for your kitc...

Post a similar request >

06 Feb

Garden | Decking

Tyn-y-gongl - LL74

Enquiry from: Lindsey G

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: We would like a quote for work on 3 different areas- patio area x 2 with deckin...

Post a similar request >

15 Apr

Carpentry

Conwy - LL32

Enquiry from: E

Start Date: Immediate

3300w x2200h sliding robes

Post a similar request >

31 Mar

Flooring | Wooden

Bangor - LL57

Enquiry from: Susan H

Start Date: Immediate

I would like wood flooring laid in the hallway please

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Penmaenmawr is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Penmaenmawr £975-£2,495
Carpenters and joiners in Penmaenmawr £375-£575
Plasterboard dry lining in Penmaenmawr £638-£978
Wood flooring in Penmaenmawr £750-£1,150
Wooden decking in Penmaenmawr £1,125-£1,725
Garden shed in Penmaenmawr £450-£690
Wooden window repair in Penmaenmawr £320-£480

Related Carpenter searches in Penmaenmawr

Carpenter FAQs

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Penmaenmawr.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Penmaenmawr?

View our open Carpenter jobs near you

Join today
View Shortlist