Find a Carpenter you can trust in Muir Of Ord.

Choose from 3 Carpenters, all rated by people like you.

Over 0 reviews & an average rating of 0/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Mills Agri Services

0 review(s)
Offers services in MUIR OF ORD
Fencing is our bread and butter whether it’s security fencing or garden timber all the way to livestock and deer we have a...

Floors2adoor

0 review(s)
Offers services in MUIR OF ORD
Hello I have 32 year experience working as a carpenter and joiner working all around the uk mainly specializing in hardwoo...

Recent Carpenter Enquiries

08 Oct

Garden | Decking

Muir of Ord - IV6

Enquiry from: Mike G

Start Date: Immediate

hardwood patio decking with glass balustrade approx 2.0m by 4.5m are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please...

Post a similar request >

16 Jul

Garden | Decking

Inverness - IV1

Enquiry from: Nicola S

Start Date: Immediate

composite decking outside patio doors estimate 8m x 3m

Post a similar request >

09 Apr

Garden | Decking

Inverness - IV3

Enquiry from: Alistair G

Start Date: Immediate

timber decking - needing several planks replaced as wood started to rot. Be interested in a quote to replace the whole deck with composite decking

Post a similar request >

05 Apr

Garden | Decking

Inverness - IV1

Enquiry from: Nicola S

Start Date: Immediate

Decking of a sloped grass area

Post a similar request >

24 Feb

Windows | Wooden | Repair

Avoch - IV9

Enquiry from: Andrew H

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

Hinges broken on two windows making them problematic to close properly. Both PVC windows. One in kitchen is a small upper window, size 30 by 66 cm. The other is in the bedroom and is a larger window -...

Post a similar request >

13 May

Garden | Sheds

Inverness - IV2

Enquiry from: Morag G

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...

Post a similar request >

21 Jul

Kitchen | Fitting

Dingwall - IV16

Enquiry from: Hugh M

Start Date: Immediate

Fit 19 units and 3 wall units plus worktops

Post a similar request >

30 May

Garden | Sheds

Dingwall - IV15

Enquiry from: Alana H

Start Date: Immediate

Shed disposal and removal. Its 20ft long, 12ft wide and 12ft high

Post a similar request >

03 Feb

Garden | Sheds

Inverness - IV2

Enquiry from: Norma M

Start Date: Immediate

i would like an area slabbed (approx 20 slabs 3x2) and a potting shed assembled on it. also a general garden tidy up are you the property owner: owner of the property do you have a: medium size garden...

Post a similar request >

14 May

Garden | Sheds

Alness - IV17

Enquiry from: Michael H

Start Date: Immediate

back and front garden twice a month are you the property owner: owner property type: semi detached do you have a: medium size garden garden type: back garden, front garden work required: lawn/turfing,...

Post a similar request >

14 May

Garden | Sheds

Alness - IV17

Enquiry from: Michael H

Start Date: Immediate

customer made an enquiry for garden shed and confirmed on the quotatis site they would like quotes from a carpenter.mr lives in the alness area and would like a call to discuss options.see below detai...

Post a similar request >

19 Apr

Kitchen | Fitting

Inverness - IV2

Enquiry from: Roger M

Start Date: Immediate

remove kitchen counter / worktops replace with new counters - laminate - on order from magnet inverness sink to be replaced with new - on order from magnet inverness are you the property owner: owner...

Post a similar request >

21 Jan

Garden | Sheds

Inverness - IV2

Enquiry from: Kathleen A

Start Date: Immediate

new garden shed remove grass and replace with gravel 2 conifers to be take out all shrubs need tidying up patio to be replaced raised beds small corner garden room to be built are you the property ow...

Post a similar request >

02 Nov

Garden | Decking

Inverness - IV63

Enquiry from: Paul W

Start Date: Immediate

riverside decking repair and alterations are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

25 Oct

Garden | Sheds

Inverness - IV2

Enquiry from: Morag M

Start Date: Immediate

moving in to a new build house and need a garden shed for storage are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: supply...

Post a similar request >

06 Jul

Garden | Decking

Inverness - IV3

Enquiry from: Jessie A

Start Date: Immediate

decking fence round it steps up to it and wood over top can't remember name of that are you the property owner: owner of the property what level of service do you require: supply and deck property ty...

Post a similar request >

30 Jun

Garden | Decking

Inverness - IV3

Enquiry from: JOHN M

Start Date: Immediate

cleaning of decking.if it is becoming rotten,removal of decking. are you the property owner: owner of the property property type: other what level of service do you require: deck only please call to ...

Post a similar request >

25 Jun

Garden | Decking

Inverness - IV3

Enquiry from: JOHN M

Start Date: Immediate

cleaning or removal ( if rotting) of decking in my courtyard which is 8.75x3.55 metres in size. are you the property owner: owner of the property property type: other what level of service do you requ...

Post a similar request >

23 Jun

Garden | Decking

Inverness - IV3

Enquiry from: Shona F

Start Date: Immediate

customer in the inverness area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the p...

Post a similar request >

21 Jun

Garden | Decking

Inverness - IV3

Enquiry from: Shona F

Start Date: Immediate

customer in the inverness area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the p...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Muir Of Ord is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Muir Of Ord £975-£2,495
Carpenters and joiners in Muir Of Ord £375-£575
Plasterboard dry lining in Muir Of Ord £638-£978
Wood flooring in Muir Of Ord £750-£1,150
Wooden decking in Muir Of Ord £1,125-£1,725
Garden shed in Muir Of Ord £450-£690
Wooden window repair in Muir Of Ord £320-£480

Related Carpenter searches in Muir Of Ord

Carpenter FAQs

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Muir Of Ord.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Muir Of Ord?

View our open Carpenter jobs near you

Join today
View Shortlist