Find a Carpenter you can trust in Blackpool.

Choose from 76 Carpenters, all rated by people like you.

Over 47 reviews & an average rating of 3.8/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

JPW property care

0 review(s)
Offers services in BLACKPOOL
We are a Family run business . With over 35 years experience. Between us with our small team. we pride ourselves on our ho...
Verified Pro

M6 Flooring

0 review(s)
Offers services in BLACKPOOL
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

Jd paving

0 review(s)
Offers services in BLACKPOOL
My names John from JD PAVING we are a proud family run business and got over 50+ experience in the landscaping industry we...
Verified Pro

Lakes Joinery Co.

0 review(s)
Offers services in BLACKPOOL
Expert joiners offering a wide range of services to customers in Ulverston, Barrow and the surrounding areas.
Verified Pro

Banks Flooring Solutions

0 review(s)
Offers services in BLACKPOOL
Here at Banks Flooring Solutions, we offer flooring products such as luxury vinyl tile, vinyl, cushion floor vinyl, carpet...

Recent Carpenter Enquiries

12 Apr

Garden | Decking

Blackpool - FY1

Enquiry from: Colin R

Start Date: Immediate

To fit and supply decking 300x186 and remove old decking same size.

Post a similar request >

13 Apr

Garden | Sheds

Blackpool - FY3

Enquiry from: Julie H

Start Date: Immediate

Kitchen improvement front of the house lights back of the house improvement new garden shed wall insulation

Post a similar request >

15 May

Garden | Decking

Blackpool - FY1

Enquiry from: Paul S

Start Date: Immediate

i would like some decking put in my back garden taking out the lawn half my back garden is already concrete. i would like to get some quotes to have this work done thanks . are you the property owner:...

Post a similar request >

10 Apr

Carpentry

Blackpool - FY1

Enquiry from: Adam B

Start Date: Immediate

internal fire door to be supplied and hung, i have the lock mechanism to fit are you the property owner: owner of the property property type: commercial what type of job are you looking to have done: ...

Post a similar request >

23 Mar

Carpentry

Blackpool - FY3

Enquiry from: Tony S

Start Date: Immediate

the front door of the flat is damaged. either needs repairing or total replacement. are you the property owner: owner of the property property type: terrace what type of job are you looking to have d...

Post a similar request >

10 Dec

Garden | Sheds

Blackpool - FY1

Enquiry from: Fleur D

Start Date: Immediate

i need an old shed, general waste, some soil & rubble removed asap. i've been advised to hire a skip but i am unable to move all the rubbish into a skip myself as it's to big a job. are you the proper...

Post a similar request >

04 Jul

Garden | Decking

Blackpool - FY1

Enquiry from: Anna B

Start Date: Immediate

interested in a decking around the house, approx. 16 sqm area. with a roof covering over part of the decking, approx. 10 sqm. are you the property owner: owner of the property property type: semi deta...

Post a similar request >

17 May

Garden | Decking

Blackpool - FY3

Enquiry from: Jake S

Start Date: Immediate

customer made an enquiry for wooden decking and confirmed on the quotatis site they would like quotes from a landscaper.customer lives in the blackpool area and would like a call to discuss options.se...

Post a similar request >

01 Nov

Carpentry

Blackpool - FY1

Enquiry from: Joseph J

Start Date: Immediate

bedroom door is hanging off it’s hinges, it either needs fixing/screwing back in or a new white bedroom door fitted. how much would it cost to either screw it back in or a new door if required? are ...

Post a similar request >

19 Oct

Carpentry

Blackpool - FY1

Enquiry from: Nathan D

Start Date: Immediate

got 1 bedroom door needs hanging and locks fitted etc. and then have 2 more when carpet gets fitted but need bedroom door fitting to keep the heat in during the cold nights time scale: immediate pleas...

