Find a Carpenter you can trust in Freshwater.

Choose from 41 Carpenters, all rated by people like you.

Over 175 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

The Driveway Studio

1 review(s)
Offers services in FRESHWATER
The Driveway Studio Ltd is your local specialist in resin driveways, tarmac, block paving, patio slabs, gravel driveways, ...
Verified Pro
Top 2 Bottom Plastering & Renovations is a Hampshire-based plastering company delivering high-quality workmanship from sta...
Over 50 Reviews

JM Fencing & Landscaping

89 review(s)
Offers services in FRESHWATER
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...

Coastal Paving

2 review(s)
Offers services in FRESHWATER
We are a landscaping / paving company we have been running for over 12 years We specialise in many aspects of outdoor l...
Please call for EMERGENCY storm damage to be repaired or replaced, 24 hour call out service! Ashbridge fencing & Landscap...

Recent Carpenter Enquiries

03 Feb

Flooring | Wooden

Freshwater - PO40

Enquiry from: Janet B

Start Date: Immediate

Home owner Has parquet flooring in the lounge. It is in tile formation approx. 12'' squares. In places there are deep scores and wants it to be sanded and restored The room is 22'x16' approx. C...

Post a similar request >

18 Mar

Carpentry

Christchurch - BH23

Enquiry from: Gina B

Start Date: Less than one month

stair rail wall mounted with minimum protrusion from wall …maybe pigs ear rail. 4 metres. are you the property owner: owner of the property do you require a door(s): none what type of job are you lo...

Post a similar request >

25 Nov

Windows | Wooden | Repair

Christchurch - BH23

Enquiry from: Chris B

Start Date: Immediate

Repair of badly worn sash window. Wood work needs repair and in some places replacement

Post a similar request >

25 Oct

Flooring | Wooden

New Milton - BH25

Enquiry from: Jennifer N

Start Date: Immediate

We have just had wood flooring laid included in an insurance claim which has turned out to be far inferior to what we previously had. We have complained and they have asked for us to get a quote for r...

Post a similar request >

01 Apr

Kitchen | Fitting

Newport - PO30

Enquiry from: Susan H

Start Date: Immediate

all kitchen cupboard doors realigned. replace/repair bottom kitchen panel (the panel from the cupboards to the floor) to allow easy access to tumble dryer filter. are you the property owner: owner o...

Post a similar request >

15 Jan

Windows | Wooden | Repair

Bournemouth - BH6

Enquiry from: Joe T

Start Date: Immediate

We have 4 bay windows with original wooden frames that have been retrofitted to accomodate double glazed units. the exterior of the windows have UPVC trim on the. I beleive the wood is in good conditi...

Post a similar request >

12 Sep

Kitchen | Fitting

Cowes - PO31

Enquiry from: Edna J

Start Date: Immediate

refit a kitchen after drain (sink blockage) flooding accident. quote for repair and/or new kitchen required. are you the property owner: owner of the property what level of service do you require: i...

Post a similar request >

27 Jun

Carpentry

Christchurch - BH23

Enquiry from: Terry C

Start Date: Immediate

We have two internal doors to be trimmed and hung. The doors are: Ely 2 Glazed 6 Light - https://www.doorsofdistinction.co.uk/interior_doors/internal-prefinished-grooved_doors/Ely-2panel-varnished...

Post a similar request >

13 May

Carpentry

Bournemouth - BH6

Enquiry from: Ben C

Start Date: Immediate

Please send an email address so that we can email the drawings to you

Post a similar request >

26 Dec

Carpentry

Christchurch - BH23

Enquiry from: Susan P

Start Date: Immediate

Install Tongue and groove MDF panels lounge area

Post a similar request >

06 Sep

Carpentry

Christchurch - BH23

Enquiry from: Michelle W

Start Date: Immediate

hi we are the middle of an out door kitchen project builders doing retaining walls etc and carpenters availability to build a wooden covered outdoor kitchen area has changed so looking for a carpete...

