- How to build a shed base out of paving slabs
- Mix sand and cement together to make mortar or use a pre-mixed one
- Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
- Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
- Next lay slabs along the two adjacent outer edges, filling in the central area row by row
- Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
- Building a shed base from concrete
- Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
- Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
- Wet the sub-base using a watering can with a rose on the end
- Pour the concrete onto the framed base starting in one corner
- Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
- Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
- Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
- Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
- Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
- Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
- Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Find a Carpenter you can trust near you.
Choose from 4865 Carpenters, all rated by people like you.
Over 1883 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Enter your location to refine your search
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you




JM Fencing and Landscaping




First Choice



McFarlane Homes



AF bathroom and heating


JD Roofing




Thomas Roof Restoration
Find a local Carpenter you can trust...
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter is:
£1,416
Carpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting | £1,135-£3,714 |
Carpenters and joiners | £365-£3,216 |
Plasterboard dry lining | £315-£863 |
Wood flooring | £750-£1,150 |
Wooden decking | £750-£4,529 |
Garden shed | £528-£1,717 |
Wooden window repair | £190-£577 |
Carpenter service qualifications and accreditations
Carpenters qualifications and also certification's: Having the appropriate training and learning exactly how to do your profession is essential for any trade including Carpenters. View the profile of each Carpenter you are looking at to see what accreditation they hold and also what trade associations they belong to. Some trade associations that Carpenters might possibly be a member of include: HomePro, Federation of Master Builders, Guild of Master Craftsmen. Equally Carpenters might also have the following accreditations: BM TRADA, Chartered Institute of Building, City and Guilds.
Unlike electrical or gas work, carpentry is a different profession where no particular certification is legally required for a carpenter to possess. Generally speaking, the only thing you’ll need so as to practice the trade as well as carry out on site work is to demonstrate your competence as a carpenter. To do this, there’s a number of ways you can consider but one which clearly stands out is to complete a portfolio of work and also earn the NVQ Level 2 Carpentry qualification.
In order to obtain your NVQ Level 2 certification, there’s a need for you to actually learn the trade. You can do this through apprenticeship, working alongside an established carpenter and gradually learning the trade from them. However, it should be noted that it’ll take a couple of years to climb up the ladder from an apprentice to a fully-fledged carpenter. Therefore, if you want to start your new carpentry career sooner rather than later, you might want to consider enrolling on an accredited carpentry training course.
Insurance for Carpenters: Any individual who works in your house, including Carpenters, really should have valid public liability insurance, which safeguards you the house owner and also the Carpenter should unfortunately anything go wrong while they are doing the work. Planning permission for Carpenters Most of the tasks that a Carpenter will do for you will not require planning permission unless its a listed property. Definitely discuss with the Carpenter if planning permission would be needed for the job you are doing, they can suggest the steps that require to be taken.
Services offered by Carpenter
Generally, carpenters are skilled craftsmen who are trained to work in construction as well as cabinet making industry. When it comes to making things with wood, they’re able to fabricate all sorts of wood constructions; from minor projects like custom kitchens or ornate details on wood trim to major ones like carrying out the entire framework of buildings. With that in mind, let’s take a more in depth look at what carpenters does.
In general, carpenters carry out a wide array of unique job duties which depends on whether they work in rough carpentry or finished carpentry. What’s more? There are a number of areas in which carpenters can specialize in special types of wood products or engage in specialized carpentry processes.
For rough carpentry, this typically involves carpenters who work on large scale construction projects where they make use of blueprints to determine the amount as well as type of material required for a job. When they work, they may need to build sleds to haul timber via wooded areas and rough terrain where motorized vehicles cannot access. Finished carpentry, on the other hand, involves carpenters who are skilled in making cabinetry, furniture, models as well as instruments. They’re also able to make ornate, detailed as well as fine wood products for a number of different uses. They must be able to work efficiently on a small scale while also being detailed oriented.
There are a variety of tasks you can employ a Carpenter for, as well as some of one of the most typical jobs that Carpenter are asked to do consist of:
Carpenter FAQs
- Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
- Add a central step riser to stairs wider than 900mm to prevent them buckling
- Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
- Step treads (the actual step themselves)
- Step risers
- Coach screws
- Deck screws
- Saw
- Drill
- Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
- Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
- Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
- After drilling pilot holes, screw the treads into the risers at each end with deck screws.
- If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
- The shed doesn’t cover more than 50% of the garden
- It’s not in front of your house
- The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