Post a similar request >

28 Apr

Kitchen | Fitting

Blackpool - FY3

Enquiry from: David C

Start Date: Immediate

We need a kitchen fitter to remove old kitchen and worktop and replace with new, also we require a window person to replace all upcv windows and front and rear door there are 13 windows to replace. we...

Post a similar request >

25 Nov

Carpentry

Blackpool - FY1

Enquiry from: David C

Start Date: Immediate

3 internal doors fitting all furniture here

Post a similar request >

25 Nov

Carpentry

Blackpool - FY1

Enquiry from: David C

Start Date: Less than one month

3 internal doors fitting Time scale: Less than one month Please call to appoint

Post a similar request >

28 May

Carpentry

Blackpool - FY4

Enquiry from: Kate B

Start Date: Immediate

Homeowner Please contact to appoint

Post a similar request >

27 Jun

Kitchen | Fitting

Blackpool - FY1

Enquiry from: Lesley N

Start Date: Immediate

Submit your free quote for rated tradespeople

Post a similar request >

18 Apr

Garden | Decking

Blackpool - FY3

Enquiry from: Stuart F

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Current Garden is lawned with overgrown trees round the outside, would like ide...

Post a similar request >

31 Jan

Carpentry

Blackpool - FY4

Enquiry from: Rowland F

Start Date: Immediate

Fix new hinge to garage door, have hinge but need the bolt, 2. fasten loose panel boardsback to garage door. 3 make adjustments to back gate so that it will close. 4. similar ajustments to small fro...

Post a similar request >

22 Aug

Kitchen | Fitting

Blackpool - FY2

Enquiry from: Allan T

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 2500x3500, Property type: Flat, apartment, Work description: Haddon Court Flats Ground Floor FY2 9BB ...

Post a similar request >

07 Jun

Windows | Wooden | Repair

Blackpool - FY4

Enquiry from: Miss H

Start Date: Immediate

upper side window glass replacement?temp repair

Post a similar request >

04 Oct

Kitchen | Fitting

Blackpool - FY4

Enquiry from: D

Start Date: Immediate

Replacement kitchen doors and new work tops.

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Blackpool is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Blackpool £975-£2,495
Carpenters and joiners in Blackpool £375-£575
Plasterboard dry lining in Blackpool £638-£978
Wood flooring in Blackpool £750-£1,150
Wooden decking in Blackpool £1,125-£1,725
Garden shed in Blackpool £450-£690
Wooden window repair in Blackpool £320-£480

Related Carpenter searches in Blackpool

Carpenter FAQs

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to find an installer for wooden flooring?

After making the decision to install a new wooden flooring in your home, the next obvious step is finding the right installer to get the job done. When a wooden floor is fitted and properly maintained by the right professional, it will not only outlive the owner but also survive several generations. As a result, finding the perfect installer for your task should be a top priority to get the best return on investment. Here are a few sources that will put you in the right direction to finding a reliable wood flooring installation company.

• Friends, Relatives & Neighbours

If you have a friend, relative or neighbour that has a wooden floor installed in their homes, you can go for a visit to check out the work done. If you’re pleased with the work done, you can proceed to ask about the work ethics of the installer and get the contact if satisfied.

• Store Contact Lists

You’ll discover a long list of wooden flooring contractors on many stores trading flooring materials. These installers may not be affiliated with the store owners, but many stores see it as their responsibility to point you in the right direction so that the flooring material acquired from them can be put to good use.

• Internet

With the rapid rise of online technology, there’s hardly a service you can’t find on the internet. Websites like HomeAdvisor have been helping people find their desired service providers with relative ease for so long. To get the right installer online, it’s advisable to check reviews as well as testimonials before moving forward. Nowadays, you’re most likely going to find so many positive online reviews as some businesses now go to the extent of dubiously writing good reviews for their companies. As a result, it’s recommended to pay closer attention to the negative reviews and check if it’s something you can cope with before hiring an installer for your wooden flooring.

Click here to learn more about wood flooring.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Blackpool.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Blackpool?

View our open Carpenter jobs near you

Join today
View Shortlist