Find a Carpenter you can trust in Rochester.

Choose from 122 Carpenters, all rated by people like you.

Over 304 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in ROCHESTER
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified Pro

House of Glass

2 review(s)
Offers services in ROCHESTER
House of Glass ltd are a genuine, family run, home improvement company specialising in replacement windows & doors , conse...
Verified ProOver 20 Reviews

CRS Contractors

20 review(s)
Offers services in ROCHESTER
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified ProOver 10 Reviews
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

White Cliff Gardens

2 review(s)
Offers services in ROCHESTER
We cater for all your gardening/landscaping needs. 
We offer a wide range of services to suit all budgets, including: •...
Verified Pro

Furnish Home

0 review(s)
Offers services in ROCHESTER
We Provide Loft Conversions, Boarding, Loft Insulation, Hatch, Ladders, Velux, plasterboarding & Loft Storage Solutions in...

Recent Carpenter Enquiries

13 May

Garden | Decking

Rochester - ME1

Enquiry from: George M

Start Date: Immediate

there is a small section of my garden beside the house that i am wanting to get decking setup for. it's about 2x4m, but we're wanting to set it up as a seating area. it's on a slight slope as well, wi...

Post a similar request >

03 Jul

Garden | Sheds

Rochester - ME2

Enquiry from: Prasun A

Start Date: Immediate

gardening notes: as part of diligence, i’m looking for some quotes. our old conservatory joins onto the back of the house. currently, the conservatory leads to the garden via a back door situated on...

Post a similar request >

13 Jun

Garden | Decking

Rochester - ME3

Enquiry from: Shaun U

Start Date: Immediate

hi, my mower broke down an it will take another week to be returned. the lawn is growing rapidly and i would like to have the grass cut.please let me know if this is a service you are able to offer.lo...

Post a similar request >

23 Sep

Garden | Decking

Rochester - ME2

Enquiry from: Berna A

Start Date: Immediate

i would like my decking refitted. are you the property owner: owner of the property what level of service do you require: deck only please call to appoint

Post a similar request >

05 Dec

Garden | Decking

Rochester - ME2

Enquiry from: Margaret C

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Various gardening and maintenance jobs to trees and fencing.I.E; grass cutti...

Post a similar request >

19 Feb

Carpentry

Rochester - ME3

Enquiry from: CHERILYNN W

Start Date: Less than one month

Supply and install a curved head french door made of treated wood in a particular size of 5ft tall x 3ft wide.

Post a similar request >

11 Feb

Garden | Decking

Rochester - ME1

Enquiry from: Donna M

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: We are looking to have some decking built and our small garden cleared and lands...

Post a similar request >

19 Oct

Kitchen | Fitting

Rochester - ME2

Enquiry from: Melissa H

Start Date: Immediate

Submit your free quote for rated tradespeople

Post a similar request >

11 Oct

Garden | Decking

Rochester - ME1

Enquiry from: Kevin W

Start Date: 1 to 3 months

Are you the property owner: Owner Property Type: Semi detached Other Forms: None Please call to appoint

Post a similar request >

22 Sep

Garden | Sheds

Rochester - ME2

Enquiry from: Clare B

Start Date: Less than one month

Are you the property owner: Owner Property Type: Semi detached Other Forms: None Please call to appoint

Post a similar request >

22 Sep

Garden | Decking

Rochester - ME2

Enquiry from: Clare B

Start Date: Less than one month

Are you the property owner: Owner Property Type: Semi detached Other Forms: None Please call to appoint

Post a similar request >

12 Aug

Flooring | Wooden

Rochester - ME2

Enquiry from: Cristina M

Start Date: Immediate

Home Owner Call to Appoint

Post a similar request >

29 Jun

Garden | Sheds

Rochester - ME2

Enquiry from: Jack E

Start Date: 1 to 3 months

Replace Shed and construct fence in Front Garden, Construct Base and Build shed with light and Power in Back Garden, Replace fencing and Paint all existing Woodwork Are you the property owner: Owner o...

Post a similar request >

22 Jun

Kitchen | Fitting

Rochester - ME3

Enquiry from: David B

Start Date: Less than one month

Few cupboards to be installed. Worktops sink and tap. Plastering require but need to discuss. Are you the property owner: Owner of the property What level of service do you require: Install Only Do ...

Post a similar request >

30 Apr

Garden | Decking

Rochester - ME1

Enquiry from: Wendy H

Start Date: Immediate

garden maintenance and wooden decking

Post a similar request >

25 Dec

Carpentry

Rochester - ME1

Enquiry from: A

Start Date: 1 to 3 months

Kitchen unit to be adjusted to allow space to fit a slightly bigger freestanding cooker (90cm) Time scale: 1-3 months

Post a similar request >

18 Jul

Garden | Decking

Rochester - ME2

Enquiry from: Kelly G

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Tidy up, restrain decking and cut Finn tree branch

Post a similar request >

05 Jun

Garden | Decking

Rochester - ME2

Enquiry from: S

Start Date: Immediate

7m x 3m decking on sloping ground. one end at ground level the other at height of 450mm.

Post a similar request >

16 Jan

Carpentry

Rochester - ME1

Enquiry from: Shweta K

Start Date: Immediate

Replacement of severely Burnt carpet patch

Post a similar request >

22 Sep

Carpentry

Rochester - ME2

Enquiry from: Simon T

Start Date: Immediate

Could you please provide with a quote to remove an existing fire door and dispose. To supply and install 1no new single leave steel door and frame into the same opening, nominally 740mm wide x 1905mm ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Rochester is:

£1,039

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Rochester £1,475-£3,665
Carpenters and joiners in Rochester £375-£575
Plasterboard dry lining in Rochester £638-£978
Wood flooring in Rochester £750-£1,150
Wooden decking in Rochester £1,125-£1,725
Garden shed in Rochester £450-£690
Wooden window repair in Rochester £320-£480

Related Carpenter searches in Rochester

Carpenter FAQs

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Rochester.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Rochester?

View our open Carpenter jobs near you

Join today
View Shortlist