Find a Carpenter you can trust in New Milton.

Choose from 30 Carpenters, all rated by people like you.

Over 74 reviews & an average rating of 4.1/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Rightway Environmental

0 review(s)
Offers services in NEW MILTON
Rightway Environmental are an Asbestos removal company that have been independently licensed by the Health and Safety Exec...
Verified Pro
Top 2 Bottom Plastering & Renovations is a Hampshire-based plastering company delivering high-quality workmanship from sta...
Over 10 Reviews

Everlast Paving

16 review(s)
Offers services in NEW MILTON
My business is a family run company I love to make my customers happy with my work I have plenty of experience my main wor...

PR Property

5 review(s)
Offers services in NEW MILTON
I am a self motivated individual that enjoys making homes looking special, I pride myself on completing a professional fi...

Amazing Landscaping

1 review(s)
Offers services in NEW MILTON
No matter the size of your project, Amazing Fences and Landscaping guarantees precision to meet your specifications. We’re...
All kids of trees expertly felled,topped,pruned,and trimmed,all rubbish removed. Graveling,turfing,fencing,patios,pressur...

Recent Carpenter Enquiries

25 Oct

Flooring | Wooden

New Milton - BH25

Enquiry from: Jennifer N

Start Date: Immediate

We have just had wood flooring laid included in an insurance claim which has turned out to be far inferior to what we previously had. We have complained and they have asked for us to get a quote for r...

Post a similar request >

19 May

Carpentry

New Milton - BH25

Enquiry from: Christopher M

Start Date: Immediate

Carpenter to help fit worktops in New Kitchen, fit doors, other carpentry.

Post a similar request >

14 Nov

Carpentry

New Milton - BH25

Enquiry from: Steve J

Start Date: Less than one month

supply and fit an interior door plain flat are you the property owner: tenant (with permission) property type: terrace time scale: less than one month what level of service do you require: supplied a...

Post a similar request >

14 Dec

Garden | Sheds

New Milton - BH25

Enquiry from: Peter W

Start Date: Immediate

grateful for a quote on behalf of my parents who are moving house. fair bit - about one skip full - of general garden rubbish including remains of small demolished shed at bottom end of large garden. ...

Post a similar request >

11 Oct

Garden | Sheds

New Milton - BH25

Enquiry from: John N

Start Date: Immediate

constuction of 7x5 wooden shed are you the property owner: owner of the property what level of service are you looking for: install do you have a: small garden please call to appoint

Post a similar request >

25 Jul

Garden | Decking

New Milton - BH25

Enquiry from: Andrew S

Start Date: Less than one month

Decking needs some repair and then painting/staining and fence painting Are you the property owner: Owner of the property Property Type: Terrace What level of service do you require: Supply and deck T...

Post a similar request >

29 Feb

Kitchen | Fitting

New Milton - BH25

Enquiry from: S

Start Date: Immediate

Fitting new wiks kitchen

Post a similar request >

08 Jul

Kitchen | Fitting

Poole - BH12

Enquiry from: Mark M

Start Date: Immediate

have 1/2 integrated fridge freezers to replace , take out old ones and replace with two new ones - fridge freezer siemens will be provided are you the property owner: owner of the property what level ...

Post a similar request >

25 Mar

Interior work | Stud Walls

Poole - BH14

Enquiry from: Stuart B

Start Date: Immediate

Kitchen had water ingress on 1 wall only.Now dry.Need to dry line 1 wall only approx 3.5 metre long and normal ceiling height around 2.3 metre.Due to lack of space can not use normal air gap from the ...

Post a similar request >

15 Jan

Windows | Wooden | Repair

Bournemouth - BH6

Enquiry from: Joe T

Start Date: Immediate

We have 4 bay windows with original wooden frames that have been retrofitted to accomodate double glazed units. the exterior of the windows have UPVC trim on the. I beleive the wood is in good conditi...

Post a similar request >

13 May

Carpentry

Bournemouth - BH6

Enquiry from: Ben C

Start Date: Immediate

Please send an email address so that we can email the drawings to you

Post a similar request >

07 Apr

Carpentry

Bournemouth - BH1

Enquiry from: Martin W

Start Date: 1 to 3 months

i manage a block of 54 flats (bh1) we need to change 54 letter boxes and add a third hinge to 48 emergency fire doors to be compliant with new 2023 fire rules. i am after quotes for some/all of this ...

Post a similar request >

20 Jan

Interior work | Stud Walls

Bournemouth - BH3

Enquiry from: Grant G

Start Date: Immediate

internal timber stud wall with door and plater board. are you the property owner: owner of the property property type: detached how many different rooms are you looking to have wall work on: 1-2 rooms...

Post a similar request >

03 Aug

Carpentry

Poole - BH12

Enquiry from: Martin T

Start Date: 1 to 3 months

remove two existing internal doors and fit replacements, one of which will be glazed are you the property owner: owner of the property property type: semi detached what level of service do you require...

Post a similar request >

06 Jul

Carpentry

Poole - BH14

Enquiry from: Jenny M

Start Date: 1 to 3 months

need the entrance door to my flat changing to open the other way. have to use the existing fire door are you the property owner: owner of the property property type: other what type of job are you loo...

Post a similar request >

14 Jun

Garden | Decking

Poole - BH12

Enquiry from: Victoria K

Start Date: Immediate

miss requested quotes for wooden decking from a carpenter around poole. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is...

Post a similar request >

30 Mar

Garden | Decking

Totland Bay - PO39

Enquiry from: Jane L

Start Date: Immediate

raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...

Post a similar request >

24 Mar

Garden | Decking

Totland Bay - PO39

Enquiry from: Jane L

Start Date: Immediate

raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...

Post a similar request >

26 May

Garden | Sheds

Bournemouth - BH6

Enquiry from: Frances S

Start Date: Immediate

erection of shed, 7 x 5 on existing site. present building rotten. have ordered a new one, arriving on 7 june. are you the property owner: owner of the property what level of service are you looking f...

Post a similar request >

07 May

Kitchen | Fitting

Bournemouth - BH6

Enquiry from: Marion H

Start Date: Immediate

new kitchen worktops kitchen cupboard doors,under stairs redone are you the property owner: owner of the property what level of service do you require: install only do you have all of the required mat...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in New Milton is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in New Milton £975-£2,495
Carpenters and joiners in New Milton £375-£575
Plasterboard dry lining in New Milton £638-£978
Wood flooring in New Milton £750-£1,150
Wooden decking in New Milton £1,125-£1,725
Garden shed in New Milton £450-£690
Wooden window repair in New Milton £320-£480

Related Carpenter searches in New Milton

Carpenter FAQs

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in New Milton.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in New Milton?

View our open Carpenter jobs near you

Join today
View Shortlist