Garden | Sheds
Borth, Bow Street, Talybont - SY24
Enquiry from: John B
Start Date: Immediate
looking for a wooden shed 4x8
-->
Over 35 reviews & an average rating of 4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Borth, Bow Street, Talybont - SY24
Enquiry from: John B
Start Date: Immediate
looking for a wooden shed 4x8
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Richard D
Start Date: Immediate
I require a housing for a diesel generator. The base ( concrete) is already down and the shed or housing will be built off of sleepers surrounding the base . So basically it will be a pent style shed...
Tywyn - LL36
Enquiry from: Tracey G
Start Date: Immediate
customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...
Llwyngwril - LL37
Enquiry from: Ama A
Start Date: Immediate
Hi... I need edible low to no maintenance fruit veg herbs in my courtyard garden that's very small (raspberries chillies rosemary etc) .even love idea of few cactus... then I have some flowerbeds outs...
Machynlleth - SY20
Enquiry from: Mary P
Start Date: Immediate
customer made an online enquiry for garden maintenance and confirmed on online they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the pr...
Machynlleth - SY20
Enquiry from: Tim L
Start Date: Immediate
high quality kitchen units and tiling are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your kitchen a...
Machynlleth - SY20
Enquiry from: Kendrick W
Start Date: Immediate
price for window less flat roof shed or workshop. 8x8 delivery to *** cemmaes near machynllethf are you the property owner: owner of the property what level of service are you looking for: supply what...
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Ann D
Start Date: Immediate
i have a desk that needs to be assembled time scale: immediate please call to appoint
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Caroline H
Start Date: Immediate
12by 12 field shelter with overhang. No floor
Machynlleth - SY20
Enquiry from: Pat A
Start Date: Immediate
Shiplap 6x4 garden shed
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Peter B
Start Date: Immediate
We have a shed on a base 313cm x 179cm that is falling to bits! We want a quote for its removal and replacement with one the same size and similar design. At the moment we are not present at the prope...
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: David W
Start Date: Less than one month
Renew two windows in a concrete garage.
Machynlleth - SY20
Enquiry from: Barbara W
Start Date: Less than one month
Fit 7internal oak doors Time scale: Less than one month Please call to appoint Please call to appoint
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Traudl B
Start Date: Immediate
Taking up the old floor in one of the upstairs bedrooms and relaying a wooden floor i.e. fixation of the new floor on joists.
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Lesley C
Start Date: 1 to 3 months
Full garden refurb to remove most of grass replace with membrane and gravel. Make beds and edging and also make patio . Are you the property owner: Owner of the property Property Type: Detached Gard...
Machynlleth - SY20
Enquiry from: Lynda D
Start Date: Immediate
I would like a workshop/log cabin which is useable all year round ideally I should be able to insulate it and have a small outside workspace
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Shirley N
Start Date: Immediate
16ft x 10ft shed, end door, windows on 1 long side and windows on 10ft end.
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Barry S
Start Date: Immediate
Black granite slab 15mm to 20 mm thick 900 x 700 mm Are you the property owner: Owner of the property
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Catrin P
Start Date: 1 to 3 months
decking to be fitted at back of house Are you the property owner: Tenant (with permission) Property Type: Terrace What level of service do you require: Deck only Time scale: 1-3 months
Machynlleth - SY20
Enquiry from: Richard H
Start Date: Less than one month
Are you the property owner: Owner of the property Property Type: Detached Other Forms: 10085 Agreed to recieve quotes for selected products: Yes
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Talybont | £975-£2,495 |
Carpenters and joiners in Talybont | £375-£575 |
Plasterboard dry lining in Talybont | £638-£978 |
Wood flooring in Talybont | £750-£1,150 |
Wooden decking in Talybont | £663-£1,863 |
Garden shed in Talybont | £325-£795 |
Wooden window repair in Talybont | £320-£480 |
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
How To Dot And Dab A Plasterboard
If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!
• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.
• Ensure the wall’s height is 15mm more than the plasterboard
• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.
• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.
• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.
• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.
• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.
Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Talybont.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today