Carpentry
Greenhithe - DA9
Enquiry from: Thea P
Start Date: Immediate
Some coving putting up in a small sized bedroom. Ideally asap. Thank you
Over 391 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Greenhithe - DA9
Enquiry from: Thea P
Start Date: Immediate
Some coving putting up in a small sized bedroom. Ideally asap. Thank you
Greenhithe - DA9
Enquiry from: Amir B
Start Date: 1 to 3 months
hi we are looking to get two internal doors fitted to our two bedrooms, they would need doors, frame, locks, handle etc, as at moment all it is just a hole in the wall, the previous owners did it like...
Greenhithe - DA9
Enquiry from: Betty W
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: To create a whole new garden, adding new fencing and adding patio / wood decking...
Greenhithe - DA9
Enquiry from: Charles C
Start Date: Immediate
Home Owner Supplied and Fitted Call to Appoint
Greenhithe - DA9
Enquiry from: Nikita C
Start Date: Immediate
Homeowner Please contact to appoint
Greenhithe - DA9
Enquiry from: Angie M
Start Date: 1 to 3 months
kitchen to be fitted
Greenhithe - DA9
Enquiry from: Nathalie T
Start Date: Immediate
Potential project: Fitted wardrobe, length approx. 190 cm, hight approx.230cm, depth approx. 60 cm
London - SE26
Enquiry from: Omer H
Start Date: Immediate
Kitchen fit out including walls (tiling) and flooring (tiling), radiator replacement. We would like to retain exiting frame structure and replace unit panels, sink and worktop.
London - SE6
Enquiry from: Oloruntoba E
Start Date: Immediate
Replace garden gate and repair conservatory
London - SE14
Enquiry from: Sara H
Start Date: Immediate
Hello, We are looking at adding a meeting room onto our mezzanine (please email me so I can share images and dimensions). For this, we are looking at low cost partition walls. We will need 3 x walls...
London - SE20
Enquiry from: Diana Y
Start Date: Immediate
to place a wooden deck, about 4*3 metres are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint
London - SE13
Enquiry from: Yoni S
Start Date: Immediate
replacement of wooden frame. current one is crumbing. not a sash window, but a fixed unopenable one. ground floor in bathroom
Beckenham - BR3
Enquiry from: Sarah E
Start Date: Immediate
fit a u-shaped kitchen with integrated appliances are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for yo...
London - E14
Enquiry from: Sahanara R
Start Date: Immediate
garden patio and cleaning weed disposing waste and rubbish designing a small theme for corner of garden are you the property owner: tenant (with permission) property type: other do you have a: small g...
London - E14
Enquiry from: Sahanara R
Start Date: Immediate
customer in the london area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prop...
Beckenham - BR3
Enquiry from: Debbie G
Start Date: Immediate
hi, i’m moving to ystrad mynach this spring and the house will have a steep garden. i’d like quotes on levelling it please are you the property owner: owner property type: detached do you have a: ...
Beckenham - BR3
Enquiry from: Lisa D
Start Date: Immediate
Would like cupboards with shelves built in lounge area alcoves
Beckenham - BR3
Enquiry from: Kristy W
Start Date: Immediate
ms requested quotes for wooden decking from a carpenter around beckenham. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below ...
London - E14
Enquiry from: Amy W
Start Date: Immediate
several pieces of my floor were burnt accidentally and there were several blackened marks on the wooden floor, please contact me via email are you the property owner: relative of owner how many rooms...
London - SE8
Enquiry from: John D
Start Date: Immediate
customer requested quotes for wooden decking from a carpenter around london. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information bel...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Greenhithe | £1,475-£3,665 |
| Carpenters and joiners in Greenhithe | £375-£575 |
| Plasterboard dry lining in Greenhithe | £638-£978 |
| Wood flooring in Greenhithe | £750-£1,150 |
| Wooden decking in Greenhithe | £1,125-£1,725 |
| Garden shed in Greenhithe | £450-£690 |
| Wooden window repair in Greenhithe | £320-£480 |
Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
How To Dot And Dab A Plasterboard
If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!
• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.
• Ensure the wall’s height is 15mm more than the plasterboard
• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.
• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.
• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.
• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.
• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Greenhithe.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today