Find a Carpenter you can trust in East Cowes.

Choose from 44 Carpenters, all rated by people like you.

Over 177 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

The Driveway Studio

1 review(s)
Offers services in EAST COWES
The Driveway Studio Ltd is your local specialist in resin driveways, tarmac, block paving, patio slabs, gravel driveways, ...
Verified Pro
Top 2 Bottom Plastering & Renovations is a Hampshire-based plastering company delivering high-quality workmanship from sta...
Over 50 Reviews

JM Fencing & Landscaping

89 review(s)
Offers services in EAST COWES
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...

Coastal Paving

2 review(s)
Offers services in EAST COWES
We are a landscaping / paving company we have been running for over 12 years We specialise in many aspects of outdoor l...
Please call for EMERGENCY storm damage to be repaired or replaced, 24 hour call out service! Ashbridge fencing & Landscap...

Recent Carpenter Enquiries

20 Jul

Garden | Decking

East Cowes - PO32

Enquiry from: Mrs S

Start Date: Immediate

Plastic decking to be put on the back of static home

Post a similar request >

18 Feb

Carpentry

Ryde - PO33

Enquiry from: Jackie T

Start Date: Immediate

Replace closed in staircase with spindles

Post a similar request >

03 Nov

Carpentry

Southsea - PO5

Enquiry from: Rachel M

Start Date: Immediate

A few inches shaved off bottom of new door. 2 pieces of skirting cut. Door closer mounted. Small job but would really help me out.

Post a similar request >

24 Jun

Garden | Decking

Southsea - PO4

Enquiry from: Rosalie W

Start Date: Immediate

repair and or replace decking area around edges where wood has disintegrated. repair and or replace a new step and make good a garden gate. all wood. are you the property owner: owner of the property ...

Post a similar request >

01 Apr

Kitchen | Fitting

Newport - PO30

Enquiry from: Susan H

Start Date: Immediate

all kitchen cupboard doors realigned. replace/repair bottom kitchen panel (the panel from the cupboards to the floor) to allow easy access to tumble dryer filter. are you the property owner: owner o...

Post a similar request >

12 Sep

Kitchen | Fitting

Cowes - PO31

Enquiry from: Edna J

Start Date: Immediate

refit a kitchen after drain (sink blockage) flooding accident. quote for repair and/or new kitchen required. are you the property owner: owner of the property what level of service do you require: i...

Post a similar request >

11 Aug

Carpentry

Lymington - SO41

Enquiry from: Debbie A

Start Date: Immediate

New kitchen fit using Howdens units plus laminate worktop (3 x 3m) roughly and breakfast bar, upstands

Post a similar request >

02 Oct

Garden | Decking

Ryde - PO33

Enquiry from: Andrew C

Start Date: Immediate

replacement of mall area of decking in courtyard plus advice on further works. are you the property owner: owner of the property property type: detached what level of service do you require: supply a...

Post a similar request >

07 Jun

Carpentry

Sandown - PO36

Enquiry from: Clive E

Start Date: Less than one month

dismantle 3 doors and re hang 3 new ones are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: other do you require a door(s): back d...

Post a similar request >

23 May

Garden | Decking

Southsea - PO4

Enquiry from: Natalie M

Start Date: Immediate

small area of decking needs replacing in small southsea garden half of garden is patio property type: terrace what level of service do you require: supply and deck are you the property owner: owner o...

Post a similar request >

14 May

Carpentry

Sandown - PO36

Enquiry from: Rob B

Start Date: 1 to 3 months

11 fire doors (3 int front door 1 external front door 7 int doors with int smoke seals furniture locks door closers 4 int bathroom doors labour only are you the property owner: owner of the property d...

Post a similar request >

12 Apr

Carpentry

Southsea - PO5

Enquiry from: Gail A

Start Date: Less than one month

i am looking to have some barn doors fitted in my basement dividing 2 rooms. wanting some advice on which system would work best and cost of fitting. are you the property owner: owner of the property ...

Post a similar request >

30 Mar

Garden | Decking

Totland Bay - PO39

Enquiry from: Jane L

Start Date: Immediate

raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...

Post a similar request >

24 Mar

Garden | Decking

Totland Bay - PO39

Enquiry from: Jane L

Start Date: Immediate

raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...

Post a similar request >

09 May

Garden | Decking

Southsea - PO4

Enquiry from: Rosie S

Start Date: Immediate

customer in southsea areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via telephone, sms and email at 09/05/2021 13:28.please call...

Post a similar request >

08 May

Garden | Sheds

Southsea - PO4

Enquiry from: Rosie S

Start Date: Immediate

ms requested quotes for garden maintenance from a landscaper around southsea. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information be...

Post a similar request >

16 Apr

Kitchen | Fitting

Newport - PO30

Enquiry from: Darren W

Start Date: Immediate

fit kitchen, 6 floor units, 5 wall units, sink, oven, hob, extractor, 6 led downlights, lay vinyl flooring and underlay approx 7ft sq are you the property owner: relative of owner what level of servi...

Post a similar request >

06 Mar

Garden | Decking

Ryde - PO33

Enquiry from: Michael D

Start Date: Immediate

build a wooden deck, approx 25 meter square on a cleared area of garden. are you the property owner: owner of the property property type: detached what level of service do you require: supply and dec...

Post a similar request >

22 Sep

Garden | Decking

Totland Bay - PO39

Enquiry from: Jessica B

Start Date: Immediate

would need 45sqm of millboard decking installed for a balcony project. the measurements from the slope to where the balcony should sit are 0.15cm from the shortest point and 0.3cm from the highest. a...

Post a similar request >

11 Aug

Carpentry

Southsea - PO4

Enquiry from: Chris M

Start Date: Immediate

shed already present. requires new windows in the front, new door. insulation needs replacing in the roof as bitumen liner is falling out. need a supply of electricity (6-8 sockets) and a water supply...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in East Cowes is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in East Cowes £975-£2,495
Carpenters and joiners in East Cowes £375-£575
Plasterboard dry lining in East Cowes £638-£978
Wood flooring in East Cowes £750-£1,150
Wooden decking in East Cowes £1,125-£1,725
Garden shed in East Cowes £450-£690
Wooden window repair in East Cowes £320-£480

Related Carpenter searches in East Cowes

Carpenter FAQs

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in East Cowes.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in East Cowes?

View our open Carpenter jobs near you

Join today
View Shortlist