Find a Carpenter you can trust in Carnforth.

Choose from 22 Carpenters, all rated by people like you.

Over 59 reviews & an average rating of 4.3/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Abacus Restoration

38 review(s)
Offers services in CARNFORTH
With over 25 years of experience, Abacus Restoration specialises in the repair, restoration and ongoing maintenance of uPV...
Local run family business with over 40yrs experience in all aspects of Groundwork’s and Landscaping. Specialising in Tarma...
With over 15 years experience we are highly experienced professionals based in West Yorkshire who specialise in tree and l...

Elizabeth Hope

0 review(s)
Offers services in CARNFORTH
Elizabeth Hope off a full turnkey solution for Masterclass Kitchens & Bathrooms to Love covering Manchester & Greater Manc...

Trafford

0 review(s)
Offers services in CARNFORTH
If you’re looking for high-quality patios and driveways in manchester, and the surrounding areas , look no further than Tr...

Recent Carpenter Enquiries

24 Jun

Carpentry

Carnforth - LA5

Enquiry from: Jane L

Start Date: Immediate

Not sure if you do such lowly jobs but we have just moved to an apartment at The Grange and need some large pictures hanging.

Post a similar request >

24 Jan

Carpentry

Carnforth - LA5

Enquiry from: Joel H

Start Date: Immediate

Hi, I'm looking to replace my old kitchen with an exact, like-for-like one which someone in Sheffield is prepared to build for me. I need someone to measure up for me, rip out the old kitchen and fit ...

Post a similar request >

17 Jan

Kitchen | Fitting

Carnforth - LA5

Enquiry from: Penelope G

Start Date: Immediate

it is a remake really - i need the crown mitres removing from 5 tall cupboards - all kickboards taking off and refitting after floor sorted with breather spaces - one half of a tall cupboard (2 togeth...

Post a similar request >

23 Nov

Kitchen | Fitting

Carnforth - LA6

Enquiry from: Kirsty D

Start Date: Immediate

we require some laminate worktops fitting along with sink cut out asap are you the property owner: owner of the property what level of service do you require: install only do you have all of the requi...

Post a similar request >

30 Oct

Carpentry

Carnforth - LA5

Enquiry from: Priscilla N

Start Date: Immediate

i need 4 internal doors fitting upstairs asap please after being let down at short notice by my joiner are you the property owner: owner of the property what type of job are you looking to have done:...

Post a similar request >

22 Sep

Garden | Sheds

Carnforth - LA6

Enquiry from: D. M

Start Date: 1 to 3 months

10x8 double doors two windows apex roof erected and delivered are bearers extra? Time scale: 1-3 months

Post a similar request >

25 Feb

Garden | Decking

Carnforth - LA6

Enquiry from: Gareth H

Start Date: Immediate

Raised decking required at my static cara van, 3m X 4m and stepping up from 0.75m to 1.3 m with steps , hand rails an doors to create storage area underneath Are you the property owner: Owner of the...

Post a similar request >

19 Jan

Kitchen | Fitting

Carnforth - LA5

Enquiry from: David B

Start Date: Immediate

replace new hinges on fridge & freezer doors Homeowner Please contact to appoint

Post a similar request >

14 Aug

Garden | Decking

Morecambe - LA4

Enquiry from: Donna S

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

I would like a quote for new decking at the back of my house please

Post a similar request >

18 Jul

Carpentry

Kendal - LA9

Enquiry from: Jerish G

Start Date: Immediate

Some one to sort my kitchen please

Post a similar request >

23 Feb

Carpentry

Kendal - LA8

Enquiry from: Sylvia B

Start Date: Immediate

I have 8 new doors that need hanging 7 normal doors and one sliding door, which I have to track for plus 1 bifold that needs moving. I have all the hinges and handles.

Post a similar request >

23 Feb

Flooring | Wooden

Kendal - LA9

Enquiry from: Alastair M

Start Date: Immediate

removal and reinstatement of skirting boards after fitting of laminate flooring - c 12 m.

