Find a Carpenter you can trust in Bromyard.

Choose from 47 Carpenters, all rated by people like you.

Over 62 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Orchard Landscapes

3 review(s)
Offers services in BROMYARD
Hi, I’m Lewis from Orchard landscapes we operate in all driveway and patio needs we also do fencing turfing and Astroturf ...
Verified Pro

Stn trees and landscaping

0 review(s)
Offers services in BROMYARD
As a friendly team of highly motivated landscapers we strive for customer satisfaction from the very beginning. We specia...
Verified Pro

J&D Home Improvements

1 review(s)
Offers services in BROMYARD
Hi at j&D home improvements we take pride in our work to make satisfied customers All work in fully guaranteed Ful...
Verified Pro

Wellkeptfacilites

0 review(s)
Offers services in BROMYARD
WellKept Facilities is a professional facilities maintenance and property services provider delivering reliable, compliant...
Verified Pro
Betterview Landscaping & Patios have been providing driveways, lock paving, tarmac and hard landscaping services acros...

Recent Carpenter Enquiries

06 Jul

Garden | Sheds

Bromyard - HR7

Enquiry from: Sarah H

Start Date: Immediate

Hello, I am moving to Bromyard in early September and am looking for a quote for a shed/workshop to be built in the garden, the measurements are 17ft x 8ft and needs to be tall enough for someone who ...

Post a similar request >

29 Jun

Garden | Decking

Bromyard - HR7

Enquiry from: Rara A

Start Date: Immediate

Would like area outside my front door done, there are stone slabs down which will need lifting off, then the loot with need to be levelled for the decking to go on - Estimated Service Date: 12/08/2015...

Post a similar request >

03 May

Garden | Sheds

Malvern - WR13

Enquiry from: Tony S

Start Date: Immediate

Looking for a 6ft x 6ft garden shed for storing tools and garden equipment. I would also like it to be erected. We are having the whole garden paved and this should be completed by end of may 2026

Post a similar request >

26 Mar

Garden | Decking

Malvern - WR13

Enquiry from: Dian M

Start Date: Immediate

Replacement of long, narrow (5 metre by 1?)decking which is rotting …

Post a similar request >

07 Oct

Garden | Sheds

Malvern - WR14

Enquiry from: Tessa M

Start Date: Immediate

We have an octagonal 8x6 summer house from a previous house that needs erecting. There is a flat base and the floor of the summerhouse is in situ.

Post a similar request >

03 Oct

Garden | Sheds

Leominster - HR6

Enquiry from: Michael N

Start Date: Immediate

Remove old shed 8x 6 and erect a new modular one to be supplied by me

Post a similar request >

20 Jun

Garden | Decking

Leominster - HR6

Enquiry from: Mike C

Start Date: Immediate

we have a static caravan on the pearl lake site with decking on two sides. i have had some exorbitant (in my opinion) quotes for replacing the wood with composite and so am currently looking at replac...

Post a similar request >

14 Apr

Garden | Sheds

Worcester - WR4

Enquiry from: Martin B

Start Date: Immediate

new shed in garden

Post a similar request >

14 Mar

Carpentry

Worcester - WR5

Enquiry from: Bernard W

Start Date: Immediate

Support strutts in the loft

Post a similar request >

12 Aug

Windows | Wooden | Repair

Worcester - WR6

Enquiry from: Mike S

Start Date: Immediate

Wooden window repairs - some need sills replacing. Old house.

Post a similar request >

17 Jul

Carpentry

Malvern - WR14

Enquiry from: Claire C

Start Date: Immediate

We would like the window replacing but in the style of the traditional windows of our home. The new window does not need to open. Please let me know if you would be able to quote us for the job. ...

Post a similar request >

16 Jul

Carpentry

Malvern - WR14

Enquiry from: Andrew C

Start Date: Immediate

Replace timber barge boards on eves

Post a similar request >

12 Jul

Carpentry

Malvern - WR14

Enquiry from: Elizabeth D

Start Date: Immediate

Quote for replacement outside door and several window frames

Post a similar request >

20 Jun

Carpentry

Malvern - WR14

Enquiry from: Antonia H

Start Date: Immediate

Please could you advise if you would be able to trim 7 internal doors following carpet fitting to my new home? Each needs a few mm off the bottom of the door. If so please could you advise cost. If no...

Post a similar request >

19 Jun

Carpentry

Worcester - WR6

Enquiry from: Rob K

Start Date: Immediate

8 tulipwood rebated door frames fitted into 2 masonry and 6 timber apertures 8 solidwood window sills fitted material is ready on site. what level of service do you require: supplied and fitted proper...

Post a similar request >

03 Jun

Carpentry

Malvern - WR14

Enquiry from: David C

Start Date: Immediate

We need to replace some wooden garage doors measuring 2170w by 2220h to outside of the frame.

Post a similar request >

31 May

Carpentry

Malvern - WR13

Enquiry from: Chris M

Start Date: Immediate

2 oak cottage doors fitted

Post a similar request >

16 Apr

Carpentry

Worcester - WR5

Enquiry from: Shaun M

Start Date: Immediate

Hi. I need a door fitting to an upstairs attick bedroom. I have an old door and you can cut this to size. It’s an irregular shape door frame as it’s an attick room entrance. Can you help? We�...

Post a similar request >

15 Apr

Carpentry

Worcester - WR1

Enquiry from: Chris W

Start Date: Immediate

Hi There, I’m looking for a piece of oak minimum length 187cm x 18cm minimum width x 30mm thickness approx. I’m trying to obtain a piece that is light in colour. Do you have anything in stock that...

Post a similar request >

11 Apr

Carpentry

Malvern - WR13

Enquiry from: Jane B

Start Date: Immediate

We had a visit *** April and haven’t received a quote yet so thought I would get in touch to make sure you have my correct email. Many thanks 😊

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Bromyard is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Bromyard £975-£2,495
Carpenters and joiners in Bromyard £375-£575
Plasterboard dry lining in Bromyard £638-£978
Wood flooring in Bromyard £750-£1,150
Wooden decking in Bromyard £1,125-£1,725
Garden shed in Bromyard £450-£690
Wooden window repair in Bromyard £320-£480

Related Carpenter searches in Bromyard

Carpenter FAQs

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

What is engineered wood flooring?

What Is Engineered Wood Flooring?

Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.

Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.

The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:

• Its very easy and simple to install

• When compared to solid wood flooring, it’s more cost effective.

• It can be utilized alongside an under floor heating

• It can be loose laid, meaning it does not need to be fixed in position

• It is available in multiple varieties of wood and finishes

• It can be incorporated alongside an underlay including thermal barriers

• It can be utilized in areas with a fluctuating humidity and temperature.

• It is available in different kinds of thickness.

Click here to learn more about wood flooring.

Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Bromyard.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Bromyard?

View our open Carpenter jobs near you

Join today
View Shortlist