- There’s no veranda or balcony
- The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
- The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
- If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
- If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
- If you own a piece of woodland, you must seek planning permission for any permanent structure
- In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
- In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
Considerations
If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.
General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.
Time
The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.
The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.
General Carpentry Costs in the UK:
• National Minimum Cost is £20
• National Maximum Cost is £25
• The national average is around £22
Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):
• Furniture Refinishing is around £17
• A Cabinet Repair is around £23
• Finish Carpentry will set you back a minimum of £30
• General Carpentry is around £20
• Fine Woodworking is about £20
Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
- Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
- Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
- Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
- Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
- Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
- Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in your area.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter?
View our open Carpenter jobs near you
Join todayRecent Carpenter Enquiries
Garden | Sheds
Aberystwyth, Llanon, Llanrhystud - SY23
Enquiry from: Richard D
Start Date: Immediate
I require a housing for a diesel generator. The base ( concrete) is already down and the shed or housing will be built off of sleepers surrounding the base . So basically it will be a pent style shed...
Garden | Sheds
Nottingham, Sutton-in-Ashfield - NG17
Enquiry from: David W
Start Date: Immediate
Slabs sm tree bushes plants empty plastic pond sm walls removed plus old flat shed put in skip so garden cleaned for a lawn & patio
Carpentry
Lanark - ML11
Enquiry from: Andrea M
Start Date: Immediate
A joiner to fix, & supply old & new internal doors, please
Interior work | Stud Walls
Hebburn - NE31
Enquiry from: Peter L
Start Date: Immediate
We need a stud wall erected within an office unit with a door included, the approx dimensions are 5m long by 3m high, please provide a quote for the above.
Garden | Decking
Bournemouth - BH11
Enquiry from: JIM M
Start Date: Immediate
take up old decking boards which some are rotting and unsafe and replace with new decking which has been purchased are you the property owner: tenant (with permission) property type: semi detached wha...
Garden | Decking
Tredegar - NP22
Enquiry from: Lynn D
Start Date: Immediate
refit old decking old decking is already removed and disposed of this job is labour only as all materials are supplied by us
Carpentry
Sandhurst - GU47
Enquiry from: Michael R
Start Date: Immediate
Door frame and door fitting between Bedroom and en-suite
Garden | Sheds
Clacton-on-Sea - CO16
Enquiry from: Kevin M
Start Date: Immediate
i am looking to have two shed bases laid in my garden. one for my shed, which will be approximately 3m x 5m. the second base is for my wife's green house, which will be 6' x 10'. as of yet i have not ...
Garden | Decking
Wallsend - NE28
Enquiry from: Linda S
Start Date: Immediate
Remove old decking and replace with new decking
Garden | Sheds
Manchester - M26
Enquiry from: Tony M
Start Date: Immediate
Assemble 8x6 metal garden shed
Windows | Wooden | Repair
Leeds - LS17
Enquiry from: Keeley T
Start Date: Immediate
I have wooden windows in my cottage with some signs of rot. I would like to repair, repaint for this winter and see whether i can get a couple more years from them without full replacement of the wind...
Garden | Sheds
Lowestoft - NR32
Enquiry from: Robert T
Start Date: Immediate
Installation of 13 x 9 (4.06m x 2.91m) Mercia Corner Summerhouse with Side Shed Please respond by email only. Please quote price, typical installation time and earliest date available
Garden | Sheds
Hinckley - LE10
Enquiry from: Julie S
Start Date: Immediate
remove old shed and replace with new are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: install, removal of old please call...
Garden | Decking
Romford - RM1
Enquiry from: Khemraj H
Start Date: Immediate
build decking 3m x 6m flat ground using adjustable risers
Garden | Decking
Leigh-on-Sea - SS9
Enquiry from: Kellie H
Start Date: Immediate
removal of current decking and replacement.. needs levelling out are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please ...
Garden | Decking
Dalton-in-Furness - LA15
Enquiry from: John C
Start Date: Immediate
old decking needs replacing please give a quote asap
Garden | Sheds
Ashford - TN27
Enquiry from: LYNNE P
Start Date: Immediate
We already have concrete base done and are looking for some one to construct / assemble a plastic shed as most companies selling them won’t assemble as I am recovering from a recent stroke we can’...
Kitchen | Fitting
Eastleigh - SO50
Enquiry from: Graham S
Start Date: Immediate
we need to replace a kitchen worktop, we already have the worktop as it was an 'over-order' when the kitchen was originally fitted. the worktop is not long enough to fit along the entire length of the...
Garden | Decking
Fareham - PO16
Enquiry from: Mark M
Start Date: Immediate
replacement decking which is on the top of a store downstairs but outside our back door. the house is on a slope with stairs down from the backdoor decking area. the stairs were replaced 2 years ago....
Carpentry
Glasgow - G33
Enquiry from: Evelyn S
Start Date: Less than one month


i replaced my fridge freezer and now have a space and would like a pull out larder unit. area requires to be measured so materials can be ordered. are you the property owner: owner of the property pr...
Carpenter in your region
- Carpenter Scotland
- Carpenter Northern Ireland
- Carpenter North East
- Carpenter North West
- Carpenter East Midlands
- Carpenter West Midlands
- Carpenter Wales
- Carpenter South West
- Carpenter South East
- Carpenter Greater London
- Carpenter Isle of Man
- Carpenter Channel Islands
- Carpenter Yorkshire & Humberside
- Carpenter East Anglia