Post a similar request >

03 Sep

Interior work | Stud Walls

Lancaster - LA2

Enquiry from: Iain W

Start Date: Immediate

L23m x H2.5m stud walling + 200msq of plasterboard majority of plasterboard is onto block walling, stud walling requires plasterboard to both sides. No plaster required.

Post a similar request >

25 Aug

Garden | Sheds

Lancaster - LA1

Enquiry from: Claire B

Start Date: Immediate

erection of metal shed 10 x 8 on paving in rear garden. are you the property owner: owner of the property do you have a: large garden what level of service are you looking for: install please call to...

Post a similar request >

19 Aug

Garden | Sheds

Kendal - LA9

Enquiry from: Tracy G

Start Date: Immediate

assemble a 6 x 8 summerhouse onto our ready made base are you the property owner: tenant (with permission) do you have a: medium size garden what level of service are you looking for: install please ...

Post a similar request >

06 Jun

Garden | Sheds

Lancaster - LA1

Enquiry from: Lindsay V

Start Date: Immediate

A base laying for a 8x6 ft shed

Post a similar request >

18 May

Garden | Sheds

Milnthorpe - LA7

Enquiry from: John K

Start Date: Immediate

We would like a 6’x4’ or 6’x3’ shed either wood or concrete put up please we have a slabbed area surrounded by a much bigger gravelled area.

Post a similar request >

09 Mar

Carpentry

Morecambe - LA3

Enquiry from: Pauline J

Start Date: Immediate

We think you put in some wood windows in for us a number of years ago. 2 dg units in the bedrooms have failed (not in the windows you put in) would you be able to replace them?

Post a similar request >

07 Mar

Carpentry

Morecambe - LA3

Enquiry from: Pauline J

Start Date: Immediate

Are you able to replace 2 failed dg units in our wooden bedroom windows,? Thanks

Post a similar request >

06 Jan

Carpentry

Lancaster - LA1

Enquiry from: Carol M

Start Date: Immediate

Would like to divide a large living room into 2 by building a partition wall with door Wondering how much it might cost

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Carnforth is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Carnforth £975-£2,495
Carpenters and joiners in Carnforth £375-£575
Plasterboard dry lining in Carnforth £638-£978
Wood flooring in Carnforth £750-£1,150
Wooden decking in Carnforth £1,125-£1,725
Garden shed in Carnforth £450-£690
Wooden window repair in Carnforth £320-£480

Related Carpenter searches in Carnforth

Carpenter FAQs

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How much does it cost to hang a door?

Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.

• Door & Frame Installation Job and the average Cost in £'s

• uPVC door installation including glazing & architrave costs around £90 per door

• uPVC french & patio door sets including glazing & architrave costs around £120 per pair

• Softwood french & patio door sets including architrave costs around £180 per door

• Hardwood french & patio door sets including architrave would cost around £250 per pair

• Softwood internal door hanging only would be around £40 per door

• Hardwood internal door hanging only would set you back around £48 per door

• Softwood external door hanging only is around £60 per door

• Hardwood external door hanging would cost around £70 per door

• Locks, letterboxes & door furniture timber doors are around £15 per Item

• Glazing £15 per pane

• Brick cut-outs single doors is around £60 per cut-out

• French or patio door brick cut-outs will be around £90 per cut-out

• New lintels will cost around £150 per lintel

Door Repair Costs and Charges

Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.

Average Cost of Door Repair Job

Replacement glazing units for uPVC doors will be around £15 per unit

Replacement glazing units for timber doors is around £20 per unit

Replacement door glass pined & putty will cost£30 per pane

Replacement handles are around £10 each and general repair work will cost you £25 per hour

Building & FENSA certificate charges

FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.

Average Cost of Window Repair Job: One to two doors will cost around £85

Average Cost of Door Fixtures & Fittings Removal Job

Removing internal doors will cost around £10

Removing internal door liners will cost around £15

Removing external timber doors will cost about £10

Removing External timber door frame will be around £20

Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.

How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Carnforth.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Carnforth?

View our open Carpenter jobs near you

Join today
View Shortlist