Carpentry
Waterlooville - PO7
Enquiry from: Jenny W
Start Date: Immediate
New bathroom door to be fitted
Over 174 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Waterlooville - PO7
Enquiry from: Jenny W
Start Date: Immediate
New bathroom door to be fitted
Waterlooville - PO7
Enquiry from: Gary P
Start Date: Immediate
A 12' x12' decking area made from timber
Ryde - PO33
Enquiry from: Jackie T
Start Date: Immediate
Replace closed in staircase with spindles
Gosport - PO12
Enquiry from: Stephen L
Start Date: Immediate
Wood Flooring rotted because of water ingress over years. Needs replacing. Approx. 3 to 4 Sq yards
Southsea - PO5
Enquiry from: Rachel M
Start Date: Immediate
A few inches shaved off bottom of new door. 2 pieces of skirting cut. Door closer mounted. Small job but would really help me out
Southampton - SO31
Enquiry from: Stuart S
Start Date: Immediate
Quote for decking replacement at netley sailing club. on site visit preferred
Rowland's Castle - PO9
Enquiry from: Luke M
Start Date: Immediate
Good evening, i’m writing on behalf of my mother.. she has a flat pack shed and she needs someone to build it basically
Southampton - SO31
Enquiry from: Stuart S
Start Date: Immediate
I am seeking a quotation for the full supply and installation of a replacement raised decking structure at netley sailing club (so31). the existing timber decking has rotten support posts and needs t
Rowland's Castle - PO9
Enquiry from: Peter Y
Start Date: Immediate
Install a concrete ramp from newly fitted disabled fire door, repair and/or replace 2 other concrete ramps. Build/install 2 x wooden steps that go up banks
Southsea - PO4
Enquiry from: Rosalie W
Start Date: Immediate
Repair and or replace decking area around edges where wood has disintegrated. repair and or replace a new step and make good a garden gate. all wood
Fareham - PO16
Enquiry from: Mark M
Start Date: Immediate
Replacement decking which is on the top of a store downstairs but outside our back door. the house is on a slope with stairs down from the backdoor decking area. the stairs were replaced 2 years ago
Emsworth - PO10
Enquiry from: Carol S
Start Date: Immediate
Kitchen cupboard under sink 600 & 300 needs replacing, sink replacing and full worktop. I have the sink, but need worktop and cupboard's
Portsmouth - PO6
Enquiry from: Joseph M
Start Date: Immediate
Decking steps are becoming lose
Newport - PO30
Enquiry from: Susan H
Start Date: Immediate
All kitchen cupboard doors realigned. replace/repair bottom kitchen panel (the panel from the cupboards to the floor) to allow easy access to tumble dryer filter
Waterlooville - PO8
Enquiry from: Helena L
Start Date: Immediate
I need my decking re building with new steps, i do have this in place, but want something different
Fareham - PO16
Enquiry from: Peter J
Start Date: 1 to 3 months
Sash windows inspection for rot and repaired as appropriate
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Portsmouth | £975-£2,495 |
| Carpenters and joiners in Portsmouth | £375-£575 |
| Plasterboard dry lining in Portsmouth | £638-£978 |
| Wood flooring in Portsmouth | £750-£1,150 |
| Wooden decking in Portsmouth | £1,125-£1,725 |
| Garden shed in Portsmouth | £450-£690 |
| Wooden window repair in Portsmouth | £320-£480 |
Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
How To Fit Plasterboard
If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.
To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.
Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.
• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit
• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.
• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.
• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Portsmouth.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today