Find a Carpenter you can trust in Swanley.

Choose from 167 Carpenters, all rated by people like you.

Over 416 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in SWANLEY
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 20 Reviews

CRS Contractors

20 review(s)
Offers services in SWANLEY
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified Pro
My company has been working for over 50 years. l am James any garden we can sort out make it all worth the ef...
Verified ProOver 10 Reviews
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

Furnish Home

0 review(s)
Offers services in SWANLEY
We Provide Loft Conversions, Boarding, Loft Insulation, Hatch, Ladders, Velux, plasterboarding & Loft Storage Solutions in...

Recent Carpenter Enquiries

10 Apr

Carpentry

Swanley - BR8

Enquiry from: Chisom E

Start Date: Immediate

Repairs with the flooring and stairs, reworking the fireplace, realigning kitchen cabinets, removing a shelf etc.

Post a similar request >

16 Sep

Carpentry

Swanley - BR8

Enquiry from: Kelly Z

Start Date: Immediate

hi, i am looking for a front door installation service right now, i will buy a new door by myself. however, i am not sure the correct size of the door. i would like to ask someone to come to measure t...

Post a similar request >

06 Feb

Kitchen | Fitting

Swanley - BR8

Enquiry from: Dorcas G

Start Date: Immediate

Cupboards face lift and replacing built in oven and freezer. Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required materi...

Post a similar request >

08 Jul

Garden | Decking

Swanley - BR8

Enquiry from: Katie H

Start Date: Immediate

Great, what do you need done? Supply and Installation Ok, what size area are you looking to deck? More than 20sq ft Great, what do you need done? Supply and Installation We only need installation of a...

Post a similar request >

09 May

Garden | Decking

Swanley - BR8

Enquiry from: Brian W

Start Date: Immediate

Existing decking L shape overall 16sqm raised 53cm with 3 steps down - Estimated Service Date: 01/07/2016 - Estimated Decking Area (sq ft): 16sq metres - Reason for Request: To just have an idea of th...

Post a similar request >

23 Mar

Carpentry

Swanley - BR8

Enquiry from: Diane P

Start Date: Immediate

Home owner Semi detached To fit 4 new interior doors, including framework Please contact to appoint *

Post a similar request >

26 Apr

Kitchen | Fitting

London - SW17

Enquiry from: Paula B

Start Date: Immediate

Look for a skilled kitting fitter to put in new kitchen units , oven hob .. must be able to put in a hob , electrics . Small kitchen .

Post a similar request >

14 Nov

Garden | Sheds

Carshalton - SM5

Enquiry from: Einar K

Start Date: Immediate

replace large sections of wooden cladding on garden shed. are you the property owner: owner of the property do you have a: medium size garden

Post a similar request >

29 Aug

Garden | Decking

London - SW12

Enquiry from: Jenny M

Start Date: Immediate

customer made an enquiry for wooden decking and confirmed on the local quotes site they would like quotes from a carpenter.miss lives in the london area and would like a call to discuss options.see be...

Post a similar request >

11 Aug

Interior work | Stud Walls

London - SW8

Enquiry from: Saba K

Start Date: Immediate

I'm looking to install a non-permanent or semi-permanent partition wall in my one-bedroom flat in London to create a second bedroom space. Here are the details: Wall size: approx. 2 metres x 4 metre...

Post a similar request >

21 Feb

Garden | Decking

London - SW8

Enquiry from: Lujun Z

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on telephone, sms and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. a...

Post a similar request >

11 Jun

Kitchen | Fitting

London - SW16

Enquiry from: Zak K

Start Date: Immediate

kitchen units and appliances to be fitted. electrical plumbing and flooring will also need to be done. are you the property owner: owner of the property what level of service do you require: install o...

Post a similar request >

13 May

Carpentry

London - SW16

Enquiry from: Sinead M

Start Date: Immediate

entrance steps damp penetration from the top of the concrete steps through the concrete which is causing the steel reinforcement to corrode and expand and 'blow' the surrounding concrete. are you the...

Post a similar request >

04 May

Kitchen | Fitting

London - SW4

Enquiry from: James D

Start Date: Immediate

IKEA kitchen fitting - 6 units, hob fitting, built in oven fitting, sink and plumbing connected and worksurface connected.

Post a similar request >

15 Mar

Garden | Sheds

Coulsdon - CR5

Enquiry from: Daniel L

Start Date: Immediate

an area at the top of the garden to be excv are you the property owner: owner of the property property type: semi detached roughly the size of your garden: 31+ m2 garden type: back garden do you have ...

Post a similar request >

09 Mar

Garden | Decking

Coulsdon - CR5

Enquiry from: Rachel W

Start Date: Immediate

weeding required and potentially more jobs in the future are you the property owner: owner property type: terrace do you have a: medium size garden garden type: back garden, front garden current state...

Post a similar request >

14 Aug

Garden | Decking

London - SW2

Enquiry from: Angela R

Start Date: Immediate

ms requested quotes for wooden decking from a landscaper around london. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is...

Post a similar request >

14 Aug

Garden | Sheds

London - SW2

Enquiry from: Angela R

Start Date: Immediate

landscaping and decking with clearance of weeds and garden design with plants and tress put in are you the property owner: owner of the property property type: semi detached roughly the size of your g...

Post a similar request >

29 Jul

Windows | Wooden | Repair

London - SW12

Enquiry from: Genevieve W

Start Date: Immediate

i need my whole wooden window frame changed and 1 side glass of it is broken single glaze . property type: semi detached what service are you looking for: frame repair how many windows are involved: ...

Post a similar request >

01 Jul

Garden | Decking

London - SW2

Enquiry from: Cecilia F

Start Date: Immediate

my small garden requires the bushes to be removed, fencing on 2 sides and the main floor area to be properly paved or half decking an half paved. low maintenance design deas are welcome are you the p...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Swanley is:

£1,095

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Swanley £1,475-£3,665
Carpenters and joiners in Swanley £375-£575
Plasterboard dry lining in Swanley £638-£978
Wood flooring in Swanley £750-£1,150
Wooden decking in Swanley £663-£3,363
Garden shed in Swanley £300-£545
Wooden window repair in Swanley £320-£480

Related Carpenter searches in Swanley

Carpenter FAQs

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Swanley.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Swanley?

View our open Carpenter jobs near you

Join today
View Shortlist