Post a similar request >

11 Aug

Carpentry

Lymington - SO41

Enquiry from: Debbie A

Start Date: Immediate

New kitchen fit using Howdens units plus laminate worktop (3 x 3m) roughly and breakfast bar, upstands

Post a similar request >

19 May

Carpentry

New Milton - BH25

Enquiry from: Christopher M

Start Date: Immediate

Carpenter to help fit worktops in New Kitchen, fit doors, other carpentry.

Post a similar request >

07 Mar

Garden | Sheds

Christchurch - BH23

Enquiry from: Patricia T

Start Date: Immediate

It’s on council land outside our bungalow.It’s approx 50 ft tall .It’s roots are lifting the driveway leading to our front garden and the roots are wrapped around the water pipes underground.The...

Post a similar request >

23 Feb

Windows | Wooden | Repair

Southampton - SO45

Enquiry from: Colin G

Start Date: 1 to 3 months

the corner of an upstairs wooden window frame has rotted are you the property owner: owner of the property property type: detached what service are you looking for: frame repair how many windows are ...

Post a similar request >

14 Nov

Carpentry

New Milton - BH25

Enquiry from: Steve J

Start Date: Less than one month

supply and fit an interior door plain flat are you the property owner: tenant (with permission) property type: terrace time scale: less than one month what level of service do you require: supplied a...

Post a similar request >

30 Mar

Garden | Decking

Totland Bay - PO39

Enquiry from: Jane L

Start Date: Immediate

raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...

Post a similar request >

24 Mar

Garden | Decking

Totland Bay - PO39

Enquiry from: Jane L

Start Date: Immediate

raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...

Post a similar request >

14 Dec

Garden | Sheds

New Milton - BH25

Enquiry from: Peter W

Start Date: Immediate

grateful for a quote on behalf of my parents who are moving house. fair bit - about one skip full - of general garden rubbish including remains of small demolished shed at bottom end of large garden. ...

Post a similar request >

15 Oct

Garden | Decking

Christchurch - BH23

Enquiry from: Matt W

Start Date: Immediate

roughly 20/25 square meters of decking are you the property owner: owner of the property property type: detached what level of service do you require: deck only please call to appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Freshwater is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Freshwater £975-£2,495
Carpenters and joiners in Freshwater £375-£575
Plasterboard dry lining in Freshwater £638-£978
Wood flooring in Freshwater £750-£1,150
Wooden decking in Freshwater £1,125-£1,725
Garden shed in Freshwater £450-£690
Wooden window repair in Freshwater £320-£480

Related Carpenter searches in Freshwater

Carpenter FAQs

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to find an installer for wooden flooring?

After making the decision to install a new wooden flooring in your home, the next obvious step is finding the right installer to get the job done. When a wooden floor is fitted and properly maintained by the right professional, it will not only outlive the owner but also survive several generations. As a result, finding the perfect installer for your task should be a top priority to get the best return on investment. Here are a few sources that will put you in the right direction to finding a reliable wood flooring installation company.

• Friends, Relatives & Neighbours

If you have a friend, relative or neighbour that has a wooden floor installed in their homes, you can go for a visit to check out the work done. If you’re pleased with the work done, you can proceed to ask about the work ethics of the installer and get the contact if satisfied.

• Store Contact Lists

You’ll discover a long list of wooden flooring contractors on many stores trading flooring materials. These installers may not be affiliated with the store owners, but many stores see it as their responsibility to point you in the right direction so that the flooring material acquired from them can be put to good use.

• Internet

With the rapid rise of online technology, there’s hardly a service you can’t find on the internet. Websites like HomeAdvisor have been helping people find their desired service providers with relative ease for so long. To get the right installer online, it’s advisable to check reviews as well as testimonials before moving forward. Nowadays, you’re most likely going to find so many positive online reviews as some businesses now go to the extent of dubiously writing good reviews for their companies. As a result, it’s recommended to pay closer attention to the negative reviews and check if it’s something you can cope with before hiring an installer for your wooden flooring.

Click here to learn more about wood flooring.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Freshwater.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Freshwater?

View our open Carpenter jobs near you

Join today
View Shortlist